mcAfee Secure Website
exam =5
exam =6

Exam Code: NS0-165

Exam Name: NetApp Certified Data Administrator, ONTAP

Certification Provider: Network Appliance

Corresponding Certification: NCDA ONTAP

Network Appliance NS0-165 Questions & Answers

Reliable & Actual Study Materials for NS0-165 Exam Success

60 Questions & Answers with Testing Engine

"NS0-165: NetApp Certified Data Administrator, ONTAP" Testing Engine covers all the knowledge points of the real Network Appliance NS0-165 exam.

The latest actual NS0-165 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at NS0-165 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Network Appliance Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Network Appliance NS0-165 Practice Test 39

Question 380

A NetApp ONTAP administrator must resolve this situation: A switch trunk remains at standard MTU despite jumbo frames on both endpoints. Which TWO choices form a defensible remediation-and-acceptance pair? (Select TWO.)

  1. The LIF has usable failover targets and an end-to-end client test succeeds during controlled port failure.
  2. Inspect ONTAP port statistics and fabric counters for drops, errors or saturation before resizing storage systems.
  3. Verify end-to-end MTU support across ONTAP ports, host NICs and intervening switches when using jumbo frames.
  4. Inspect LIF operational state, current home port, port link state and VLAN tagging before changing storage protocols.
  5. A correctly sized test packet and representative storage workload pass without fragmentation-related loss.

Explanation

Correct Answers

C:

This is the proposed corrective action for: A switch trunk remains at standard MTU despite jumbo frames on both endpoints. The action addresses the ONTAP failure mechanism: A partially configured jumbo-frame path can drop large packets even while small pings succeed.

E:

This provides separate verification for the same issue: A switch trunk remains at standard MTU despite jumbo frames on both endpoints. The outcome tests whether remediation is effective and can be recorded as acceptance evidence.

Incorrect Answers

A:

The LIF has usable failover targets and an end-to-end client test succeeds during controlled port failure. The paired controls concern network mtu and frame handling, not that measure.

B:

Inspect ONTAP port statistics and fabric counters for drops, errors or saturation before resizing storage systems. The network mtu and frame handling implementation and safeguard are still missing.

D:

Inspect LIF operational state, current home port, port link state and VLAN tagging before changing storage protocols. This does not supply the required network mtu and frame handling action-and-control pair.

Question 381

During a storage operations review for a regulated healthcare records provider, the team observes: An iSCSI host uses a larger MTU than the storage network can forward. The decision must maintain patient data and application recovery obligations. Which engineering choice most directly solves this problem?

  1. Trace actual configured LIF failover targets, broadcast domains and path availability when a node maintenance event causes connectivity loss.
  2. Verify end-to-end MTU support across ONTAP ports, host NICs and intervening switches when using jumbo frames.
  3. Inspect LIF operational state, current home port, port link state and VLAN tagging before changing storage protocols.
  4. Inspect ONTAP port statistics and fabric counters for drops, errors or saturation before resizing storage systems.

Explanation

Correct Answer

B:

This action addresses the reported ONTAP condition: An iSCSI host uses a larger MTU than the storage network can forward. It specifically applies network mtu and frame handling and mitigates: A partially configured jumbo-frame path can drop large packets even while small pings succeed. A practical completion check is: A correctly sized test packet and representative storage workload pass without fragmentation-related loss.

Incorrect Answers

A:

Trace actual configured LIF failover targets, broadcast domains and path availability when a node maintenance event causes connectivity loss. The network mtu and frame handling prerequisite remains unaddressed.

C:

Inspect LIF operational state, current home port, port link state and VLAN tagging before changing storage protocols. That change would not implement network mtu and frame handling.

D:

Inspect ONTAP port statistics and fabric counters for drops, errors or saturation before resizing storage systems. The configuration must instead establish network mtu and frame handling.

Question 382

After corrective work for the ONTAP issue 'An iSCSI host uses a larger MTU than the storage network can forward', the operator seeks objective signoff. Which verification is most relevant to the storage problem described?

  1. Port error counters and effective throughput improve after the offending link or congestion condition is addressed.
  2. A correctly sized test packet and representative storage workload pass without fragmentation-related loss.
  3. Link and VLAN counters normalize and a test client reaches the correct LIF over the intended port.
  4. The LIF has usable failover targets and an end-to-end client test succeeds during controlled port failure.

Explanation

Correct Answer

B:

This is observable acceptance evidence for: An iSCSI host uses a larger MTU than the storage network can forward. It demonstrates the intended ONTAP storage behavior in the relevant situation, rather than merely showing that a configuration field exists.

Incorrect Answers

A:

Port error counters and effective throughput improve after the offending link or congestion condition is addressed. The relevant success criterion is network mtu and frame handling; this measures a different function.

C:

Link and VLAN counters normalize and a test client reaches the correct LIF over the intended port. Acceptance here depends on observing network mtu and frame handling, not only that test.

D:

The LIF has usable failover targets and an end-to-end client test succeeds during controlled port failure. It does not establish the requested network mtu and frame handling outcome.

Question 383

During a storage operations review for a university research storage team, the team observes: An operator treats a successful 64-byte ping as proof of 9000-byte path support. The decision must maintain shared-client safety and reproducible workloads. Which change best corrects the storage design under these conditions?

  1. Inspect ONTAP port statistics and fabric counters for drops, errors or saturation before resizing storage systems.
  2. Verify end-to-end MTU support across ONTAP ports, host NICs and intervening switches when using jumbo frames.
  3. Trace actual configured LIF failover targets, broadcast domains and path availability when a node maintenance event causes connectivity loss.
  4. Inspect LIF operational state, current home port, port link state and VLAN tagging before changing storage protocols.

Explanation

Correct Answer

B:

This action addresses the reported ONTAP condition: An operator treats a successful 64-byte ping as proof of 9000-byte path support. It specifically applies network mtu and frame handling and mitigates: A partially configured jumbo-frame path can drop large packets even while small pings succeed. A practical completion check is: A correctly sized test packet and representative storage workload pass without fragmentation-related loss.

Incorrect Answers

A:

Inspect ONTAP port statistics and fabric counters for drops, errors or saturation before resizing storage systems. That change would not implement network mtu and frame handling.

C:

Trace actual configured LIF failover targets, broadcast domains and path availability when a node maintenance event causes connectivity loss. The network mtu and frame handling prerequisite remains unaddressed.

D:

Inspect LIF operational state, current home port, port link state and VLAN tagging before changing storage protocols. It changes a different feature than network mtu and frame handling.

Question 384

After corrective work for the ONTAP issue 'An operator treats a successful 64-byte ping as proof of 9000-byte path support', the operator seeks objective signoff. What evidence would show that the corrective configuration is working?

  1. A correctly sized test packet and representative storage workload pass without fragmentation-related loss.
  2. Port error counters and effective throughput improve after the offending link or congestion condition is addressed.
  3. Link and VLAN counters normalize and a test client reaches the correct LIF over the intended port.
  4. The LIF has usable failover targets and an end-to-end client test succeeds during controlled port failure.

Explanation

Correct Answer

A:

This is observable acceptance evidence for: An operator treats a successful 64-byte ping as proof of 9000-byte path support. It demonstrates the intended ONTAP storage behavior in the relevant situation, rather than merely showing that a configuration field exists.

Incorrect Answers

B:

Port error counters and effective throughput improve after the offending link or congestion condition is addressed. It does not establish the requested network mtu and frame handling outcome.

C:

Link and VLAN counters normalize and a test client reaches the correct LIF over the intended port. The relevant success criterion is network mtu and frame handling; this measures a different function.

D:

The LIF has usable failover targets and an end-to-end client test succeeds during controlled port failure. That result could pass without demonstrating network mtu and frame handling.

Question 385

During a storage operations review for a regulated healthcare records provider, the team observes: Application latency grows while switch egress drops increase. The decision must maintain patient data and application recovery obligations. Which ONTAP administration change best addresses the observed failure?

  1. Inspect LIF operational state, current home port, port link state and VLAN tagging before changing storage protocols.
  2. Verify end-to-end MTU support across ONTAP ports, host NICs and intervening switches when using jumbo frames.
  3. Trace actual configured LIF failover targets, broadcast domains and path availability when a node maintenance event causes connectivity loss.
  4. Inspect ONTAP port statistics and fabric counters for drops, errors or saturation before resizing storage systems.

Explanation

Correct Answer

D:

This action addresses the reported ONTAP condition: Application latency grows while switch egress drops increase. It specifically applies network port errors and congestion diagnosis and mitigates: An overloaded or faulty Ethernet path can look like slow disks when no end-to-end telemetry is gathered. A practical completion check is: Port error counters and effective throughput improve after the offending link or congestion condition is addressed.

Incorrect Answers

A:

Inspect LIF operational state, current home port, port link state and VLAN tagging before changing storage protocols. The network port errors and congestion diagnosis prerequisite remains unaddressed.

B:

Verify end-to-end MTU support across ONTAP ports, host NICs and intervening switches when using jumbo frames. It changes a different feature than network port errors and congestion diagnosis.

C:

Trace actual configured LIF failover targets, broadcast domains and path availability when a node maintenance event causes connectivity loss. That change would not implement network port errors and congestion diagnosis.

Question 386

After corrective work for the ONTAP issue 'Application latency grows while switch egress drops increase', the operator seeks objective signoff. Which acceptance result demonstrates that this ONTAP issue has been corrected?

  1. A correctly sized test packet and representative storage workload pass without fragmentation-related loss.
  2. Link and VLAN counters normalize and a test client reaches the correct LIF over the intended port.
  3. Port error counters and effective throughput improve after the offending link or congestion condition is addressed.
  4. The LIF has usable failover targets and an end-to-end client test succeeds during controlled port failure.

Explanation

Correct Answer

C:

This is observable acceptance evidence for: Application latency grows while switch egress drops increase. It demonstrates the intended ONTAP storage behavior in the relevant situation, rather than merely showing that a configuration field exists.

Incorrect Answers

A:

A correctly sized test packet and representative storage workload pass without fragmentation-related loss. The relevant success criterion is network port errors and congestion diagnosis; this measures a different function.

B:

Link and VLAN counters normalize and a test client reaches the correct LIF over the intended port. That result could pass without demonstrating network port errors and congestion diagnosis.

D:

The LIF has usable failover targets and an end-to-end client test succeeds during controlled port failure. It does not establish the requested network port errors and congestion diagnosis outcome.

Question 387

During a storage operations review for a university research storage team, the team observes: A new storage controller is proposed to fix one CRC-erroring cable. The decision must maintain shared-client safety and reproducible workloads. What should the storage administrator do first for the stated requirement?

  1. Verify end-to-end MTU support across ONTAP ports, host NICs and intervening switches when using jumbo frames.
  2. Inspect ONTAP port statistics and fabric counters for drops, errors or saturation before resizing storage systems.
  3. Trace actual configured LIF failover targets, broadcast domains and path availability when a node maintenance event causes connectivity loss.
  4. Inspect LIF operational state, current home port, port link state and VLAN tagging before changing storage protocols.

Explanation

Correct Answer

B:

This action addresses the reported ONTAP condition: A new storage controller is proposed to fix one CRC-erroring cable. It specifically applies network port errors and congestion diagnosis and mitigates: An overloaded or faulty Ethernet path can look like slow disks when no end-to-end telemetry is gathered. A practical completion check is: Port error counters and effective throughput improve after the offending link or congestion condition is addressed.

Incorrect Answers

A:

Verify end-to-end MTU support across ONTAP ports, host NICs and intervening switches when using jumbo frames. That change would not implement network port errors and congestion diagnosis.

C:

Trace actual configured LIF failover targets, broadcast domains and path availability when a node maintenance event causes connectivity loss. The network port errors and congestion diagnosis prerequisite remains unaddressed.

D:

Inspect LIF operational state, current home port, port link state and VLAN tagging before changing storage protocols. It changes a different feature than network port errors and congestion diagnosis.

Question 388

A NetApp ONTAP change review identifies: A new storage controller is proposed to fix one CRC-erroring cable. What failure mode explains the need for corrective action?

  1. An overloaded or faulty Ethernet path can look like slow disks when no end-to-end telemetry is gathered.
  2. Misdiagnosing a layer-two fault as an NFS or SMB permission issue delays service restoration.
  3. Repeatedly moving the LIF without correcting its failover constraints can reproduce the outage on the next event.
  4. A partially configured jumbo-frame path can drop large packets even while small pings succeed.

Explanation

Correct Answer

A:

This is the directly implicated exposure when a new storage controller is proposed to fix one CRC-erroring cable. The relevant corrective control is: Inspect ONTAP port statistics and fabric counters for drops, errors or saturation before resizing storage systems. A meaningful acceptance test is: Port error counters and effective throughput improve after the offending link or congestion condition is addressed.

Incorrect Answers

B:

Misdiagnosing a layer-two fault as an NFS or SMB permission issue delays service restoration. The network port errors and congestion diagnosis prerequisite remains unaddressed.

C:

Repeatedly moving the LIF without correcting its failover constraints can reproduce the outage on the next event. It changes a different feature than network port errors and congestion diagnosis.

D:

A partially configured jumbo-frame path can drop large packets even while small pings succeed. That change would not implement network port errors and congestion diagnosis.

Question 389

During a storage operations review for a regional managed storage service provider, the team observes: One of two uplinks saturates while the other stays idle. The decision must maintain tenant boundaries and documented service commitments. Which engineering choice most directly solves this problem?

  1. Inspect ONTAP port statistics and fabric counters for drops, errors or saturation before resizing storage systems.
  2. Inspect LIF operational state, current home port, port link state and VLAN tagging before changing storage protocols.
  3. Verify end-to-end MTU support across ONTAP ports, host NICs and intervening switches when using jumbo frames.
  4. Trace actual configured LIF failover targets, broadcast domains and path availability when a node maintenance event causes connectivity loss.

Explanation

Correct Answer

A:

This action addresses the reported ONTAP condition: One of two uplinks saturates while the other stays idle. It specifically applies network port errors and congestion diagnosis and mitigates: An overloaded or faulty Ethernet path can look like slow disks when no end-to-end telemetry is gathered. A practical completion check is: Port error counters and effective throughput improve after the offending link or congestion condition is addressed.

Incorrect Answers

B:

Inspect LIF operational state, current home port, port link state and VLAN tagging before changing storage protocols. It changes a different feature than network port errors and congestion diagnosis.

C:

Verify end-to-end MTU support across ONTAP ports, host NICs and intervening switches when using jumbo frames. That change would not implement network port errors and congestion diagnosis.

D:

Trace actual configured LIF failover targets, broadcast domains and path availability when a node maintenance event causes connectivity loss. The configuration must instead establish network port errors and congestion diagnosis.

Question 390

A NetApp ONTAP administrator must resolve this situation: One of two uplinks saturates while the other stays idle. Select TWO: the targeted corrective action and its strongest verification. (Select TWO.)

  1. Inspect ONTAP port statistics and fabric counters for drops, errors or saturation before resizing storage systems.
  2. Port error counters and effective throughput improve after the offending link or congestion condition is addressed.
  3. The LIF has usable failover targets and an end-to-end client test succeeds during controlled port failure.
  4. Verify end-to-end MTU support across ONTAP ports, host NICs and intervening switches when using jumbo frames.
  5. Inspect LIF operational state, current home port, port link state and VLAN tagging before changing storage protocols.

Explanation

Correct Answers

A:

This is the proposed corrective action for: One of two uplinks saturates while the other stays idle. The action addresses the ONTAP failure mechanism: An overloaded or faulty Ethernet path can look like slow disks when no end-to-end telemetry is gathered.

B:

This provides separate verification for the same issue: One of two uplinks saturates while the other stays idle. The outcome tests whether remediation is effective and can be recorded as acceptance evidence.

Incorrect Answers

C:

The LIF has usable failover targets and an end-to-end client test succeeds during controlled port failure. The paired controls concern network port errors and congestion diagnosis, not that measure.

D:

Verify end-to-end MTU support across ONTAP ports, host NICs and intervening switches when using jumbo frames. The network port errors and congestion diagnosis implementation and safeguard are still missing.

E:

Inspect LIF operational state, current home port, port link state and VLAN tagging before changing storage protocols. The two-part network port errors and congestion diagnosis control remains unsatisfied.

NetApp Certified Data Administrator, ONTAP (NS0-165) Practice Tests