Question 380
A NetApp ONTAP administrator must resolve this situation: A switch trunk remains at standard MTU despite jumbo frames on both endpoints. Which TWO choices form a defensible remediation-and-acceptance pair? (Select TWO.)
Explanation
Correct Answers
This is the proposed corrective action for: A switch trunk remains at standard MTU despite jumbo frames on both endpoints. The action addresses the ONTAP failure mechanism: A partially configured jumbo-frame path can drop large packets even while small pings succeed.
This provides separate verification for the same issue: A switch trunk remains at standard MTU despite jumbo frames on both endpoints. The outcome tests whether remediation is effective and can be recorded as acceptance evidence.
Incorrect Answers
The LIF has usable failover targets and an end-to-end client test succeeds during controlled port failure. The paired controls concern network mtu and frame handling, not that measure.
Inspect ONTAP port statistics and fabric counters for drops, errors or saturation before resizing storage systems. The network mtu and frame handling implementation and safeguard are still missing.
Inspect LIF operational state, current home port, port link state and VLAN tagging before changing storage protocols. This does not supply the required network mtu and frame handling action-and-control pair.