Question 390
A NetApp ONTAP administrator must resolve this situation: One of two uplinks saturates while the other stays idle. Select TWO: the targeted corrective action and its strongest verification. (Select TWO.)
Explanation
Correct Answers
This is the proposed corrective action for: One of two uplinks saturates while the other stays idle. The action addresses the ONTAP failure mechanism: An overloaded or faulty Ethernet path can look like slow disks when no end-to-end telemetry is gathered.
This provides separate verification for the same issue: One of two uplinks saturates while the other stays idle. The outcome tests whether remediation is effective and can be recorded as acceptance evidence.
Incorrect Answers
The LIF has usable failover targets and an end-to-end client test succeeds during controlled port failure. The paired controls concern network port errors and congestion diagnosis, not that measure.
Verify end-to-end MTU support across ONTAP ports, host NICs and intervening switches when using jumbo frames. The network port errors and congestion diagnosis implementation and safeguard are still missing.
Inspect LIF operational state, current home port, port link state and VLAN tagging before changing storage protocols. The two-part network port errors and congestion diagnosis control remains unsatisfied.