mcAfee Secure Website
exam =5
exam =6

Exam Code: 800-150

Exam Name: Supporting Cisco Devices for Field Technicians

Certification Provider: Cisco

Cisco 800-150 Questions & Answers

Reliable & Actual Study Materials for 800-150 Exam Success

100 Questions & Answers with Testing Engine

"800-150: Supporting Cisco Devices for Field Technicians" Testing Engine covers all the knowledge points of the real Cisco 800-150 exam.

The latest actual 800-150 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at 800-150 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cisco Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cisco 800-150 Practice Test 54

Question 530

Primary data-center night shift. Field report: A replacement edge platform comes online but a subscribed WAN feature is inactive. Which action is the most defensible first step?

  1. Change an unrelated DNS TTL to recover subscription state.
  2. Assume copied router configuration also transfers all licensing records automatically.
  3. Swap the UPS battery to authorize the feature.
  4. Review feature entitlement and platform registration after configuration restoration.

Explanation

Correct Answer

D:

Replacement hardware may require separate licensing and identity checks. The action should lead to evidence that the required feature is entitled and works on the replacement.

Incorrect Answers

A:

Attempting this shortcut is not an adequate substitute for the required action. Replacement hardware may require separate licensing and identity checks. Post-change evidence is still needed.

B:

This alternative would not solve the reported problem. Replacement hardware may require separate licensing and identity checks. The field team must instead establish whether the required feature is entitled and works on the replacement.

C:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a replacement edge platform comes online but a subscribed wan feature is inactive. The relevant control is review feature entitlement and platform registration after configuration restoration.

Question 531

Headquarters wiring-closet visit. Field report: A platform intermittently resets a supervisor and the field needs timestamps. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Perform or retain the approved action: review `show logging` and relevant system event messages; document evidence that relevant errors and timestamps are preserved for the support case.
  2. Apply “Clear log history before capturing the fault evidence” as a substitute and declare success from shipment receipt alone.
  3. Defer service verification after “Assume any green link LED rules out chassis alarms” until the next reported incident.
  4. Close after recording “Use a DNS zone transfer as the sole supervisor event log” without checking that relevant errors and timestamps are preserved for the support case.

Explanation

Correct Answer

A:

This handoff preserves the required corrective action and the verifiable service outcome. System logs provide timestamped diagnostic messages for platform events. Recording that relevant errors and timestamps are preserved for the support case makes the signoff testable.

Incorrect Answers

B:

Delivery paperwork describes logistics, not recovered functionality. “Clear log history before capturing the fault evidence” leaves the technical requirement and its validation unresolved.

C:

A future incident is not a reasonable acceptance gate for a known problem. “Assume any green link LED rules out chassis alarms” is not evidence that relevant errors and timestamps are preserved for the support case.

D:

This proposes a different action with no acceptance evidence. “Use a DNS zone transfer as the sole supervisor event log” cannot replace the validated measure that relevant errors and timestamps are preserved for the support case.

Question 532

Colocation site RMA handoff. Field report: A rack-mounted C-Series server must be remotely diagnosed before a drive replacement. Which action is the most defensible first step?

  1. Reset all drives before checking redundancy or data-protection status.
  2. Inspect CIMC or supported management inventory, drive health and service logs.
  3. Treat switch MAC learning as proof that all disks are healthy.
  4. Use a voice call-controller GUI as the server disk management console.

Explanation

Correct Answer

B:

C-Series server hardware exposes diagnostic and inventory information through its management controller. The action should lead to evidence that failed component identity and post-replacement storage health.

Incorrect Answers

A:

Attempting this shortcut is not an adequate substitute for the required action. C-Series server hardware exposes diagnostic and inventory information through its management controller. Post-change evidence is still needed.

C:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a rack-mounted c-series server must be remotely diagnosed before a drive replacement. The relevant control is inspect cimc or supported management inventory, drive health and service logs.

D:

This alternative would not solve the reported problem. C-Series server hardware exposes diagnostic and inventory information through its management controller. The field team must instead establish whether failed component identity and post-replacement storage health.

Question 533

Remote office replacement window. Field report: A replaced high-speed 8000 router card becomes operational but critical routes are missing. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Defer service verification after “Restart unrelated collaboration endpoints as routing acceptance” until the next reported incident.
  2. Close after recording “Declare recovery complete solely because optics show light” without checking that intended routes and test flows work through the new card.
  3. Perform or retain the approved action: inspect interface, forwarding, protocol adjacency and line-card state together; document evidence that intended routes and test flows work through the new card.
  4. Apply “Use storage-controller zoning to repair missing IPv4 routes” as a substitute and declare success from shipment receipt alone.

Explanation

Correct Answer

C:

This handoff preserves the required corrective action and the verifiable service outcome. Hardware readiness must be paired with control-plane and forwarding validation. Recording that intended routes and test flows work through the new card makes the signoff testable.

Incorrect Answers

A:

A future incident is not a reasonable acceptance gate for a known problem. “Restart unrelated collaboration endpoints as routing acceptance” is not evidence that intended routes and test flows work through the new card.

B:

This proposes a different action with no acceptance evidence. “Declare recovery complete solely because optics show light” cannot replace the validated measure that intended routes and test flows work through the new card.

D:

Delivery paperwork describes logistics, not recovered functionality. “Use storage-controller zoning to repair missing IPv4 routes” leaves the technical requirement and its validation unresolved.

Question 534

Disaster-recovery facility inspection. Field report: A long inter-building fiber path needs a compatible single-mode optical transceiver. Which action is the most defensible first step?

  1. Use a copper SFP without copper conductors.
  2. Assume all SFPs work on any fiber irrespective of optical budget.
  3. Install multimode-only optics against an unsupported single-mode path.
  4. Select optics and fiber type with matched wavelength, reach and connector specifications.

Explanation

Correct Answer

D:

Optical systems require compatible fiber mode, wavelength, power budget and interface support. The action should lead to evidence that transceiver compatibility and receive light level meets platform limits.

Incorrect Answers

A:

Attempting this shortcut is not an adequate substitute for the required action. Optical systems require compatible fiber mode, wavelength, power budget and interface support. Post-change evidence is still needed.

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a long inter-building fiber path needs a compatible single-mode optical transceiver. The relevant control is select optics and fiber type with matched wavelength, reach and connector specifications.

C:

This alternative would not solve the reported problem. Optical systems require compatible fiber mode, wavelength, power budget and interface support. The field team must instead establish whether transceiver compatibility and receive light level meets platform limits.

Question 535

Main campus hardware-service ticket. Field report: An on-premise IP phone receives DHCP but stays unregistered. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Perform or retain the approved action: check phone reachability to its assigned cisco ucm/call-control service; document evidence that the phone shows registered in its intended call-control group.
  2. Apply “Change campus spanning-tree root before checking call-control connectivity” as a substitute and declare success from shipment receipt alone.
  3. Close after recording “Replace the handset solely because it received an address” without checking that the phone shows registered in its intended call-control group.
  4. Defer service verification after “Disable DNS globally without examining registration signaling” until the next reported incident.

Explanation

Correct Answer

A:

This handoff preserves the required corrective action and the verifiable service outcome. Phone address assignment does not prove call-control registration or provisioning. Recording that the phone shows registered in its intended call-control group makes the signoff testable.

Incorrect Answers

B:

Delivery paperwork describes logistics, not recovered functionality. “Change campus spanning-tree root before checking call-control connectivity” leaves the technical requirement and its validation unresolved.

C:

This proposes a different action with no acceptance evidence. “Replace the handset solely because it received an address” cannot replace the validated measure that the phone shows registered in its intended call-control group.

D:

A future incident is not a reasonable acceptance gate for a known problem. “Disable DNS globally without examining registration signaling” is not evidence that the phone shows registered in its intended call-control group.

Question 536

Regional north-campus service window. Field report: An ISR branch uses a cellular module for backup when the wired WAN fails. A colleague proposes: “Assume cellular failover works because a Wi-Fi network is visible.” Which technical assessment is best supported?

  1. The original problem can be treated as resolved from inventory labels alone, without checking isr cellular failover behavior.
  2. The proposal overlooks the reported dependency: Backup cellular service needs supported hardware and an active provisioned carrier path.
  3. The proposed shortcut is sufficient because install a usb flash drive to substitute for a cellular modem.
  4. There is no need to validate the reported dependency once copy another site's cellular account settings without authorization.

Explanation

Correct Answer

B:

The alternative does not address the actual reported dependency. Backup cellular service needs supported hardware and an active provisioned carrier path. The supported intervention is validate module compatibility, sim/service and intended failover state; acceptance should show that controlled failover exercises the intended cellular uplink.

Incorrect Answers

A:

The failure described in the field report requires a functional check that controlled failover exercises the intended cellular uplink.

C:

The proposed step “Install a USB flash drive to substitute for a cellular modem” is not the required mechanism.

D:

It assumes an unrelated action establishes service recovery. Nothing about “Copy another site's cellular account settings without authorization” demonstrates whether controlled failover exercises the intended cellular uplink.

Question 537

Customer branch-site maintenance. Field report: An old Meraki switch is returned and its replacement must inherit the intended deployment. A colleague proposes: “Reuse the failed device serial as a fake label for the new unit.” Which technical assessment is best supported?

  1. The original problem can be treated as resolved from inventory labels alone, without checking meraki serial replacement behavior.
  2. The proposed shortcut is sufficient because leave the failed and replacement devices indistinguishable in inventory.
  3. The proposal overlooks the reported dependency: Meraki inventory and RMA reconciliation are keyed to device serials.
  4. There is no need to validate the reported dependency once treat a switch port description as the dashboard hardware identity.

Explanation

Correct Answer

C:

The alternative does not address the actual reported dependency. Meraki inventory and RMA reconciliation are keyed to device serials. The supported intervention is record and reconcile both serials using the documented rma/inventory workflow; acceptance should show that the old and new serial associations and correct dashboard network state.

Incorrect Answers

A:

The failure described in the field report requires a functional check that the old and new serial associations and correct dashboard network state.

B:

The proposed step “Leave the failed and replacement devices indistinguishable in inventory” is not the required mechanism.

D:

It assumes an unrelated action establishes service recovery. Nothing about “Treat a switch port description as the dashboard hardware identity” demonstrates whether the old and new serial associations and correct dashboard network state.

Question 538

Primary data-center night shift. Field report: A backup and the current router state disagree on routing statements. Which action is the most defensible first step?

  1. Overwrite live routing with the oldest available file without review.
  2. Change only the device description label and assume routing aligns.
  3. Treat traceroute output as a substitute for configuration diff.
  4. Compare the live running config to the trusted backup before reconciliation.

Explanation

Correct Answer

D:

A controlled diff isolates intentional from accidental changes. The action should lead to evidence that only approved deltas exist between intended and active configuration.

Incorrect Answers

A:

This alternative would not solve the reported problem. A controlled diff isolates intentional from accidental changes. The field team must instead establish whether only approved deltas exist between intended and active configuration.

B:

Attempting this shortcut is not an adequate substitute for the required action. A controlled diff isolates intentional from accidental changes. Post-change evidence is still needed.

C:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a backup and the current router state disagree on routing statements. The relevant control is compare the live running config to the trusted backup before reconciliation.

Question 539

Headquarters wiring-closet visit. Field report: A replacement secure firewall boots but an application path stays blocked. Which action is the most defensible first step?

  1. Review policy and interface-zone restoration with approved management deployment.
  2. Turn off intrusion detection globally to restore one application.
  3. Use only a physical link LED as evidence of firewall policy recovery.
  4. Assume copying a switch VLAN list reproduces firewall access rules.

Explanation

Correct Answer

A:

Firewall services require policy, zones and deployment state beyond interface carrier. The action should lead to evidence that intended allowed and denied test flows match security policy.

Incorrect Answers

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a replacement secure firewall boots but an application path stays blocked. The relevant control is review policy and interface-zone restoration with approved management deployment.

C:

Attempting this shortcut is not an adequate substitute for the required action. Firewall services require policy, zones and deployment state beyond interface carrier. Post-change evidence is still needed.

D:

This alternative would not solve the reported problem. Firewall services require policy, zones and deployment state beyond interface carrier. The field team must instead establish whether intended allowed and denied test flows match security policy.

Question 540

Colocation site RMA handoff. Field report: A floor needs to connect many copper Ethernet endpoints within one local LAN. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Close after recording “Deploy a router with one WAN port as the user-port fanout” without checking that endpoints link to the planned access VLAN and reach their gateway.
  2. Perform or retain the approved action: install an access switch with adequate ports and uplink capacity; document evidence that endpoints link to the planned access VLAN and reach their gateway.
  3. Defer service verification after “Install a wireless controller without access switches” until the next reported incident.
  4. Apply “Use a firewall interface for every user workstation” as a substitute and declare success from shipment receipt alone.

Explanation

Correct Answer

B:

This handoff preserves the required corrective action and the verifiable service outcome. An access switch supplies many Layer 2 edge ports and learns local MAC destinations. Recording that endpoints link to the planned access VLAN and reach their gateway makes the signoff testable.

Incorrect Answers

A:

This proposes a different action with no acceptance evidence. “Deploy a router with one WAN port as the user-port fanout” cannot replace the validated measure that endpoints link to the planned access VLAN and reach their gateway.

C:

A future incident is not a reasonable acceptance gate for a known problem. “Install a wireless controller without access switches” is not evidence that endpoints link to the planned access VLAN and reach their gateway.

D:

Delivery paperwork describes logistics, not recovered functionality. “Use a firewall interface for every user workstation” leaves the technical requirement and its validation unresolved.

Supporting Cisco Devices for Field Technicians (800-150) Practice Tests