mcAfee Secure Website
exam =5
exam =6

Exam Code: 800-150

Exam Name: Supporting Cisco Devices for Field Technicians

Certification Provider: Cisco

Cisco 800-150 Questions & Answers

Reliable & Actual Study Materials for 800-150 Exam Success

100 Questions & Answers with Testing Engine

"800-150: Supporting Cisco Devices for Field Technicians" Testing Engine covers all the knowledge points of the real Cisco 800-150 exam.

The latest actual 800-150 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at 800-150 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cisco Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cisco 800-150 Practice Test 52

Question 510

Disaster-recovery facility inspection. Field report: A small campus has switches, routers and endpoint phones in the same cabinet. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Apply “Treat an access switch as a telephone handset” as a substitute and declare success from shipment receipt alone.
  2. Close after recording “Classify IP phones as the campus default route processors” without checking that the physical and logical inventory distinguishes network and endpoint devices.
  3. Defer service verification after “Assume all Ethernet-connected devices share one operational role” until the next reported incident.
  4. Perform or retain the approved action: identify switching and routing infrastructure separately from collaboration endpoints; document evidence that the physical and logical inventory distinguishes network and endpoint devices.

Explanation

Correct Answer

D:

This handoff preserves the required corrective action and the verifiable service outcome. Infrastructure provides network transport while endpoints consume collaboration services. Recording that the physical and logical inventory distinguishes network and endpoint devices makes the signoff testable.

Incorrect Answers

A:

Delivery paperwork describes logistics, not recovered functionality. “Treat an access switch as a telephone handset” leaves the technical requirement and its validation unresolved.

B:

This proposes a different action with no acceptance evidence. “Classify IP phones as the campus default route processors” cannot replace the validated measure that the physical and logical inventory distinguishes network and endpoint devices.

C:

A future incident is not a reasonable acceptance gate for a known problem. “Assume all Ethernet-connected devices share one operational role” is not evidence that the physical and logical inventory distinguishes network and endpoint devices.

Question 511

Main campus hardware-service ticket. Field report: A field-supplied Catalyst edge spare boots a different IOS XE release than the original. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Perform or retain the approved action: validate the supported target image and upgrade/rollback plan before restoring features; document evidence that the spare runs an approved image and intended services come online.
  2. Defer service verification after “Delete recovery storage before confirming the spare's boot health” until the next reported incident.
  3. Close after recording “Paste all config settings without checking image compatibility” without checking that the spare runs an approved image and intended services come online.
  4. Apply “Force a random image from another platform to match version text” as a substitute and declare success from shipment receipt alone.

Explanation

Correct Answer

A:

This handoff preserves the required corrective action and the verifiable service outcome. Hardware/software compatibility determines which saved features and images can be restored. Recording that the spare runs an approved image and intended services come online makes the signoff testable.

Incorrect Answers

B:

A future incident is not a reasonable acceptance gate for a known problem. “Delete recovery storage before confirming the spare's boot health” is not evidence that the spare runs an approved image and intended services come online.

C:

This proposes a different action with no acceptance evidence. “Paste all config settings without checking image compatibility” cannot replace the validated measure that the spare runs an approved image and intended services come online.

D:

Delivery paperwork describes logistics, not recovered functionality. “Force a random image from another platform to match version text” leaves the technical requirement and its validation unresolved.

Question 512

Regional north-campus service window. Field report: A Nexus running configuration has been corrected and must survive a reload. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Apply “Use a console cable as the only configuration backup” as a substitute and declare success from shipment receipt alone.
  2. Perform or retain the approved action: save and verify the approved nx-os configuration with platform-supported command; document evidence that saved configuration matches intended running settings.
  3. Close after recording “Assume any CLI edit instantly persists to nonvolatile storage” without checking that saved configuration matches intended running settings.
  4. Defer service verification after “Rename the switch interface while leaving startup settings unchanged” until the next reported incident.

Explanation

Correct Answer

B:

This handoff preserves the required corrective action and the verifiable service outcome. Operational configuration edits require an explicit persistence or checkpoint workflow. Recording that saved configuration matches intended running settings makes the signoff testable.

Incorrect Answers

A:

Delivery paperwork describes logistics, not recovered functionality. “Use a console cable as the only configuration backup” leaves the technical requirement and its validation unresolved.

C:

This proposes a different action with no acceptance evidence. “Assume any CLI edit instantly persists to nonvolatile storage” cannot replace the validated measure that saved configuration matches intended running settings.

D:

A future incident is not a reasonable acceptance gate for a known problem. “Rename the switch interface while leaving startup settings unchanged” is not evidence that saved configuration matches intended running settings.

Question 513

Customer branch-site maintenance. Field report: A provider-edge NCS has a redundant chassis component scheduled for replacement. Which action is the most defensible first step?

  1. Use a simple ICMP echo as proof all redundancy remains intact.
  2. Skip dependency checks because routing is distributed.
  3. Verify remaining capacity, fabric path and redundancy state under the service plan.
  4. Remove both redundant components while routing traffic.

Explanation

Correct Answer

C:

A replacement can expose a redundancy fault if the remaining system is not healthy. The action should lead to evidence that fault-tolerant roles and path state survive the maintenance.

Incorrect Answers

A:

Attempting this shortcut is not an adequate substitute for the required action. A replacement can expose a redundancy fault if the remaining system is not healthy. Post-change evidence is still needed.

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a provider-edge ncs has a redundant chassis component scheduled for replacement. The relevant control is verify remaining capacity, fabric path and redundancy state under the service plan.

D:

This alternative would not solve the reported problem. A replacement can expose a redundancy fault if the remaining system is not healthy. The field team must instead establish whether fault-tolerant roles and path state survive the maintenance.

Question 514

Primary data-center night shift. Field report: A replacement Catalyst switch forwards locally but its distribution uplink stays down. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Apply “Disable STP everywhere to force the failed uplink into forwarding” as a substitute and declare success from shipment receipt alone.
  2. Close after recording “Assume local host-to-host ping proves the distribution trunk is restored” without checking that the upstream logical connection and required VLANs/routes are healthy.
  3. Defer service verification after “Use the RMA tracking number as an interface configuration backup” until the next reported incident.
  4. Perform or retain the approved action: validate uplink optics, physical port, trunk and port-channel settings against baseline; document evidence that the upstream logical connection and required VLANs/routes are healthy.

Explanation

Correct Answer

D:

This handoff preserves the required corrective action and the verifiable service outcome. Local switch forwarding does not establish restored uplink services. Recording that the upstream logical connection and required VLANs/routes are healthy makes the signoff testable.

Incorrect Answers

A:

Delivery paperwork describes logistics, not recovered functionality. “Disable STP everywhere to force the failed uplink into forwarding” leaves the technical requirement and its validation unresolved.

B:

This proposes a different action with no acceptance evidence. “Assume local host-to-host ping proves the distribution trunk is restored” cannot replace the validated measure that the upstream logical connection and required VLANs/routes are healthy.

C:

A future incident is not a reasonable acceptance gate for a known problem. “Use the RMA tracking number as an interface configuration backup” is not evidence that the upstream logical connection and required VLANs/routes are healthy.

Question 515

Headquarters wiring-closet visit. Field report: A Nexus Fabric Extender connects remote host-facing ports to its controlling parent. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Perform or retain the approved action: verify fex fabric uplinks and parent-switch association; document evidence that the FEX appears online with its expected host interfaces.
  2. Close after recording “Configure the FEX as an unrelated standalone routing peer without parent support” without checking that the FEX appears online with its expected host interfaces.
  3. Apply “Treat every FEX as a UCS blade server” as a substitute and declare success from shipment receipt alone.
  4. Defer service verification after “Change the site DHCP lease solely to make parent association happen” until the next reported incident.

Explanation

Correct Answer

A:

This handoff preserves the required corrective action and the verifiable service outcome. FEX host ports are controlled through a supported parent Nexus relationship. Recording that the FEX appears online with its expected host interfaces makes the signoff testable.

Incorrect Answers

B:

This proposes a different action with no acceptance evidence. “Configure the FEX as an unrelated standalone routing peer without parent support” cannot replace the validated measure that the FEX appears online with its expected host interfaces.

C:

Delivery paperwork describes logistics, not recovered functionality. “Treat every FEX as a UCS blade server” leaves the technical requirement and its validation unresolved.

D:

A future incident is not a reasonable acceptance gate for a known problem. “Change the site DHCP lease solely to make parent association happen” is not evidence that the FEX appears online with its expected host interfaces.

Question 516

Colocation site RMA handoff. Field report: A UCS blade boots but cannot see the assigned SAN boot target. A colleague proposes: “Change a Webex meeting URL to repair SAN boot storage.” Which technical assessment is best supported?

  1. The original problem can be treated as resolved from inventory labels alone, without checking server hba mapping behavior.
  2. The proposal overlooks the reported dependency: SAN boot requires correctly provisioned host bus access and storage fabric connectivity.
  3. There is no need to validate the reported dependency once delete the vm hostname rather than checking vhba paths.
  4. The proposed shortcut is sufficient because assume ethernet ping proves fibre channel initiator login.

Explanation

Correct Answer

B:

The alternative does not address the actual reported dependency. SAN boot requires correctly provisioned host bus access and storage fabric connectivity. The supported intervention is check vhba mapping, fc zoning, vsan and fabric path for the server; acceptance should show that the intended WWPN and LUN are visible through approved FC paths.

Incorrect Answers

A:

The failure described in the field report requires a functional check that the intended WWPN and LUN are visible through approved FC paths.

C:

It assumes an unrelated action establishes service recovery. Nothing about “Delete the VM hostname rather than checking vHBA paths” demonstrates whether the intended WWPN and LUN are visible through approved FC paths.

D:

The proposed step “Assume Ethernet ping proves Fibre Channel initiator login” is not the required mechanism.

Question 517

Remote office replacement window. Field report: A UCS X-Series compute node needs replacement in a modular chassis. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm only that the technician attempted: rewire an ip phone port as the server backplane.
  2. Confirm the site inventory list still contains the hostname, without validating the reported service.
  3. Demonstrate that node inventory, profile and required paths are restored.
  4. Confirm only that the work ticket says “completed,” without testing ucs x-series compute node.

Explanation

Correct Answer

C:

Node inventory, profile and required paths are restored. Modular UCS X-Series hardware depends on platform-specific compute and fabric support.

Incorrect Answers

A:

For example, “Rewire an IP phone port as the server backplane” does not demonstrate the corrected technical state.

B:

Confirm that node inventory, profile and required paths are restored. Modular UCS X-Series hardware depends on platform-specific compute and fabric support.

D:

Check whether node inventory, profile and required paths are restored. Modular UCS X-Series hardware depends on platform-specific compute and fabric support.

Question 518

Disaster-recovery facility inspection. Field report: A support case needs the exact installed chassis identifier. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Defer service verification after “Record only the hostname even where duplicate names exist” until the next reported incident.
  2. Apply “Read the patch-panel port number as the chassis serial” as a substitute and declare success from shipment receipt alone.
  3. Close after recording “Use the DHCP lease's IP address as the Cisco hardware serial” without checking that PID and chassis serial match ticket and vendor entitlement.
  4. Perform or retain the approved action: compare device chassis serial output with its physical serial label; document evidence that PID and chassis serial match ticket and vendor entitlement.

Explanation

Correct Answer

D:

This handoff preserves the required corrective action and the verifiable service outcome. A device serial is a hardware identifier rather than a network label. Recording that PID and chassis serial match ticket and vendor entitlement makes the signoff testable.

Incorrect Answers

A:

A future incident is not a reasonable acceptance gate for a known problem. “Record only the hostname even where duplicate names exist” is not evidence that PID and chassis serial match ticket and vendor entitlement.

B:

Delivery paperwork describes logistics, not recovered functionality. “Read the patch-panel port number as the chassis serial” leaves the technical requirement and its validation unresolved.

C:

This proposes a different action with no acceptance evidence. “Use the DHCP lease's IP address as the Cisco hardware serial” cannot replace the validated measure that PID and chassis serial match ticket and vendor entitlement.

Question 519

Main campus hardware-service ticket. Field report: A branch's packet succeeds one routed hop then disappears. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Perform or retain the approved action: check next-hop forwarding and route/acl decisions at the failure boundary; document evidence that each relevant router's route and interface state toward the destination.
  2. Apply “Replace the office Wi-Fi SSID despite a wired path failure” as a substitute and declare success from shipment receipt alone.
  3. Defer service verification after “Look only at a remote printer's paper supply” until the next reported incident.
  4. Close after recording “Treat a successful DNS lookup as proof of end-to-end routing” without checking that each relevant router's route and interface state toward the destination.

Explanation

Correct Answer

A:

This handoff preserves the required corrective action and the verifiable service outcome. Routing and filtering must be checked where forwarding diverges or packets stop. Recording that each relevant router's route and interface state toward the destination makes the signoff testable.

Incorrect Answers

B:

Delivery paperwork describes logistics, not recovered functionality. “Replace the office Wi-Fi SSID despite a wired path failure” leaves the technical requirement and its validation unresolved.

C:

A future incident is not a reasonable acceptance gate for a known problem. “Look only at a remote printer's paper supply” is not evidence that each relevant router's route and interface state toward the destination.

D:

This proposes a different action with no acceptance evidence. “Treat a successful DNS lookup as proof of end-to-end routing” cannot replace the validated measure that each relevant router's route and interface state toward the destination.

Question 520

Regional north-campus service window. Field report: An installed optic is recognized but an uplink cannot negotiate the planned speed. Which action is the most defensible first step?

  1. Force an arbitrary faster speed unsupported by the optic.
  2. Verify transceiver and interface speed compatibility with the hardware matrix.
  3. Modify endpoint VLAN names to improve optical negotiation.
  4. Change the device login banner as an interface compatibility fix.

Explanation

Correct Answer

B:

Ports and transceivers have supported speeds and media requirements. The action should lead to evidence that the two ends use supported modes and the expected link rate.

Incorrect Answers

A:

This alternative would not solve the reported problem. Ports and transceivers have supported speeds and media requirements. The field team must instead establish whether the two ends use supported modes and the expected link rate.

C:

That change addresses a different aspect of the environment and leaves this requirement unresolved: an installed optic is recognized but an uplink cannot negotiate the planned speed. The relevant control is verify transceiver and interface speed compatibility with the hardware matrix.

D:

Attempting this shortcut is not an adequate substitute for the required action. Ports and transceivers have supported speeds and media requirements. Post-change evidence is still needed.

Supporting Cisco Devices for Field Technicians (800-150) Practice Tests