Question 490
An implementation team completed the following authorized step: Configure positive days to limit how far current inventory is applied to future demand. It originally faced this condition: A seasonal product has stock on hand but a distant-future order should not claim that inventory indefinitely. Which result validates the business process rather than just the presence of a saved setting?
Explanation
Correct Answer
The result to verify is: A future order outside the intended horizon receives a suitable planned supply proposal. This addresses the reported problem: A seasonal product has stock on hand but a distant-future order should not claim that inventory indefinitely. The action was Configure positive days to limit how far current inventory is applied to future demand. This demonstrates operational behavior or a correctly posted transaction rather than merely showing that a configuration value was saved.
Incorrect Answers
Planning respects the approved override at the site and keeps group defaults elsewhere. The check concerns planning respects the approved override at the site and keeps group defaults elsewhere, not confirming that a future order outside the intended horizon receives a suitable planned supply proposal.
Planned dates leave the approved buffers without falsifying supplier lead times. This assesses planned dates leave the approved buffers without falsifying supplier lead times; it does not determine the reported condition—configure positive days to limit how far current inventory is applied to future demand.
The schedule groups demand and supply into the intended reporting periods. The case-specific requirement is confirming that a future order outside the intended horizon receives a suitable planned supply proposal, which that option does not establish.