Question 330
An operations team investigates this FortiSwitch 7.6 situation: A two-tier managed network loses visibility of downstream switches when the distribution ISL is altered. Select TWO complementary measures: the corrective action AND evidence that it worked.
Explanation
Correct Answer
For the observed condition (A two-tier managed network loses visibility of downstream switches when the distribution ISL is altered), the appropriate response is to build a supported FortiLink distribution-and-access topology with suitable ISL, VLAN transport and path resilience. The underlying risk is that daisy-chaining arbitrary switches without checking supported hop topology may break control connectivity or create loops. This action is targeted to two-tier managed switch design rather than to a different switching feature. Confirm it by checking that topology discovery and permitted VLAN path checks prove access switches remain manageable through distribution uplinks.
The relevant acceptance proof for this incident (A two-tier managed network loses visibility of downstream switches when the distribution ISL is altered) is: Topology discovery and permitted VLAN path checks prove access switches remain manageable through distribution uplinks. That observation tests the same failure path that prompted the change, not merely whether a physical link is up. It also helps rule out the known alternative risk: Daisy-chaining arbitrary switches without checking supported hop topology may break control connectivity or create loops. Retain the documented evidence after applying the associated correction: Build a supported FortiLink distribution-and-access topology with suitable ISL, VLAN transport and path resilience.
Incorrect Answers
Interconnecting separate fortilink fabrics addresses another technical failure: an inter-fabric cable that enables automatic switch discovery can cause one controller to attempt management of the other fabric. The case states: A two-tier managed network loses visibility of downstream switches when the distribution ISL is altered. The most direct paired action and test is: build a supported FortiLink distribution-and-access topology with suitable ISL, VLAN transport and path resilience.
Single fortigate managed topology addresses another technical failure: treating any Layer 2 cable as a validated FortiLink management topology can conceal discovery and control-plane problems. The required paired action and test concerns Two-tier managed switch design; a passing result for this alternative could leave that requirement unresolved.
Fortigate ha fortilink resilience would demonstrate or implement: Managed-switch visibility and endpoint forwarding recover through a planned FortiGate HA switchover. The paired-answer requirement concerns Two-tier managed switch design; this alternative does not provide the matching intervention and separate acceptance evidence.