Question 350
An operations team investigates this FortiSwitch 7.6 situation: A service provider migrates switch management from a transparent circuit to routed transport. Select TWO complementary measures: the corrective action AND evidence that it worked.
Explanation
Correct Answer
For the observed condition (A service provider migrates switch management from a transparent circuit to routed transport), the appropriate response is to verify the specific supported Layer 3 FortiLink deployment method and end-to-end management reachability before using routed hops. The underlying risk is that assuming ordinary Layer 2 discovery transparently traverses a routed network can leave remote managed switches undiscovered. This action is targeted to fortilink routed transport requirements rather than to a different switching feature. Confirm it by checking that management traffic and FortiLink status work over the documented L3 path with routing and permitted transport verified.
The relevant acceptance proof for this incident (A service provider migrates switch management from a transparent circuit to routed transport) is: Management traffic and FortiLink status work over the documented L3 path with routing and permitted transport verified. That observation tests the same failure path that prompted the change, not merely whether a physical link is up. It also helps rule out the known alternative risk: Assuming ordinary Layer 2 discovery transparently traverses a routed network can leave remote managed switches undiscovered. Retain the documented evidence after applying the associated correction: Verify the specific supported Layer 3 FortiLink deployment method and end-to-end management reachability before using routed hops.
Incorrect Answers
Interconnecting separate fortilink fabrics addresses another technical failure: an inter-fabric cable that enables automatic switch discovery can cause one controller to attempt management of the other fabric. The case states: A service provider migrates switch management from a transparent circuit to routed transport. The most direct paired action and test is: verify the specific supported Layer 3 FortiLink deployment method and end-to-end management reachability before using routed hops.
Single fortigate managed topology addresses another technical failure: treating any Layer 2 cable as a validated FortiLink management topology can conceal discovery and control-plane problems. This choice can be useful for that problem, but it does not establish the Fortilink routed transport requirements control being assessed here.
Fortigate ha fortilink resilience would demonstrate or implement: Managed-switch visibility and endpoint forwarding recover through a planned FortiGate HA switchover. This case instead tests Fortilink routed transport requirements; the choice measures or changes another part of the system.