mcAfee Secure Website
exam =5
exam =6

Exam Code: 800-150

Exam Name: Supporting Cisco Devices for Field Technicians

Certification Provider: Cisco

Cisco 800-150 Questions & Answers

Reliable & Actual Study Materials for 800-150 Exam Success

100 Questions & Answers with Testing Engine

"800-150: Supporting Cisco Devices for Field Technicians" Testing Engine covers all the knowledge points of the real Cisco 800-150 exam.

The latest actual 800-150 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at 800-150 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cisco Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cisco 800-150 Practice Test 45

Question 440

Headquarters wiring-closet visit. Field report: An approved new image causes persistent traffic drops after proper testing. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Demonstrate that previous service levels and approved software state are restored.
  2. Confirm only that the work ticket says “completed,” without testing software rollback decision.
  3. Confirm only that the technician attempted: modify a dhcp hostname as a substitute for restoring compatible code.
  4. Confirm the site inventory list still contains the hostname, without validating the reported service.

Explanation

Correct Answer

A:

Previous service levels and approved software state are restored. Controlled rollback provides a recovery path when a new software image fails acceptance.

Incorrect Answers

B:

Check whether previous service levels and approved software state are restored.

C:

For example, “Modify a DHCP hostname as a substitute for restoring compatible code” does not demonstrate the corrected technical state.

D:

Confirm that previous service levels and approved software state are restored.

Question 441

Colocation site RMA handoff. Field report: A platform intermittently resets a supervisor and the field needs timestamps. Which action is the most defensible first step?

  1. Clear log history before capturing the fault evidence.
  2. Review `show logging` and relevant system event messages.
  3. Assume any green link LED rules out chassis alarms.
  4. Use a DNS zone transfer as the sole supervisor event log.

Explanation

Correct Answer

B:

System logs provide timestamped diagnostic messages for platform events. The action should lead to evidence that relevant errors and timestamps are preserved for the support case.

Incorrect Answers

A:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a platform intermittently resets a supervisor and the field needs timestamps. The relevant control is review `show logging` and relevant system event messages.

C:

Attempting this shortcut is not an adequate substitute for the required action. System logs provide timestamped diagnostic messages for platform events. Post-change evidence is still needed.

D:

This alternative would not solve the reported problem. System logs provide timestamped diagnostic messages for platform events. The field team must instead establish whether relevant errors and timestamps are preserved for the support case.

Question 442

Remote office replacement window. Field report: Two parallel links intended as a port-channel forward asymmetrically. A colleague proposes: “Make only one member an access port and the other a trunk.” Which technical assessment is best supported?

  1. There is no need to validate the reported dependency once change the ip route priority but ignore port-channel state.
  2. The original problem can be treated as resolved from inventory labels alone, without checking etherchannel consistency behavior.
  3. The proposal overlooks the reported dependency: Port-channel members must have compatible operational settings and negotiation.
  4. The proposed shortcut is sufficient because run a ping to the dns server and declare member consistency proven.

Explanation

Correct Answer

C:

The alternative does not address the actual reported dependency. Port-channel members must have compatible operational settings and negotiation. The supported intervention is verify lacp mode and member port compatibility on both ends; acceptance should show that members are bundled and traffic uses the correct logical interface.

Incorrect Answers

A:

It assumes an unrelated action establishes service recovery. Nothing about “Change the IP route priority but ignore port-channel state” demonstrates whether members are bundled and traffic uses the correct logical interface.

B:

The failure described in the field report requires a functional check that members are bundled and traffic uses the correct logical interface.

D:

The proposed step “Run a ping to the DNS server and declare member consistency proven” is not the required mechanism.

Question 443

Disaster-recovery facility inspection. Field report: A hostname fails but the management IP remains reachable. Which action is the most defensible first step?

  1. Factory reset the remote device before testing DNS.
  2. Replace an optical module on a fully functional IP management path.
  3. Change the device model label rather than its name service.
  4. Use `nslookup` or equivalent to inspect resolver answer and DNS configuration.

Explanation

Correct Answer

D:

Working IP reachability with failed hostname resolution points to name-service configuration. The action should lead to evidence that the target name resolves to the correct reachable address.

Incorrect Answers

A:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a hostname fails but the management ip remains reachable. The relevant control is use `nslookup` or equivalent to inspect resolver answer and dns configuration.

B:

This alternative would not solve the reported problem. Working IP reachability with failed hostname resolution points to name-service configuration. The field team must instead establish whether the target name resolves to the correct reachable address.

C:

Attempting this shortcut is not an adequate substitute for the required action. Working IP reachability with failed hostname resolution points to name-service configuration. Post-change evidence is still needed.

Question 444

Main campus hardware-service ticket. Field report: A replacement patch cable causes intermittent 1000BASE-T link flaps. Which action is the most defensible first step?

  1. Check RJ45 pair continuity, wiring and cable category with a tester.
  2. Reset collaboration call-control registrations first.
  3. Ignore wire pairs because Ethernet uses IP addresses.
  4. Change the DNS suffix search list.

Explanation

Correct Answer

A:

Physical copper pair integrity is essential for reliable gigabit Ethernet signaling. The action should lead to evidence that cable tester pair mapping passes and flaps stop.

Incorrect Answers

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a replacement patch cable causes intermittent 1000base-t link flaps. The relevant control is check rj45 pair continuity, wiring and cable category with a tester.

C:

Attempting this shortcut is not an adequate substitute for the required action. Physical copper pair integrity is essential for reliable gigabit Ethernet signaling. Post-change evidence is still needed.

D:

This alternative would not solve the reported problem. Physical copper pair integrity is essential for reliable gigabit Ethernet signaling. The field team must instead establish whether cable tester pair mapping passes and flaps stop.

Question 445

Regional north-campus service window. Field report: A replacement Cisco phone powers on but never registers to its call-control cluster. Which action is the most defensible first step?

  1. Replace WAN route processors before testing the phone's voice VLAN.
  2. Check address assignment, provisioning discovery and call-control reachability.
  3. Assume a green PoE port proves SIP/phone registration.
  4. Assign a new random IP subnet without verifying voice services.

Explanation

Correct Answer

B:

IP phones need network services and provisioning before call-control registration. The action should lead to evidence that endpoint obtains network parameters and reaches registered state.

Incorrect Answers

A:

This alternative would not solve the reported problem. IP phones need network services and provisioning before call-control registration. The field team must instead establish whether endpoint obtains network parameters and reaches registered state.

C:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a replacement cisco phone powers on but never registers to its call-control cluster. The relevant control is check address assignment, provisioning discovery and call-control reachability.

D:

Attempting this shortcut is not an adequate substitute for the required action. IP phones need network services and provisioning before call-control registration. Post-change evidence is still needed.

Question 446

Customer branch-site maintenance. Field report: An NCS aggregation router is to receive a different line-rate transceiver. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Close after recording “Select an optic with the same connector but incompatible line rate” without checking that the optic is supported and the link meets optical and error thresholds.
  2. Defer service verification after “Change IP route metrics without verifying physical compatibility” until the next reported incident.
  3. Perform or retain the approved action: check exact ncs interface, speed, optic type and power-budget support; document evidence that the optic is supported and the link meets optical and error thresholds.
  4. Apply “Assume all coherent optics work in every low-cost Ethernet port” as a substitute and declare success from shipment receipt alone.

Explanation

Correct Answer

C:

This handoff preserves the required corrective action and the verifiable service outcome. NCS optical module support is constrained by interface design and platform release. Recording that the optic is supported and the link meets optical and error thresholds makes the signoff testable.

Incorrect Answers

A:

This proposes a different action with no acceptance evidence. “Select an optic with the same connector but incompatible line rate” cannot replace the validated measure that the optic is supported and the link meets optical and error thresholds.

B:

A future incident is not a reasonable acceptance gate for a known problem. “Change IP route metrics without verifying physical compatibility” is not evidence that the optic is supported and the link meets optical and error thresholds.

D:

Delivery paperwork describes logistics, not recovered functionality. “Assume all coherent optics work in every low-cost Ethernet port” leaves the technical requirement and its validation unresolved.

Question 447

Primary data-center night shift. Field report: Staff use a hosted collaboration application without administering its servers. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Close after recording “Install a hypervisor on every user laptop as a prerequisite” without checking that users authenticate and can use the hosted application.
  2. Apply “Classify every cloud meeting as direct bare-metal IaaS access” as a substitute and declare success from shipment receipt alone.
  3. Defer service verification after “Assume a SAN director gives individual users hosted application accounts” until the next reported incident.
  4. Perform or retain the approved action: recognize saas application consumption and its access dependencies; document evidence that users authenticate and can use the hosted application.

Explanation

Correct Answer

D:

This handoff preserves the required corrective action and the verifiable service outcome. SaaS delivers an application rather than raw infrastructure for the customer to administer. Recording that users authenticate and can use the hosted application makes the signoff testable.

Incorrect Answers

A:

This proposes a different action with no acceptance evidence. “Install a hypervisor on every user laptop as a prerequisite” cannot replace the validated measure that users authenticate and can use the hosted application.

B:

Delivery paperwork describes logistics, not recovered functionality. “Classify every cloud meeting as direct bare-metal IaaS access” leaves the technical requirement and its validation unresolved.

C:

A future incident is not a reasonable acceptance gate for a known problem. “Assume a SAN director gives individual users hosted application accounts” is not evidence that users authenticate and can use the hosted application.

Question 448

Headquarters wiring-closet visit. Field report: An edge router has a default route and a more specific route for an internal subnet. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Perform or retain the approved action: use longest-prefix match to identify the intended forwarding route; document evidence that the forwarding path uses the expected next hop for that prefix.
  2. Apply “Choose the oldest route entry irrespective of mask specificity” as a substitute and declare success from shipment receipt alone.
  3. Close after recording “Assume the default route always takes priority regardless of prefix length” without checking that the forwarding path uses the expected next hop for that prefix.
  4. Defer service verification after “Select the route with the longest textual description” until the next reported incident.

Explanation

Correct Answer

A:

This handoff preserves the required corrective action and the verifiable service outcome. IP forwarding normally selects the most specific matching route in the forwarding table. Recording that the forwarding path uses the expected next hop for that prefix makes the signoff testable.

Incorrect Answers

B:

Delivery paperwork describes logistics, not recovered functionality. “Choose the oldest route entry irrespective of mask specificity” leaves the technical requirement and its validation unresolved.

C:

This proposes a different action with no acceptance evidence. “Assume the default route always takes priority regardless of prefix length” cannot replace the validated measure that the forwarding path uses the expected next hop for that prefix.

D:

A future incident is not a reasonable acceptance gate for a known problem. “Select the route with the longest textual description” is not evidence that the forwarding path uses the expected next hop for that prefix.

Question 449

Colocation site RMA handoff. Field report: An old Meraki switch is returned and its replacement must inherit the intended deployment. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm only that the work ticket says “completed,” without testing meraki serial replacement.
  2. Demonstrate that the old and new serial associations and correct dashboard network state.
  3. Confirm the site inventory list still contains the hostname, without validating the reported service.
  4. Confirm only that the technician attempted: leave the failed and replacement devices indistinguishable in inventory.

Explanation

Correct Answer

B:

The old and new serial associations and correct dashboard network state. Meraki inventory and RMA reconciliation are keyed to device serials.

Incorrect Answers

A:

Check whether the old and new serial associations and correct dashboard network state.

C:

Confirm that the old and new serial associations and correct dashboard network state.

D:

For example, “Leave the failed and replacement devices indistinguishable in inventory” does not demonstrate the corrected technical state.

Question 450

Remote office replacement window. Field report: A replacement Catalyst switch forwards locally but its distribution uplink stays down. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm the site inventory list still contains the hostname, without validating the reported service.
  2. Confirm only that the technician attempted: disable stp everywhere to force the failed uplink into forwarding.
  3. Demonstrate that the upstream logical connection and required VLANs/routes are healthy.
  4. Confirm only that the work ticket says “completed,” without testing catalyst uplink recovery.

Explanation

Correct Answer

C:

The upstream logical connection and required VLANs/routes are healthy. Local switch forwarding does not establish restored uplink services.

Incorrect Answers

A:

Confirm that the upstream logical connection and required VLANs/routes are healthy.

B:

For example, “Disable STP everywhere to force the failed uplink into forwarding” does not demonstrate the corrected technical state.

D:

Check whether the upstream logical connection and required VLANs/routes are healthy.