mcAfee Secure Website
exam =5
exam =6

Exam Code: 800-150

Exam Name: Supporting Cisco Devices for Field Technicians

Certification Provider: Cisco

Cisco 800-150 Questions & Answers

Reliable & Actual Study Materials for 800-150 Exam Success

100 Questions & Answers with Testing Engine

"800-150: Supporting Cisco Devices for Field Technicians" Testing Engine covers all the knowledge points of the real Cisco 800-150 exam.

The latest actual 800-150 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at 800-150 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cisco Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cisco 800-150 Practice Test 43

Question 420

Main campus hardware-service ticket. Field report: A Nexus replacement joins the data-center network with stale code. A colleague proposes: “Install an IOS XE image because both products are Cisco switches.” Which technical assessment is best supported?

  1. The proposal overlooks the reported dependency: NX-OS platforms require validated product-specific software and configuration.
  2. The proposed shortcut is sufficient because change the server bios as the nexus os upgrade.
  3. There is no need to validate the reported dependency once copy an unrelated access-switch config without feature review.
  4. The original problem can be treated as resolved from inventory labels alone, without checking nexus software validation behavior.

Explanation

Correct Answer

A:

The alternative does not address the actual reported dependency. NX-OS platforms require validated product-specific software and configuration. The supported intervention is verify supported nx-os version and feature compatibility before reapplying state; acceptance should show that intended NX-OS release and feature/route health after upgrade.

Incorrect Answers

B:

The proposed step “Change the server BIOS as the Nexus OS upgrade” is not the required mechanism.

C:

It assumes an unrelated action establishes service recovery. Nothing about “Copy an unrelated access-switch config without feature review” demonstrates whether intended NX-OS release and feature/route health after upgrade.

D:

The failure described in the field report requires a functional check that intended NX-OS release and feature/route health after upgrade.

Question 421

Regional north-campus service window. Field report: A newly activated IOS XE build has passed acceptance checks but is not committed. A colleague proposes: “Delete the installed manifest so the old image cannot be restored.” Which technical assessment is best supported?

  1. There is no need to validate the reported dependency once reinstall an unrelated package to make the activation permanent.
  2. The proposal overlooks the reported dependency: Commit records the selected active software state for persistence across reload.
  3. The original problem can be treated as resolved from inventory labels alone, without checking install commit stage behavior.
  4. The proposed shortcut is sufficient because treat `show clock` as proof the install is committed.

Explanation

Correct Answer

B:

The alternative does not address the actual reported dependency. Commit records the selected active software state for persistence across reload. The supported intervention is run the documented install commit step to persist the activated package set; acceptance should show that installed state is committed and remains correct after approved validation.

Incorrect Answers

A:

It assumes an unrelated action establishes service recovery. Nothing about “Reinstall an unrelated package to make the activation permanent” demonstrates whether installed state is committed and remains correct after approved validation.

C:

The failure described in the field report requires a functional check that installed state is committed and remains correct after approved validation.

D:

The proposed step “Treat `show clock` as proof the install is committed” is not the required mechanism.

Question 422

Customer branch-site maintenance. Field report: A compatible image was added and the maintenance window allows a reload. A colleague proposes: “Assume uploading an image file automatically changes the running release.” Which technical assessment is best supported?

  1. There is no need to validate the reported dependency once skip change approval because install commands are reversible.
  2. The proposed shortcut is sufficient because modify only ntp servers and expect a new version to run.
  3. The proposal overlooks the reported dependency: Activation applies the selected software and commonly triggers a controlled restart.
  4. The original problem can be treated as resolved from inventory labels alone, without checking install activate stage behavior.

Explanation

Correct Answer

C:

The alternative does not address the actual reported dependency. Activation applies the selected software and commonly triggers a controlled restart. The supported intervention is activate the approved package through the documented install workflow; acceptance should show that the device returns on the intended activated image.

Incorrect Answers

A:

It assumes an unrelated action establishes service recovery. Nothing about “Skip change approval because install commands are reversible” demonstrates whether the device returns on the intended activated image.

B:

The proposed step “Modify only NTP servers and expect a new version to run” is not the required mechanism.

D:

The failure described in the field report requires a functional check that the device returns on the intended activated image.

Question 423

Primary data-center night shift. Field report: An ISR branch uses a cellular module for backup when the wired WAN fails. Which action is the most defensible first step?

  1. Install a USB flash drive to substitute for a cellular modem.
  2. Copy another site's cellular account settings without authorization.
  3. Assume cellular failover works because a Wi-Fi network is visible.
  4. Validate module compatibility, SIM/service and intended failover state.

Explanation

Correct Answer

D:

Backup cellular service needs supported hardware and an active provisioned carrier path. The action should lead to evidence that controlled failover exercises the intended cellular uplink.

Incorrect Answers

A:

That change addresses a different aspect of the environment and leaves this requirement unresolved: an isr branch uses a cellular module for backup when the wired wan fails. The relevant control is validate module compatibility, sim/service and intended failover state.

B:

Attempting this shortcut is not an adequate substitute for the required action. Backup cellular service needs supported hardware and an active provisioned carrier path. Post-change evidence is still needed.

C:

This alternative would not solve the reported problem. Backup cellular service needs supported hardware and an active provisioned carrier path. The field team must instead establish whether controlled failover exercises the intended cellular uplink.

Question 424

Headquarters wiring-closet visit. Field report: A provider-edge ASR line card requires a field replacement. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Perform or retain the approved action: match chassis family, compatible card, slots, optics and software release; document evidence that inventory, interfaces and path reachability after insertion.
  2. Defer service verification after “Move the core interface to an untested management port” until the next reported incident.
  3. Close after recording “Choose a generic campus switch module based only on port count” without checking that inventory, interfaces and path reachability after insertion.
  4. Apply “Assume the same faceplate implies identical supported features” as a substitute and declare success from shipment receipt alone.

Explanation

Correct Answer

A:

This handoff preserves the required corrective action and the verifiable service outcome. ASR network cards have platform-specific support requirements. Recording that inventory, interfaces and path reachability after insertion makes the signoff testable.

Incorrect Answers

B:

A future incident is not a reasonable acceptance gate for a known problem. “Move the core interface to an untested management port” is not evidence that inventory, interfaces and path reachability after insertion.

C:

This proposes a different action with no acceptance evidence. “Choose a generic campus switch module based only on port count” cannot replace the validated measure that inventory, interfaces and path reachability after insertion.

D:

Delivery paperwork describes logistics, not recovered functionality. “Assume the same faceplate implies identical supported features” leaves the technical requirement and its validation unresolved.

Question 425

Colocation site RMA handoff. Field report: A virtual machine moves to another host but loses network reachability. A colleague proposes: “Assume VM migration automatically fixes mismatched VLANs.” Which technical assessment is best supported?

  1. The original problem can be treated as resolved from inventory labels alone, without checking vm mobility network behavior.
  2. The proposal overlooks the reported dependency: Migrated workloads still need compatible virtual and physical network attachment.
  3. The proposed shortcut is sufficient because change every physical server's bios clock to fix routing.
  4. There is no need to validate the reported dependency once remove guest network adapters to restore reachability.

Explanation

Correct Answer

B:

The alternative does not address the actual reported dependency. Migrated workloads still need compatible virtual and physical network attachment. The supported intervention is check virtual switch port group/vlan consistency and external fabric path on destination host; acceptance should show that the migrated guest reaches its intended subnet and services.

Incorrect Answers

A:

The failure described in the field report requires a functional check that the migrated guest reaches its intended subnet and services.

C:

The proposed step “Change every physical server's BIOS clock to fix routing” is not the required mechanism.

D:

It assumes an unrelated action establishes service recovery. Nothing about “Remove guest network adapters to restore reachability” demonstrates whether the migrated guest reaches its intended subnet and services.

Question 426

Remote office replacement window. Field report: An interface shows a fe80:: address but requires external IPv6 connectivity. A colleague proposes: “Assume a link-local address is globally routable across routers.” Which technical assessment is best supported?

  1. There is no need to validate the reported dependency once change an ethernet mac table entry to create an ipv6 route.
  2. The proposed shortcut is sufficient because use an ipv4 arp reply as the complete ipv6 route discovery process.
  3. The proposal overlooks the reported dependency: IPv6 link-local scope does not by itself provide routable IPv6 service.
  4. The original problem can be treated as resolved from inventory labels alone, without checking ipv6 link-local behavior.

Explanation

Correct Answer

C:

The alternative does not address the actual reported dependency. IPv6 link-local scope does not by itself provide routable IPv6 service. The supported intervention is check global or ula address configuration and ipv6 default-routing information; acceptance should show that the host receives the correct IPv6 prefix and a usable default router.

Incorrect Answers

A:

It assumes an unrelated action establishes service recovery. Nothing about “Change an Ethernet MAC table entry to create an IPv6 route” demonstrates whether the host receives the correct IPv6 prefix and a usable default router.

B:

The proposed step “Use an IPv4 ARP reply as the complete IPv6 route discovery process” is not the required mechanism.

D:

The failure described in the field report requires a functional check that the host receives the correct IPv6 prefix and a usable default router.

Question 427

Disaster-recovery facility inspection. Field report: An end host receives an address from the wrong subnet after a port move. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Close after recording “Enable routing on an unrelated loopback” without checking that switchport VLAN and DHCP lease match the approved network.
  2. Defer service verification after “Change the NTP source to the host subnet” until the next reported incident.
  3. Apply “Reset BGP on the core without examining the edge VLAN” as a substitute and declare success from shipment receipt alone.
  4. Perform or retain the approved action: check the access-port vlan assignment against the intended subnet; document evidence that switchport VLAN and DHCP lease match the approved network.

Explanation

Correct Answer

D:

This handoff preserves the required corrective action and the verifiable service outcome. Access VLAN membership determines the host's Layer 2 segment. Recording that switchport VLAN and DHCP lease match the approved network makes the signoff testable.

Incorrect Answers

A:

This proposes a different action with no acceptance evidence. “Enable routing on an unrelated loopback” cannot replace the validated measure that switchport VLAN and DHCP lease match the approved network.

B:

A future incident is not a reasonable acceptance gate for a known problem. “Change the NTP source to the host subnet” is not evidence that switchport VLAN and DHCP lease match the approved network.

C:

Delivery paperwork describes logistics, not recovered functionality. “Reset BGP on the core without examining the edge VLAN” leaves the technical requirement and its validation unresolved.

Question 428

Main campus hardware-service ticket. Field report: A live core switch has many similar fiber uplinks and an RMA is planned. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Perform or retain the approved action: label and map cables, ports and peer endpoints before disconnecting any connections; document evidence that each reconnected port matches its approved peer and cable ID.
  2. Apply “Use identical unlabeled patch cords for all uplinks” as a substitute and declare success from shipment receipt alone.
  3. Close after recording “Unplug every fiber first and identify links only after traffic stops” without checking that each reconnected port matches its approved peer and cable ID.
  4. Defer service verification after “Assume LLDP information alone is a physical substitute for rack-port mapping” until the next reported incident.

Explanation

Correct Answer

A:

This handoff preserves the required corrective action and the verifiable service outcome. Cable mapping reduces accidental cross-patching and speeds restoration. Recording that each reconnected port matches its approved peer and cable ID makes the signoff testable.

Incorrect Answers

B:

Delivery paperwork describes logistics, not recovered functionality. “Use identical unlabeled patch cords for all uplinks” leaves the technical requirement and its validation unresolved.

C:

This proposes a different action with no acceptance evidence. “Unplug every fiber first and identify links only after traffic stops” cannot replace the validated measure that each reconnected port matches its approved peer and cable ID.

D:

A future incident is not a reasonable acceptance gate for a known problem. “Assume LLDP information alone is a physical substitute for rack-port mapping” is not evidence that each reconnected port matches its approved peer and cable ID.

Question 429

Regional north-campus service window. Field report: A workstation can reach local peers but not remote subnets. A colleague proposes: “Replace every LAN switch before inspecting the host address.” Which technical assessment is best supported?

  1. The proposed shortcut is sufficient because set the host default gateway to an unrelated subnet address.
  2. The proposal overlooks the reported dependency: An off-link or incorrect gateway prevents normal inter-subnet forwarding.
  3. The original problem can be treated as resolved from inventory labels alone, without checking ipv4 gateway mismatch behavior.
  4. There is no need to validate the reported dependency once disable the host nic so it cannot send external packets.

Explanation

Correct Answer

B:

The alternative does not address the actual reported dependency. An off-link or incorrect gateway prevents normal inter-subnet forwarding. The supported intervention is check that its default gateway belongs to its configured local subnet; acceptance should show that the host routes nonlocal traffic toward a reachable gateway.

Incorrect Answers

A:

The proposed step “Set the host default gateway to an unrelated subnet address” is not the required mechanism.

C:

The failure described in the field report requires a functional check that the host routes nonlocal traffic toward a reachable gateway.

D:

It assumes an unrelated action establishes service recovery. Nothing about “Disable the host NIC so it cannot send external packets” demonstrates whether the host routes nonlocal traffic toward a reachable gateway.

Question 430

Customer branch-site maintenance. Field report: Several wiring closets need common policy and resilient campus aggregation. Which action is the most defensible first step?

  1. Make every client directly connect to the campus core without an access tier.
  2. Use one USB console hub as an Ethernet distribution switch.
  3. Place distribution/aggregation switching above the access tier.
  4. Assume the building access points can replace core Layer 3 policy.

Explanation

Correct Answer

C:

The distribution tier can aggregate access switches and apply routing or policy functions. The action should lead to evidence that closet uplinks and intended routed VLAN boundaries at distribution.

Incorrect Answers

A:

This alternative would not solve the reported problem. The distribution tier can aggregate access switches and apply routing or policy functions. The field team must instead establish whether closet uplinks and intended routed VLAN boundaries at distribution.

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: several wiring closets need common policy and resilient campus aggregation. The relevant control is place distribution/aggregation switching above the access tier.

D:

Attempting this shortcut is not an adequate substitute for the required action. The distribution tier can aggregate access switches and apply routing or policy functions. Post-change evidence is still needed.

Supporting Cisco Devices for Field Technicians (800-150) Practice Tests