mcAfee Secure Website
exam =5
exam =6

Exam Code: 800-150

Exam Name: Supporting Cisco Devices for Field Technicians

Certification Provider: Cisco

Cisco 800-150 Questions & Answers

Reliable & Actual Study Materials for 800-150 Exam Success

100 Questions & Answers with Testing Engine

"800-150: Supporting Cisco Devices for Field Technicians" Testing Engine covers all the knowledge points of the real Cisco 800-150 exam.

The latest actual 800-150 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at 800-150 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cisco Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cisco 800-150 Practice Test 46

Question 450

Remote office replacement window. Field report: A replacement Catalyst switch forwards locally but its distribution uplink stays down. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm the site inventory list still contains the hostname, without validating the reported service.
  2. Confirm only that the technician attempted: disable stp everywhere to force the failed uplink into forwarding.
  3. Demonstrate that the upstream logical connection and required VLANs/routes are healthy.
  4. Confirm only that the work ticket says “completed,” without testing catalyst uplink recovery.

Explanation

Correct Answer

C:

The upstream logical connection and required VLANs/routes are healthy. Local switch forwarding does not establish restored uplink services.

Incorrect Answers

A:

Confirm that the upstream logical connection and required VLANs/routes are healthy.

B:

For example, “Disable STP everywhere to force the failed uplink into forwarding” does not demonstrate the corrected technical state.

D:

Check whether the upstream logical connection and required VLANs/routes are healthy.

Question 451

Disaster-recovery facility inspection. Field report: A technician needs the running image release and uptime before approving a replacement. Which action is the most defensible first step?

  1. Use `show arp` as the sole evidence of image version.
  2. Use an NTP clock reading to prove the installed software build.
  3. Take a switchport MAC count as the full chassis version record.
  4. Capture `show version` on the relevant Cisco IOS device.

Explanation

Correct Answer

D:

`show version` reports platform and software build details and uptime. The action should lead to evidence that output records the expected image/version and uptime for the correct chassis.

Incorrect Answers

A:

This alternative would not solve the reported problem. `show version` reports platform and software build details and uptime. The field team must instead establish whether output records the expected image/version and uptime for the correct chassis.

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a technician needs the running image release and uptime before approving a replacement. The relevant control is capture `show version` on the relevant cisco ios device.

C:

Attempting this shortcut is not an adequate substitute for the required action. `show version` reports platform and software build details and uptime. Post-change evidence is still needed.

Question 452

Main campus hardware-service ticket. Field report: A modular Catalyst switch requires a replacement line card after a hardware fault. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Perform or retain the approved action: match platform slot, pid, revision and feature support for the replacement line card; document evidence that compatible PID and the card reports online in its assigned slot.
  2. Close after recording “Insert any line card with a similar faceplate regardless of supported chassis” without checking that compatible PID and the card reports online in its assigned slot.
  3. Defer service verification after “Change the switch VLAN name to create a missing hardware port” until the next reported incident.
  4. Apply “Copy another device's serial number to make an incompatible card pass inventory” as a substitute and declare success from shipment receipt alone.

Explanation

Correct Answer

A:

This handoff preserves the required corrective action and the verifiable service outcome. Supported FRU compatibility is determined by chassis/module documentation. Recording that compatible PID and the card reports online in its assigned slot makes the signoff testable.

Incorrect Answers

B:

This proposes a different action with no acceptance evidence. “Insert any line card with a similar faceplate regardless of supported chassis” cannot replace the validated measure that compatible PID and the card reports online in its assigned slot.

C:

A future incident is not a reasonable acceptance gate for a known problem. “Change the switch VLAN name to create a missing hardware port” is not evidence that compatible PID and the card reports online in its assigned slot.

D:

Delivery paperwork describes logistics, not recovered functionality. “Copy another device's serial number to make an incompatible card pass inventory” leaves the technical requirement and its validation unresolved.

Question 453

Regional north-campus service window. Field report: A provider-edge NCS has a redundant chassis component scheduled for replacement. A colleague proposes: “Remove both redundant components while routing traffic.” Which technical assessment is best supported?

  1. The proposed shortcut is sufficient because skip dependency checks because routing is distributed.
  2. The proposal overlooks the reported dependency: A replacement can expose a redundancy fault if the remaining system is not healthy.
  3. The original problem can be treated as resolved from inventory labels alone, without checking ncs redundancy review behavior.
  4. There is no need to validate the reported dependency once use a simple icmp echo as proof all redundancy remains intact.

Explanation

Correct Answer

B:

The alternative does not address the actual reported dependency. A replacement can expose a redundancy fault if the remaining system is not healthy. The supported intervention is verify remaining capacity, fabric path and redundancy state under the service plan; acceptance should show that fault-tolerant roles and path state survive the maintenance.

Incorrect Answers

A:

The proposed step “Skip dependency checks because routing is distributed” is not the required mechanism.

C:

The failure described in the field report requires a functional check that fault-tolerant roles and path state survive the maintenance.

D:

It assumes an unrelated action establishes service recovery. Nothing about “Use a simple ICMP echo as proof all redundancy remains intact” demonstrates whether fault-tolerant roles and path state survive the maintenance.

Question 454

Customer branch-site maintenance. Field report: A storage team needs dedicated Fibre Channel SAN switching. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm only that the work ticket says “completed,” without testing mds product role.
  2. Confirm the site inventory list still contains the hostname, without validating the reported service.
  3. Demonstrate that intended FC ports, VSAN membership and storage connectivity.
  4. Confirm only that the technician attempted: place a webex calling gateway in the storage path.

Explanation

Correct Answer

C:

Intended FC ports, VSAN membership and storage connectivity. Cisco MDS platforms serve SAN Fibre Channel switching and fabric management.

Incorrect Answers

A:

Check whether intended FC ports, VSAN membership and storage connectivity. Cisco MDS platforms serve SAN Fibre Channel switching and fabric management.

B:

Confirm that intended FC ports, VSAN membership and storage connectivity. Cisco MDS platforms serve SAN Fibre Channel switching and fabric management.

D:

For example, “Place a Webex calling gateway in the storage path” does not demonstrate the corrected technical state.

Question 455

Primary data-center night shift. Field report: A phone registers but users cannot find expected enterprise contacts. Which action is the most defensible first step?

  1. Move the switch into NX-OS mode to populate contacts.
  2. Increase physical PoE budget though handset remains powered.
  3. Assume any registered phone automatically has directory entitlement.
  4. Check supported directory service assignment and endpoint access.

Explanation

Correct Answer

D:

Contact-directory features depend on service provisioning and connectivity. The action should lead to evidence that the intended directory records appear for the user.

Incorrect Answers

A:

This alternative would not solve the reported problem. Contact-directory features depend on service provisioning and connectivity. The field team must instead establish whether the intended directory records appear for the user.

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a phone registers but users cannot find expected enterprise contacts. The relevant control is check supported directory service assignment and endpoint access.

C:

Attempting this shortcut is not an adequate substitute for the required action. Contact-directory features depend on service provisioning and connectivity. Post-change evidence is still needed.

Question 456

Headquarters wiring-closet visit. Field report: A replacement phone fails certificate or secure registration checks. Which action is the most defensible first step?

  1. Verify the supported trust/security configuration and device identity under approved procedure.
  2. Copy identity secrets from another handset without authorization.
  3. Change only the screen brightness to reset the trust relationship.
  4. Disable certificate verification globally to force untrusted registration.

Explanation

Correct Answer

A:

Secure phone registration can depend on valid certificates and provisioning identity. The action should lead to evidence that the endpoint registers securely with valid trust state.

Incorrect Answers

B:

Attempting this shortcut is not an adequate substitute for the required action. Secure phone registration can depend on valid certificates and provisioning identity. Post-change evidence is still needed.

C:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a replacement phone fails certificate or secure registration checks. The relevant control is verify the supported trust/security configuration and device identity under approved procedure.

D:

This alternative would not solve the reported problem. Secure phone registration can depend on valid certificates and provisioning identity. The field team must instead establish whether the endpoint registers securely with valid trust state.

Question 457

Colocation site RMA handoff. Field report: A field unit is Cisco Nexus and the RMA runbook includes IOS XE-only commands. Which action is the most defensible first step?

  1. Assume `copy running-config startup-config` changes IOS XE and NX-OS image packages identically.
  2. Use NX-OS platform-specific operating and upgrade instructions.
  3. Install the IOS XE boot manifest because all Cisco switches use the same OS.
  4. Replace the chassis with a Meraki access switch solely to preserve CLI syntax.

Explanation

Correct Answer

B:

Nexus data-center switches normally operate NX-OS with distinct platform behavior. The action should lead to evidence that NX-OS release and supported command syntax for the exact switch.

Incorrect Answers

A:

This alternative would not solve the reported problem. Nexus data-center switches normally operate NX-OS with distinct platform behavior. The field team must instead establish whether NX-OS release and supported command syntax for the exact switch.

C:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a field unit is cisco nexus and the rma runbook includes ios xe-only commands. The relevant control is use nx-os platform-specific operating and upgrade instructions.

D:

Attempting this shortcut is not an adequate substitute for the required action. Nexus data-center switches normally operate NX-OS with distinct platform behavior. Post-change evidence is still needed.

Question 458

Remote office replacement window. Field report: A field visit includes checking an active long-range fiber transmission link. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Apply “Remove safety labels so the connector is easier to see” as a substitute and declare success from shipment receipt alone.
  2. Defer service verification after “Use a copper network cable tester as a substitute for laser safety” until the next reported incident.
  3. Perform or retain the approved action: use approved optical instrumentation and never look into a powered fiber connector; document evidence that optical testing completed without direct viewing of energized fiber.
  4. Close after recording “Inspect the optical core directly by eye to estimate laser power” without checking that optical testing completed without direct viewing of energized fiber.

Explanation

Correct Answer

C:

This handoff preserves the required corrective action and the verifiable service outcome. Fiber transceivers may emit hazardous light invisible to the eye. Recording that optical testing completed without direct viewing of energized fiber makes the signoff testable.

Incorrect Answers

A:

Delivery paperwork describes logistics, not recovered functionality. “Remove safety labels so the connector is easier to see” leaves the technical requirement and its validation unresolved.

B:

A future incident is not a reasonable acceptance gate for a known problem. “Use a copper network cable tester as a substitute for laser safety” is not evidence that optical testing completed without direct viewing of energized fiber.

D:

This proposes a different action with no acceptance evidence. “Inspect the optical core directly by eye to estimate laser power” cannot replace the validated measure that optical testing completed without direct viewing of energized fiber.

Question 459

Disaster-recovery facility inspection. Field report: A UCS domain's hardware is healthy after RMA but a server profile association is missing. Which action is the most defensible first step?

  1. Change the fabric link's DNS PTR record as a profile restore.
  2. Reconfigure an unrelated meeting tenant to create blade identity.
  3. Assume physical power alone establishes server profile application.
  4. Check service-profile association and UCS management inventory before handing off.

Explanation

Correct Answer

D:

UCS service profiles and management assignments can be essential to expected server identity. The action should lead to evidence that the intended profile is associated and operational.

Incorrect Answers

A:

This alternative would not solve the reported problem. UCS service profiles and management assignments can be essential to expected server identity. The field team must instead establish whether the intended profile is associated and operational.

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a ucs domain's hardware is healthy after rma but a server profile association is missing. The relevant control is check service-profile association and ucs management inventory before handing off.

C:

Attempting this shortcut is not an adequate substitute for the required action. UCS service profiles and management assignments can be essential to expected server identity. Post-change evidence is still needed.

Question 460

Main campus hardware-service ticket. Field report: Traffic to one local endpoint floods unexpectedly on a switch. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Demonstrate that the destination MAC is present and learned on the intended interface.
  2. Confirm the site inventory list still contains the hostname, without validating the reported service.
  3. Confirm only that the work ticket says “completed,” without testing mac table forwarding.
  4. Confirm only that the technician attempted: replace the campus wan router without checking bridge learning.

Explanation

Correct Answer

A:

The destination MAC is present and learned on the intended interface. Switches flood unknown unicast when destination MAC forwarding information is absent.

Incorrect Answers

B:

Confirm that the destination MAC is present and learned on the intended interface.

C:

Check whether the destination MAC is present and learned on the intended interface.

D:

For example, “Replace the campus WAN router without checking bridge learning” does not demonstrate the corrected technical state.

Supporting Cisco Devices for Field Technicians (800-150) Practice Tests