mcAfee Secure Website
23

PMI PMP Bundle

Exam Code: PMP

Exam Name Project Management Professional (PMBOK 8)

Certification Provider: PMI

Corresponding Certification: PMP

PMP Training Materials $19.99

Reliable & Actual Study Materials for PMP Exam Success

The Latest PMP Exam Questions as Experienced in the Actual Test!

  • 24
    Questions & Answers

    PMP Questions & Answers

    677 Questions & Answers

    Includes questions types found on actual exam such as drag and drop, simulation, type in, and fill in the blank.

  • exam =30
    Study Guide

    PMP Study Guide

    255 PDF Pages

    Study Guide developed by industry experts who have written exams in the past. They are technology-specific IT certification researchers with at least a decade of experience at Fortune 500 companies.

exam =32

Project Management Professional (PMBOK 8) (PMP) Practice Tests

Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable PMI Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Total Cost: $154.98
Bundle Price: $134.99

Purchase Individually

  • exam =34
    Questions & Answers

    Questions & Answers

    677 Questions

    $124.99
    exam =35
  • exam =36
    Study Guide

    Study Guide

    255 PDF Pages

    $29.99

PMI PMP Practice Test 64

Question 630

While resolving an implementation issue on a predictive initiative, a supplier offers insurance against data breaches but a known administrative credential exposure remains unfixed. Which evidence would best substantiate that the intended outcome is actually achieved?

  1. Review supplier mapping and realistic alternative lead times.
  2. Review corrective access tests together with binding insurance exclusions.
  3. Inspect risk register for owner, threshold and rehearsed fallback criteria.
  4. Review updated risk register and protective control effectiveness tests.

Explanation

Correct Answer

B:

Review corrective access tests together with binding insurance exclusions. The evidence tests whether the intended behavior or acceptance occurred instead of relying on unsupported assurances. In this case, transferring some financial loss does not remove the technical exposure. The stated constraint is: A supplier offers insurance against data breaches but a known administrative credential exposure remains unfixed. The chosen assurance is the most direct response under these conditions.

Incorrect Answers

A:

Review supplier mapping and realistic alternative lead times. This response addresses another situation in the same task area: A global sourcing project depends on one semiconductor foundry in a politically unstable region. There, risk responses must address likelihood and consequence of a specific dependency. For the current situation—A supplier offers insurance against data breaches but a known administrative credential exposure remains unfixed—this option would leave the specific need unresolved: transferring some financial loss does not remove the technical exposure.

C:

Inspect risk register for owner, threshold and rehearsed fallback criteria. This response addresses another situation in the same task area: A hybrid research project has identified a vendor data-quality risk but no trigger or response owner. There, a risk entry without monitoring and a responsible actor is not executable. For the current situation—A supplier offers insurance against data breaches but a known administrative credential exposure remains unfixed—this option would leave the specific need unresolved: transferring some financial loss does not remove the technical exposure.

D:

Review updated risk register and protective control effectiveness tests. This response addresses another situation in the same task area: An adaptive digital platform sees an early rise in account takeover but the risk owner has not reassessed assumptions. There, risk monitoring must change decisions when threat evidence invalidates assumptions. For the current situation—A supplier offers insurance against data breaches but a known administrative credential exposure remains unfixed—this option would leave the specific need unresolved: transferring some financial loss does not remove the technical exposure.

Question 631

In a discussion with the delivery team on a hybrid initiative, a hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance. What should the project manager do first to address the specific problem?

  1. Define measurable risk triggers and assign a specific response owner.
  2. Model catastrophic impact explicitly and assess engineered prevention and contingency.
  3. Escalate treatment alternatives and validate resilient workflows before go-live.
  4. Trigger timely risk reanalysis and adjust prioritized security responses.

Explanation

Correct Answer

C:

Escalate treatment alternatives and validate resilient workflows before go-live. The intervention directly targets the cause described in the scenario rather than creating an unrelated process change. In this case, business-critical exposure needs decisions grounded in harm and recovery capability. The stated constraint is: A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance. The chosen action is the most direct response under these conditions.

Incorrect Answers

A:

Define measurable risk triggers and assign a specific response owner. This response addresses another situation in the same task area: A hybrid research project has identified a vendor data-quality risk but no trigger or response owner. There, a risk entry without monitoring and a responsible actor is not executable. For the current situation—A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance—this option would leave the specific need unresolved: business-critical exposure needs decisions grounded in harm and recovery capability.

B:

Model catastrophic impact explicitly and assess engineered prevention and contingency. This response addresses another situation in the same task area: A predictive bridge project has a low-frequency flood event that could destroy temporary supports. There, low probability does not make an extreme consequence acceptable by default. For the current situation—A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance—this option would leave the specific need unresolved: business-critical exposure needs decisions grounded in harm and recovery capability.

D:

Trigger timely risk reanalysis and adjust prioritized security responses. This response addresses another situation in the same task area: An adaptive digital platform sees an early rise in account takeover but the risk owner has not reassessed assumptions. There, risk monitoring must change decisions when threat evidence invalidates assumptions. For the current situation—A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance—this option would leave the specific need unresolved: business-critical exposure needs decisions grounded in harm and recovery capability.

Question 632

At the next sponsor and team checkpoint on a hybrid initiative, a hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance. Which assignment establishes appropriate accountability for the affected decision?

  1. Have engineering safety owner authorize protections and sponsor fund residual exposure.
  2. Have clinical risk owner decide acceptable service exposure with technology lead evidence.
  3. Have data workstream owner manage trigger monitoring and sponsor authorize material fallback.
  4. Have business risk owner accept residual risk and security owner implement credential remediation.

Explanation

Correct Answer

B:

Have clinical risk owner decide acceptable service exposure with technology lead evidence. The selected owner has authority over the specific business decision instead of transferring responsibility to an unrelated function. In this case, business-critical exposure needs decisions grounded in harm and recovery capability. The stated constraint is: A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance. The chosen accountability is the most direct response under these conditions.

Incorrect Answers

A:

Have engineering safety owner authorize protections and sponsor fund residual exposure. This response addresses another situation in the same task area: A predictive bridge project has a low-frequency flood event that could destroy temporary supports. There, low probability does not make an extreme consequence acceptable by default. For the current situation—A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance—this option would leave the specific need unresolved: business-critical exposure needs decisions grounded in harm and recovery capability.

C:

Have data workstream owner manage trigger monitoring and sponsor authorize material fallback. This response addresses another situation in the same task area: A hybrid research project has identified a vendor data-quality risk but no trigger or response owner. There, a risk entry without monitoring and a responsible actor is not executable. For the current situation—A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance—this option would leave the specific need unresolved: business-critical exposure needs decisions grounded in harm and recovery capability.

D:

Have business risk owner accept residual risk and security owner implement credential remediation. This response addresses another situation in the same task area: A supplier offers insurance against data breaches but a known administrative credential exposure remains unfixed. There, transferring some financial loss does not remove the technical exposure. For the current situation—A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance—this option would leave the specific need unresolved: business-critical exposure needs decisions grounded in harm and recovery capability.

Question 633

During an integrated project review on a hybrid initiative, a hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance. Which indicator would most directly show whether this specific situation is improving?

  1. Track unprotected critical work windows during flood season.
  2. Track forecast downtime against clinical tolerance and recovery readiness.
  3. Track schedule exposure to the sole-source dependency and alternate capacity readiness.
  4. Track issue resolution time and remaining schedule exposure after discovery.

Explanation

Correct Answer

B:

Track forecast downtime against clinical tolerance and recovery readiness. The indicator reflects the underlying outcome or remaining exposure rather than a nearby but different activity. In this case, business-critical exposure needs decisions grounded in harm and recovery capability. The stated constraint is: A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance. The chosen measurement is the most direct response under these conditions.

Incorrect Answers

A:

Track unprotected critical work windows during flood season. This response addresses another situation in the same task area: A predictive bridge project has a low-frequency flood event that could destroy temporary supports. There, low probability does not make an extreme consequence acceptable by default. For the current situation—A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance—this option would leave the specific need unresolved: business-critical exposure needs decisions grounded in harm and recovery capability.

C:

Track schedule exposure to the sole-source dependency and alternate capacity readiness. This response addresses another situation in the same task area: A global sourcing project depends on one semiconductor foundry in a politically unstable region. There, risk responses must address likelihood and consequence of a specific dependency. For the current situation—A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance—this option would leave the specific need unresolved: business-critical exposure needs decisions grounded in harm and recovery capability.

D:

Track issue resolution time and remaining schedule exposure after discovery. This response addresses another situation in the same task area: A municipal infrastructure project experiences the materialization of a risk previously listed as a possible buried utility obstruction. There, a risk that has occurred must be resolved as a current issue and its forecast revised. For the current situation—A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance—this option would leave the specific need unresolved: business-critical exposure needs decisions grounded in harm and recovery capability.

Question 634

In a project coordination meeting on a hybrid initiative, a hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance. Which evidence would best substantiate that the intended outcome is actually achieved?

  1. Review supplier mapping and realistic alternative lead times.
  2. Review corrective access tests together with binding insurance exclusions.
  3. Review recovery rehearsal and signed clinical risk decisions.
  4. Inspect engineering calculations and emergency-response readiness evidence.

Explanation

Correct Answer

C:

Review recovery rehearsal and signed clinical risk decisions. The evidence tests whether the intended behavior or acceptance occurred instead of relying on unsupported assurances. In this case, business-critical exposure needs decisions grounded in harm and recovery capability. The stated constraint is: A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance. The chosen assurance is the most direct response under these conditions.

Incorrect Answers

A:

Review supplier mapping and realistic alternative lead times. This response addresses another situation in the same task area: A global sourcing project depends on one semiconductor foundry in a politically unstable region. There, risk responses must address likelihood and consequence of a specific dependency. For the current situation—A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance—this option would leave the specific need unresolved: business-critical exposure needs decisions grounded in harm and recovery capability.

B:

Review corrective access tests together with binding insurance exclusions. This response addresses another situation in the same task area: A supplier offers insurance against data breaches but a known administrative credential exposure remains unfixed. There, transferring some financial loss does not remove the technical exposure. For the current situation—A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance—this option would leave the specific need unresolved: business-critical exposure needs decisions grounded in harm and recovery capability.

D:

Inspect engineering calculations and emergency-response readiness evidence. This response addresses another situation in the same task area: A predictive bridge project has a low-frequency flood event that could destroy temporary supports. There, low probability does not make an extreme consequence acceptable by default. For the current situation—A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance—this option would leave the specific need unresolved: business-critical exposure needs decisions grounded in harm and recovery capability.

Question 635

In a project risk and outcome review on a hybrid initiative, a hybrid research project has identified a vendor data-quality risk but no trigger or response owner. What should the project manager do first to address the specific problem?

  1. Pair risk-transfer terms with mitigation of the underlying exposure.
  2. Define measurable risk triggers and assign a specific response owner.
  3. Activate the planned response and convert the event to a managed issue with forecast updates.
  4. Escalate treatment alternatives and validate resilient workflows before go-live.

Explanation

Correct Answer

B:

Define measurable risk triggers and assign a specific response owner. The intervention directly targets the cause described in the scenario rather than creating an unrelated process change. In this case, a risk entry without monitoring and a responsible actor is not executable. The stated constraint is: A hybrid research project has identified a vendor data-quality risk but no trigger or response owner. The chosen action is the most direct response under these conditions.

Incorrect Answers

A:

Pair risk-transfer terms with mitigation of the underlying exposure. This response addresses another situation in the same task area: A supplier offers insurance against data breaches but a known administrative credential exposure remains unfixed. There, transferring some financial loss does not remove the technical exposure. For the current situation—A hybrid research project has identified a vendor data-quality risk but no trigger or response owner—this option would leave the specific need unresolved: a risk entry without monitoring and a responsible actor is not executable.

C:

Activate the planned response and convert the event to a managed issue with forecast updates. This response addresses another situation in the same task area: A municipal infrastructure project experiences the materialization of a risk previously listed as a possible buried utility obstruction. There, a risk that has occurred must be resolved as a current issue and its forecast revised. For the current situation—A hybrid research project has identified a vendor data-quality risk but no trigger or response owner—this option would leave the specific need unresolved: a risk entry without monitoring and a responsible actor is not executable.

D:

Escalate treatment alternatives and validate resilient workflows before go-live. This response addresses another situation in the same task area: A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance. There, business-critical exposure needs decisions grounded in harm and recovery capability. For the current situation—A hybrid research project has identified a vendor data-quality risk but no trigger or response owner—this option would leave the specific need unresolved: a risk entry without monitoring and a responsible actor is not executable.

Question 636

During a delivery checkpoint on a hybrid initiative, a hybrid research project has identified a vendor data-quality risk but no trigger or response owner. Which assignment establishes appropriate accountability for the affected decision?

  1. Have product risk owner approve risk treatment and team integrate safeguards.
  2. Have engineering safety owner authorize protections and sponsor fund residual exposure.
  3. Have data workstream owner manage trigger monitoring and sponsor authorize material fallback.
  4. Have procurement risk owner decide mitigation with sponsor approval of added cost.

Explanation

Correct Answer

C:

Have data workstream owner manage trigger monitoring and sponsor authorize material fallback. The selected owner has authority over the specific business decision instead of transferring responsibility to an unrelated function. In this case, a risk entry without monitoring and a responsible actor is not executable. The stated constraint is: A hybrid research project has identified a vendor data-quality risk but no trigger or response owner. The chosen accountability is the most direct response under these conditions.

Incorrect Answers

A:

Have product risk owner approve risk treatment and team integrate safeguards. This response addresses another situation in the same task area: An adaptive digital platform sees an early rise in account takeover but the risk owner has not reassessed assumptions. There, risk monitoring must change decisions when threat evidence invalidates assumptions. For the current situation—A hybrid research project has identified a vendor data-quality risk but no trigger or response owner—this option would leave the specific need unresolved: a risk entry without monitoring and a responsible actor is not executable.

B:

Have engineering safety owner authorize protections and sponsor fund residual exposure. This response addresses another situation in the same task area: A predictive bridge project has a low-frequency flood event that could destroy temporary supports. There, low probability does not make an extreme consequence acceptable by default. For the current situation—A hybrid research project has identified a vendor data-quality risk but no trigger or response owner—this option would leave the specific need unresolved: a risk entry without monitoring and a responsible actor is not executable.

D:

Have procurement risk owner decide mitigation with sponsor approval of added cost. This response addresses another situation in the same task area: A global sourcing project depends on one semiconductor foundry in a politically unstable region. There, risk responses must address likelihood and consequence of a specific dependency. For the current situation—A hybrid research project has identified a vendor data-quality risk but no trigger or response owner—this option would leave the specific need unresolved: a risk entry without monitoring and a responsible actor is not executable.

Question 637

During a project governance review on a hybrid initiative, a hybrid research project has identified a vendor data-quality risk but no trigger or response owner. Which indicator would most directly show whether this specific situation is improving?

  1. Track unresolved high-impact risks without trigger or accountable response.
  2. Track forecast downtime against clinical tolerance and recovery readiness.
  3. Track exposed privileged accounts and insured/uninsured loss coverage.
  4. Track schedule exposure to the sole-source dependency and alternate capacity readiness.

Explanation

Correct Answer

A:

Track unresolved high-impact risks without trigger or accountable response. The indicator reflects the underlying outcome or remaining exposure rather than a nearby but different activity. In this case, a risk entry without monitoring and a responsible actor is not executable. The stated constraint is: A hybrid research project has identified a vendor data-quality risk but no trigger or response owner. The chosen measurement is the most direct response under these conditions.

Incorrect Answers

B:

Track forecast downtime against clinical tolerance and recovery readiness. This response addresses another situation in the same task area: A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance. There, business-critical exposure needs decisions grounded in harm and recovery capability. For the current situation—A hybrid research project has identified a vendor data-quality risk but no trigger or response owner—this option would leave the specific need unresolved: a risk entry without monitoring and a responsible actor is not executable.

C:

Track exposed privileged accounts and insured/uninsured loss coverage. This response addresses another situation in the same task area: A supplier offers insurance against data breaches but a known administrative credential exposure remains unfixed. There, transferring some financial loss does not remove the technical exposure. For the current situation—A hybrid research project has identified a vendor data-quality risk but no trigger or response owner—this option would leave the specific need unresolved: a risk entry without monitoring and a responsible actor is not executable.

D:

Track schedule exposure to the sole-source dependency and alternate capacity readiness. This response addresses another situation in the same task area: A global sourcing project depends on one semiconductor foundry in a politically unstable region. There, risk responses must address likelihood and consequence of a specific dependency. For the current situation—A hybrid research project has identified a vendor data-quality risk but no trigger or response owner—this option would leave the specific need unresolved: a risk entry without monitoring and a responsible actor is not executable.

Question 638

In a discussion with the delivery team on a hybrid initiative, a hybrid research project has identified a vendor data-quality risk but no trigger or response owner. Which evidence would best substantiate that the intended outcome is actually achieved?

  1. Inspect engineering calculations and emergency-response readiness evidence.
  2. Review recovery rehearsal and signed clinical risk decisions.
  3. Verify excavation findings and the authorized recovery response.
  4. Inspect risk register for owner, threshold and rehearsed fallback criteria.

Explanation

Correct Answer

D:

Inspect risk register for owner, threshold and rehearsed fallback criteria. The evidence tests whether the intended behavior or acceptance occurred instead of relying on unsupported assurances. In this case, a risk entry without monitoring and a responsible actor is not executable. The stated constraint is: A hybrid research project has identified a vendor data-quality risk but no trigger or response owner. The chosen assurance is the most direct response under these conditions.

Incorrect Answers

A:

Inspect engineering calculations and emergency-response readiness evidence. This response addresses another situation in the same task area: A predictive bridge project has a low-frequency flood event that could destroy temporary supports. There, low probability does not make an extreme consequence acceptable by default. For the current situation—A hybrid research project has identified a vendor data-quality risk but no trigger or response owner—this option would leave the specific need unresolved: a risk entry without monitoring and a responsible actor is not executable.

B:

Review recovery rehearsal and signed clinical risk decisions. This response addresses another situation in the same task area: A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance. There, business-critical exposure needs decisions grounded in harm and recovery capability. For the current situation—A hybrid research project has identified a vendor data-quality risk but no trigger or response owner—this option would leave the specific need unresolved: a risk entry without monitoring and a responsible actor is not executable.

C:

Verify excavation findings and the authorized recovery response. This response addresses another situation in the same task area: A municipal infrastructure project experiences the materialization of a risk previously listed as a possible buried utility obstruction. There, a risk that has occurred must be resolved as a current issue and its forecast revised. For the current situation—A hybrid research project has identified a vendor data-quality risk but no trigger or response owner—this option would leave the specific need unresolved: a risk entry without monitoring and a responsible actor is not executable.

Question 639

During a delivery checkpoint on a predictive initiative, a municipal infrastructure project experiences the materialization of a risk previously listed as a possible buried utility obstruction. What should the project manager do first to address the specific problem?

  1. Activate the planned response and convert the event to a managed issue with forecast updates.
  2. Model catastrophic impact explicitly and assess engineered prevention and contingency.
  3. Quantify concentration exposure and prepare a feasible alternate supply response.
  4. Escalate treatment alternatives and validate resilient workflows before go-live.

Explanation

Correct Answer

A:

Activate the planned response and convert the event to a managed issue with forecast updates. The intervention directly targets the cause described in the scenario rather than creating an unrelated process change. In this case, a risk that has occurred must be resolved as a current issue and its forecast revised. The stated constraint is: A municipal infrastructure project experiences the materialization of a risk previously listed as a possible buried utility obstruction. The chosen action is the most direct response under these conditions.

Incorrect Answers

B:

Model catastrophic impact explicitly and assess engineered prevention and contingency. This response addresses another situation in the same task area: A predictive bridge project has a low-frequency flood event that could destroy temporary supports. There, low probability does not make an extreme consequence acceptable by default. For the current situation—A municipal infrastructure project experiences the materialization of a risk previously listed as a possible buried utility obstruction—this option would leave the specific need unresolved: a risk that has occurred must be resolved as a current issue and its forecast revised.

C:

Quantify concentration exposure and prepare a feasible alternate supply response. This response addresses another situation in the same task area: A global sourcing project depends on one semiconductor foundry in a politically unstable region. There, risk responses must address likelihood and consequence of a specific dependency. For the current situation—A municipal infrastructure project experiences the materialization of a risk previously listed as a possible buried utility obstruction—this option would leave the specific need unresolved: a risk that has occurred must be resolved as a current issue and its forecast revised.

D:

Escalate treatment alternatives and validate resilient workflows before go-live. This response addresses another situation in the same task area: A hospital system rollout has a validated chance of downtime exceeding its clinical service tolerance. There, business-critical exposure needs decisions grounded in harm and recovery capability. For the current situation—A municipal infrastructure project experiences the materialization of a risk previously listed as a possible buried utility obstruction—this option would leave the specific need unresolved: a risk that has occurred must be resolved as a current issue and its forecast revised.

Question 640

During a project governance review on a predictive initiative, a municipal infrastructure project experiences the materialization of a risk previously listed as a possible buried utility obstruction. Which assignment establishes appropriate accountability for the affected decision?

  1. Have data workstream owner manage trigger monitoring and sponsor authorize material fallback.
  2. Have civil works lead resolve the obstruction and project manager communicate consequences.
  3. Have procurement risk owner decide mitigation with sponsor approval of added cost.
  4. Have product risk owner approve risk treatment and team integrate safeguards.

Explanation

Correct Answer

B:

Have civil works lead resolve the obstruction and project manager communicate consequences. The selected owner has authority over the specific business decision instead of transferring responsibility to an unrelated function. In this case, a risk that has occurred must be resolved as a current issue and its forecast revised. The stated constraint is: A municipal infrastructure project experiences the materialization of a risk previously listed as a possible buried utility obstruction. The chosen accountability is the most direct response under these conditions.

Incorrect Answers

A:

Have data workstream owner manage trigger monitoring and sponsor authorize material fallback. This response addresses another situation in the same task area: A hybrid research project has identified a vendor data-quality risk but no trigger or response owner. There, a risk entry without monitoring and a responsible actor is not executable. For the current situation—A municipal infrastructure project experiences the materialization of a risk previously listed as a possible buried utility obstruction—this option would leave the specific need unresolved: a risk that has occurred must be resolved as a current issue and its forecast revised.

C:

Have procurement risk owner decide mitigation with sponsor approval of added cost. This response addresses another situation in the same task area: A global sourcing project depends on one semiconductor foundry in a politically unstable region. There, risk responses must address likelihood and consequence of a specific dependency. For the current situation—A municipal infrastructure project experiences the materialization of a risk previously listed as a possible buried utility obstruction—this option would leave the specific need unresolved: a risk that has occurred must be resolved as a current issue and its forecast revised.

D:

Have product risk owner approve risk treatment and team integrate safeguards. This response addresses another situation in the same task area: An adaptive digital platform sees an early rise in account takeover but the risk owner has not reassessed assumptions. There, risk monitoring must change decisions when threat evidence invalidates assumptions. For the current situation—A municipal infrastructure project experiences the materialization of a risk previously listed as a possible buried utility obstruction—this option would leave the specific need unresolved: a risk that has occurred must be resolved as a current issue and its forecast revised.