mcAfee Secure Website
exam =5
exam =6

Exam Code: 4A0-C03

Exam Name: Nokia NRS II Composite: IS-IS version

Certification Provider: Nokia

Nokia 4A0-C03 Questions & Answers

Reliable & Actual Study Materials for 4A0-C03 Exam Success

145 Questions & Answers with Testing Engine

"4A0-C03: Nokia NRS II Composite: IS-IS version" Testing Engine covers all the knowledge points of the real Nokia 4A0-C03 exam.

The latest actual 4A0-C03 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at 4A0-C03 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Nokia Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Nokia 4A0-C03 Practice Test 13

Question 120

A Nokia operator is careful about conclusions: a selected RSVP shortcut tunnel fails but its dependent IP next-hop policy continues forwarding into stale label state. What is the key limit on what can be inferred?

  1. A previously active shortcut is not proof it remains a usable transport option.
  2. An active RSVP LSP does not imply it is selected for all IP routes.
  3. An LSP's egress address cannot alone prove customer service termination.
  4. An IPv4-only IGP in the P core does not automatically prohibit IPv6-over-MPLS services.

Explanation

Correct Answer

A:

IP shortcut routing must track real transport LSP liveness. Ensure route resolution withdraws failed shortcut eligibility and uses a valid supported fallback.

Incorrect Answers

B:

Check supported shortcut policy and route-resolution scope for each destination. Packets switch to an operational route or alternate LSP after the failure is detected.

C:

MPLS tunnel termination and final destination forwarding are distinct stages. Packets switch to an operational route or alternate LSP after the failure is detected.

D:

MPLS can carry IPv6 payloads across a core whose transport control is IPv4-based. IPv6 payloads traverse the label core while the designated P routers need only appropriate transport forwarding. Packets switch to an operational route or alternate LSP after the failure is detected.

Question 121

A peer suggests a risky fix: an operator discovers an extra LSP ID on an IS-IS LAN and opens a hardware ticket for a nonexistent fourth router. Which unsafe action is most directly related?

  1. Remove a live DIS because the pseudonode record looks like an additional router.
  2. Increase SPF retry rate instead of repairing the undersized LSP transport path.
  3. Declare the LSDB synchronized solely because PSNP frames were observed.
  4. Run SPF from only the CSNP listing while skipping missing LSP payloads.

Explanation

Correct Answer

A:

A DIS may originate a pseudonode LSP representing a multiaccess network. The proposed “Remove a live DIS because the pseudonode record looks like an additional router” conflicts with that requirement. Map the pseudonode LSP to the elected DIS and actual LAN circuit identifier.

Incorrect Answers

B:

Adjacency hello size and full link-state synchronization transport requirements differ. Map the pseudonode LSP to the elected DIS and actual LAN circuit identifier.

C:

PSNPs support targeted link-state retransmission or acknowledgment behavior. The exact missing fragment arrives and both endpoints have consistent versioned LSP sets. Map the pseudonode LSP to the elected DIS and actual LAN circuit identifier.

D:

CSNPs summarize database version information rather than replacing full LSP bodies. A DIS may originate a pseudonode LSP representing a multiaccess network.

Question 122

A customer IP packet fits a 1500-byte path unencapsulated but drops when two MPLS labels are imposed over a constrained link. Which corrective engineering action targets this specific fault?

  1. Inspect label TTL processing and any supported TTL propagation policy.
  2. Calculate and test effective payload and service overhead at every labeled hop.
  3. Restore an eligible label-forwarding mapping consistent with selected transport next hop.
  4. Check whether implicit-null or PHP behavior is expected at the penultimate hop.

Explanation

Correct Answer

B:

Each MPLS label consumes additional header bytes that affect wire size. The required packet size traverses the core without MTU-related drops.

Incorrect Answers

A:

MPLS TTL limits label-switched forwarding and interacts with configured propagation behavior. Calculate and test effective payload and service overhead at every labeled hop.

C:

MPLS transit label switching relies on installed incoming and outgoing label mappings. Each MPLS label consumes additional header bytes that affect wire size.

D:

Check whether implicit-null or PHP behavior is expected at the penultimate hop. Calculate and test effective payload and service overhead at every labeled hop.

Question 123

In the current composite-exam scenario, a new VPNv4 iBGP neighbor is provisioned with a match-all import policy and unexpected customer RDs appear in a management VRF. Which change is best supported?

  1. Test the effective rule order, exact prefix match and policy control-flow semantics.
  2. Constrain import and target policies at the appropriate MP-BGP and VPN boundaries.
  3. Keep an explicit permitted-prefix list and use provider authorization before changing import policy.
  4. Trace community propagation and supported upstream policy treatment through the export chain.

Explanation

Correct Answer

B:

BGP policy must isolate tenant route distribution by intended address family and targets. Management routes exclude unrelated customer NLRI and correct VRFs retain authorized reachability.

Incorrect Answers

A:

BGP route policy order and action termination define matching behavior. The prefix is rejected or permitted only as documented after ordered evaluation. Constrain import and target policies at the appropriate MP-BGP and VPN boundaries.

C:

Keep an explicit permitted-prefix list and use provider authorization before changing import policy. Constrain import and target policies at the appropriate MP-BGP and VPN boundaries.

D:

BGP communities convey policy metadata only when preserved and interpreted. Constrain import and target policies at the appropriate MP-BGP and VPN boundaries.

Question 124

A newly booted PE advertises IS-IS overload while service programming is incomplete and a technician tries to clear overload immediately. Which remediation shortcut must be rejected for this specific fault?

  1. Change the local metric repeatedly without verifying propagation to neighbors.
  2. Enable uncontrolled neighbor discovery on every system loopback to fix missing remote pings.
  3. Clear overload solely because the control-plane neighbor state is already up.
  4. Delete the second valid next hop because one flow chose the first one.

Explanation

Correct Answer

C:

IS-IS overload signaling can discourage transit through an impaired or initializing router. The proposed “Clear overload solely because the control-plane neighbor state is already up” conflicts with that requirement. Verify forwarding readiness and supported overload release conditions before exposing the box as transit.

Incorrect Answers

A:

Distributed SPF convergence depends on current metric advertisements reaching peers. IS-IS overload signaling can discourage transit through an impaired or initializing router.

B:

Verify passive-interface behavior, loopback prefix origination and transit neighbor activation separately. Verify forwarding readiness and supported overload release conditions before exposing the box as transit.

D:

IS-IS SPF may install multiple equal-cost routes while flow distribution is separate. Both equal-cost paths are eligible and can carry different flows as configured. Verify forwarding readiness and supported overload release conditions before exposing the box as transit.

Question 125

A customer receives a public IES address, but an operator assumes the provider is automatically performing NAT solely because the interface is Internet-facing. What protocol mechanism governs the correct response?

  1. IES routed interfaces must be associated with correct service attachments.
  2. IES provides routed service connectivity distinct from transparent Layer 2 pseudowire transport.
  3. IES may provide IP routing for both IPv4 and IPv6 but address-family functions differ.
  4. Routed Internet services do not inherently require NAT for legitimately assigned public addresses.

Explanation

Correct Answer

D:

Verify the contracted addressing and optional translation design separately from routed IES forwarding. Packets follow the intended address assignment without unwanted hidden translation.

Incorrect Answers

A:

Reconcile the actual IES interface and SAP attachment before changing global routes. Packets follow the intended address assignment without unwanted hidden translation.

B:

IES provides routed service connectivity distinct from transparent Layer 2 pseudowire transport. Packets follow the intended address assignment without unwanted hidden translation.

C:

IES may provide IP routing for both IPv4 and IPv6 but address-family functions differ. IPv6 hosts discover their permitted on-link router and route outside their subnet. Packets follow the intended address assignment without unwanted hidden translation.

Question 126

A customer prefix appears in VPNv4 control-plane tables and BGP is Established, but packets drop at egress because the target VPRN service is administratively down. Which technical principle most directly explains the failure?

  1. Service control-plane advertisements and actual service data-plane availability must both be verified.
  2. VPRN forwarding depends on coordinated MP-BGP routing and MPLS service demultiplexing.
  3. RDs distinguish VPN NLRI while RTs control allowed route distribution.
  4. VPRN uses separate routed VPN contexts over a shared provider infrastructure.

Explanation

Correct Answer

A:

Check service operational state and forwarding label programming independently of BGP route reception. The egress VPN instance becomes operational and test traffic reaches the intended interface.

Incorrect Answers

B:

VPRN forwarding depends on coordinated MP-BGP routing and MPLS service demultiplexing. Packets use an eligible outer LSP and proper VPN service label to reach the tenant destination. The egress VPN instance becomes operational and test traffic reaches the intended interface.

C:

RDs distinguish VPN NLRI while RTs control allowed route distribution. Service control-plane advertisements and actual service data-plane availability must both be verified.

D:

Maintain distinct VPN routing contexts with appropriate RD and RT configuration. The egress VPN instance becomes operational and test traffic reaches the intended interface.

Question 127

While investigating, an explicit TE route contains a loose regional waypoint, but a technician treats it as one exact outgoing interface and rejects valid alternate hops. Which proposed step is unjustified in context?

  1. Call two separate LSP objects physically diverse without examining common infrastructure.
  2. Ignore administrative-group exclusions because ordinary IP traffic uses the link.
  3. Configure every loose hop as the only permitted adjacent physical interface without checking topology.
  4. Force all foreign area LSPs into the local Level 1 database to calculate one tunnel.

Explanation

Correct Answer

C:

RSVP ERO hops can express different degrees of path constraint. The proposed “Configure every loose hop as the only permitted adjacent physical interface without checking topology” conflicts with that requirement. Validate strict and loose hop semantics and downstream path expansion behavior.

Incorrect Answers

A:

TE diversity requires considering failure domains beyond link names. After the node fault, the secondary path remains operational and meets service objectives. Validate strict and loose hop semantics and downstream path expansion behavior.

B:

MPLS TE may apply link-affinity and administrative group policy during path selection. RSVP ERO hops can express different degrees of path constraint.

D:

TE path computation across IGP areas requires suitable abstraction or hierarchical design. Validate strict and loose hop semantics and downstream path expansion behavior.

Question 128

This observation alone is incomplete: customers in a VPLS can bridge local traffic, but they need an inter-VLAN routed gateway and the current design has only Layer 2 service attachment. Which inference is appropriate?

  1. IPv4 failover test results cannot establish IPv6 service restoration.
  2. Working customer Ethernet broadcasts do not prove the service provides inter-subnet routing.
  3. A functioning IPv4 VPRN cannot prove that IPv6 route signaling is configured.
  4. A VPN prefix learned from BGP cannot establish correctness of the egress SAP.

Explanation

Correct Answer

B:

Routed VPLS couples an L2 service with a Layer 3 forwarding interface. Add a supported routed-VPLS integration according to service architecture and route-policy needs.

Incorrect Answers

A:

Multi-family VPN resilience must be tested per family and transport dependency. Routed VPLS couples an L2 service with a Layer 3 forwarding interface.

C:

Dual-stack VPRN needs family-specific signaling and forwarding eligibility. Inter-VLAN IP traffic passes the approved routed gateway while original bridging remains isolated.

D:

VPRN routed forwarding combines isolated route tables with correct local access attachments. Only intended tenant traffic reaches the contracted endpoint after forwarding correction. Inter-VLAN IP traffic passes the approved routed gateway while original bridging remains isolated.

Question 129

A PE advertises a /16 static aggregate upstream while only a /23 of the range is assigned; unexplained traffic loops back between border devices. Which bounded conclusion is most defensible for the specific scenario?

  1. One reachable component prefix cannot certify reachability of the entire /16.
  2. The same link-local literal can refer to different peers on different links.
  3. Having two configured static routes cannot establish which is currently selected.
  4. A configured gateway address does not prove the router has a usable route to it.

Explanation

Correct Answer

A:

Route summaries require a plan for holes and exceptions to avoid forwarding loops. Validate actual component-prefix ownership and deliberate discard/exception handling for uncovered space.

Incorrect Answers

B:

Link-local IPv6 addresses require interface context because they are not globally unique. The owned /23 forwards normally while unassigned aggregate destinations terminate safely.

C:

Same-prefix static routes may be selected by preference and liveness. Normal forwarding uses ISP-A and a controlled fault withdraws it in favor of ISP-B. The owned /23 forwards normally while unassigned aggregate destinations terminate safely.

D:

Static routes are not operational until their next hops can be resolved. Route summaries require a plan for holes and exceptions to avoid forwarding loops.

Question 130

During a controlled Nokia 7750 SR review, two IS-IS Level 1 islands remain locally operational, but the intermediate Level 2 backbone is partitioned by a disabled interconnect. What should the operator do first?

  1. Confirm compatible Level 2 enablement, supported PDU formats and correct backbone link settings.
  2. Inspect level-specific databases against their proper topology scopes and route-leak policies.
  3. Inspect the attached exit capability and the Level 1 path to a permitted L1-2 border node.
  4. Repair the intended Level 2 transport adjacency and verify permitted inter-area prefix propagation.

Explanation

Correct Answer

D:

Hierarchical IS-IS relies on a working Level 2 inter-area fabric. The two areas exchange authorized remote prefixes through viable L2 paths without merging their L1 LSDBs.

Incorrect Answers

A:

Level 2 supports inter-area exchange without the same Level 1 area address. Repair the intended Level 2 transport adjacency and verify permitted inter-area prefix propagation.

B:

L1 and L2 topology information is scoped and processed separately. Each database contains the intended level's records and installed routes reflect approved inter-level reachability. Repair the intended Level 2 transport adjacency and verify permitted inter-area prefix propagation.

C:

L1 routers may use attached L1-2 routers for destinations outside their own area. Hierarchical IS-IS relies on a working Level 2 inter-area fabric.

Nokia NRS II Composite: IS-IS version (4A0-C03) Practice Tests