Question 80
A NetApp ONTAP administrator must resolve this situation: A rolling upgrade ends without confirming the second node returned to a healthy state. Which TWO choices form a defensible remediation-and-acceptance pair? (Select TWO.)
Explanation
Correct Answers
This is the proposed corrective action for: A rolling upgrade ends without confirming the second node returned to a healthy state. The action addresses the ONTAP failure mechanism: Disrupting both nodes of a serving pair or removing all host paths can interrupt data service.
This provides separate verification for the same issue: A rolling upgrade ends without confirming the second node returned to a healthy state. The outcome tests whether remediation is effective and can be recorded as acceptance evidence.
Incorrect Answers
Validate supported controller model mixing, switch ports, cluster network health and license/capacity needs before adding an HA pair. The paired controls concern nondisruptive ONTAP rolling upgrade planning, not that measure.
Precheck results contain no unresolved blockers and a post-upgrade health review confirms the expected ONTAP version. It is not the complementary risk control for nondisruptive ONTAP rolling upgrade planning.
Move supported data or workloads after cluster expansion based on observed hot nodes, aggregates and accessibility constraints. This does not supply the required nondisruptive ONTAP rolling upgrade planning action-and-control pair.