mcAfee Secure Website
exam =5
exam =6

Exam Code: NS0-165

Exam Name: NetApp Certified Data Administrator, ONTAP

Certification Provider: Network Appliance

Corresponding Certification: NCDA ONTAP

Network Appliance NS0-165 Questions & Answers

Reliable & Actual Study Materials for NS0-165 Exam Success

60 Questions & Answers with Testing Engine

"NS0-165: NetApp Certified Data Administrator, ONTAP" Testing Engine covers all the knowledge points of the real Network Appliance NS0-165 exam.

The latest actual NS0-165 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at NS0-165 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Network Appliance Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Network Appliance NS0-165 Practice Test 8

Question 70

A NetApp ONTAP administrator must resolve this situation: An administrator ignores a failed upgrade precheck warning. Select TWO: the targeted corrective action and its strongest verification. (Select TWO.)

  1. Run the supported ONTAP upgrade readiness and compatibility checks, including target version, firmware, health, capacity and cluster prerequisites.
  2. Precheck results contain no unresolved blockers and a post-upgrade health review confirms the expected ONTAP version.
  3. Plan controller-by-controller upgrade sequencing with healthy HA partners and client-path checks within the supported release upgrade path.
  4. Move supported data or workloads after cluster expansion based on observed hot nodes, aggregates and accessibility constraints.
  5. The added pair is healthy, participates in the cluster, owns intended storage and passes a service IO test.

Explanation

Correct Answers

A:

This is the proposed corrective action for: An administrator ignores a failed upgrade precheck warning. The action addresses the ONTAP failure mechanism: Starting an unsupported upgrade without readiness verification can disrupt cluster services or leave nodes on mismatched versions.

B:

This provides separate verification for the same issue: An administrator ignores a failed upgrade precheck warning. The outcome tests whether remediation is effective and can be recorded as acceptance evidence.

Incorrect Answers

C:

Plan controller-by-controller upgrade sequencing with healthy HA partners and client-path checks within the supported release upgrade path. The paired controls concern ONTAP upgrade prechecks and image validation, not that measure.

D:

Move supported data or workloads after cluster expansion based on observed hot nodes, aggregates and accessibility constraints. The ONTAP upgrade prechecks and image validation implementation and safeguard are still missing.

E:

The added pair is healthy, participates in the cluster, owns intended storage and passes a service IO test. The two-part ONTAP upgrade prechecks and image validation control remains unsatisfied.

Question 71

During a storage operations review for an enterprise disaster recovery review, the team observes: A maintenance schedule assumes a firmware prerequisite is irrelevant. The decision must maintain preservation of recoverable data under controlled change. Which change best corrects the storage design under these conditions?

  1. Validate supported controller model mixing, switch ports, cluster network health and license/capacity needs before adding an HA pair.
  2. Run the supported ONTAP upgrade readiness and compatibility checks, including target version, firmware, health, capacity and cluster prerequisites.
  3. Move supported data or workloads after cluster expansion based on observed hot nodes, aggregates and accessibility constraints.
  4. Plan controller-by-controller upgrade sequencing with healthy HA partners and client-path checks within the supported release upgrade path.

Explanation

Correct Answer

B:

This action addresses the reported ONTAP condition: A maintenance schedule assumes a firmware prerequisite is irrelevant. It specifically applies ontap upgrade prechecks and image validation and mitigates: Starting an unsupported upgrade without readiness verification can disrupt cluster services or leave nodes on mismatched versions. A practical completion check is: Precheck results contain no unresolved blockers and a post-upgrade health review confirms the expected ONTAP version.

Incorrect Answers

A:

Validate supported controller model mixing, switch ports, cluster network health and license/capacity needs before adding an HA pair. That change would not implement ONTAP upgrade prechecks and image validation.

C:

Move supported data or workloads after cluster expansion based on observed hot nodes, aggregates and accessibility constraints. The ONTAP upgrade prechecks and image validation prerequisite remains unaddressed.

D:

Plan controller-by-controller upgrade sequencing with healthy HA partners and client-path checks within the supported release upgrade path. It changes a different feature than ONTAP upgrade prechecks and image validation.

Question 72

After corrective work for the ONTAP issue 'A maintenance schedule assumes a firmware prerequisite is irrelevant', the operator seeks objective signoff. What evidence would show that the corrective configuration is working?

  1. Clients sustain representative IO and both HA nodes return to a healthy target version after staged maintenance.
  2. Post-move metrics show the intended capacity and workload distribution while NAS paths and SAN mappings remain usable.
  3. Precheck results contain no unresolved blockers and a post-upgrade health review confirms the expected ONTAP version.
  4. The added pair is healthy, participates in the cluster, owns intended storage and passes a service IO test.

Explanation

Correct Answer

C:

This is observable acceptance evidence for: A maintenance schedule assumes a firmware prerequisite is irrelevant. It demonstrates the intended ONTAP storage behavior in the relevant situation, rather than merely showing that a configuration field exists.

Incorrect Answers

A:

Clients sustain representative IO and both HA nodes return to a healthy target version after staged maintenance. Acceptance here depends on observing ONTAP upgrade prechecks and image validation, not only that test.

B:

Post-move metrics show the intended capacity and workload distribution while NAS paths and SAN mappings remain usable. It does not establish the requested ONTAP upgrade prechecks and image validation outcome.

D:

The added pair is healthy, participates in the cluster, owns intended storage and passes a service IO test. That result could pass without demonstrating ONTAP upgrade prechecks and image validation.

Question 73

During a storage operations review for a regional managed storage service provider, the team observes: A change ticket proposes rebooting both members of the same HA pair simultaneously. The decision must maintain tenant boundaries and documented service commitments. Which ONTAP administration change best addresses the observed failure?

  1. Validate supported controller model mixing, switch ports, cluster network health and license/capacity needs before adding an HA pair.
  2. Move supported data or workloads after cluster expansion based on observed hot nodes, aggregates and accessibility constraints.
  3. Run the supported ONTAP upgrade readiness and compatibility checks, including target version, firmware, health, capacity and cluster prerequisites.
  4. Plan controller-by-controller upgrade sequencing with healthy HA partners and client-path checks within the supported release upgrade path.

Explanation

Correct Answer

D:

This action addresses the reported ONTAP condition: A change ticket proposes rebooting both members of the same HA pair simultaneously. It specifically applies nondisruptive ontap rolling upgrade planning and mitigates: Disrupting both nodes of a serving pair or removing all host paths can interrupt data service. A practical completion check is: Clients sustain representative IO and both HA nodes return to a healthy target version after staged maintenance.

Incorrect Answers

A:

Validate supported controller model mixing, switch ports, cluster network health and license/capacity needs before adding an HA pair. The nondisruptive ONTAP rolling upgrade planning prerequisite remains unaddressed.

B:

Move supported data or workloads after cluster expansion based on observed hot nodes, aggregates and accessibility constraints. It changes a different feature than nondisruptive ONTAP rolling upgrade planning.

C:

Run the supported ONTAP upgrade readiness and compatibility checks, including target version, firmware, health, capacity and cluster prerequisites. That change would not implement nondisruptive ONTAP rolling upgrade planning.

Question 74

After corrective work for the ONTAP issue 'A change ticket proposes rebooting both members of the same HA pair simultaneously', the operator seeks objective signoff. Which acceptance result demonstrates that this ONTAP issue has been corrected?

  1. Clients sustain representative IO and both HA nodes return to a healthy target version after staged maintenance.
  2. The added pair is healthy, participates in the cluster, owns intended storage and passes a service IO test.
  3. Post-move metrics show the intended capacity and workload distribution while NAS paths and SAN mappings remain usable.
  4. Precheck results contain no unresolved blockers and a post-upgrade health review confirms the expected ONTAP version.

Explanation

Correct Answer

A:

This is observable acceptance evidence for: A change ticket proposes rebooting both members of the same HA pair simultaneously. It demonstrates the intended ONTAP storage behavior in the relevant situation, rather than merely showing that a configuration field exists.

Incorrect Answers

B:

The added pair is healthy, participates in the cluster, owns intended storage and passes a service IO test. That result could pass without demonstrating nondisruptive ONTAP rolling upgrade planning.

C:

Post-move metrics show the intended capacity and workload distribution while NAS paths and SAN mappings remain usable. Acceptance here depends on observing nondisruptive ONTAP rolling upgrade planning, not only that test.

D:

Precheck results contain no unresolved blockers and a post-upgrade health review confirms the expected ONTAP version. It does not establish the requested nondisruptive ONTAP rolling upgrade planning outcome.

Question 75

During a storage operations review for an enterprise disaster recovery review, the team observes: An upgrade proceeds although SAN host multipathing is untested. The decision must maintain preservation of recoverable data under controlled change. What should the storage administrator do first for the stated requirement?

  1. Move supported data or workloads after cluster expansion based on observed hot nodes, aggregates and accessibility constraints.
  2. Validate supported controller model mixing, switch ports, cluster network health and license/capacity needs before adding an HA pair.
  3. Plan controller-by-controller upgrade sequencing with healthy HA partners and client-path checks within the supported release upgrade path.
  4. Run the supported ONTAP upgrade readiness and compatibility checks, including target version, firmware, health, capacity and cluster prerequisites.

Explanation

Correct Answer

C:

This action addresses the reported ONTAP condition: An upgrade proceeds although SAN host multipathing is untested. It specifically applies nondisruptive ontap rolling upgrade planning and mitigates: Disrupting both nodes of a serving pair or removing all host paths can interrupt data service. A practical completion check is: Clients sustain representative IO and both HA nodes return to a healthy target version after staged maintenance.

Incorrect Answers

A:

Move supported data or workloads after cluster expansion based on observed hot nodes, aggregates and accessibility constraints. That change would not implement nondisruptive ONTAP rolling upgrade planning.

B:

Validate supported controller model mixing, switch ports, cluster network health and license/capacity needs before adding an HA pair. The configuration must instead establish nondisruptive ONTAP rolling upgrade planning.

D:

Run the supported ONTAP upgrade readiness and compatibility checks, including target version, firmware, health, capacity and cluster prerequisites. It changes a different feature than nondisruptive ONTAP rolling upgrade planning.

Question 76

After corrective work for the ONTAP issue 'An upgrade proceeds although SAN host multipathing is untested', the operator seeks objective signoff. What observable test should the operator require before closing this issue?

  1. Precheck results contain no unresolved blockers and a post-upgrade health review confirms the expected ONTAP version.
  2. The added pair is healthy, participates in the cluster, owns intended storage and passes a service IO test.
  3. Post-move metrics show the intended capacity and workload distribution while NAS paths and SAN mappings remain usable.
  4. Clients sustain representative IO and both HA nodes return to a healthy target version after staged maintenance.

Explanation

Correct Answer

D:

This is observable acceptance evidence for: An upgrade proceeds although SAN host multipathing is untested. It demonstrates the intended ONTAP storage behavior in the relevant situation, rather than merely showing that a configuration field exists.

Incorrect Answers

A:

Precheck results contain no unresolved blockers and a post-upgrade health review confirms the expected ONTAP version. The configuration must instead establish nondisruptive ONTAP rolling upgrade planning.

B:

The added pair is healthy, participates in the cluster, owns intended storage and passes a service IO test. The nondisruptive ONTAP rolling upgrade planning prerequisite remains unaddressed.

C:

Post-move metrics show the intended capacity and workload distribution while NAS paths and SAN mappings remain usable. It changes a different feature than nondisruptive ONTAP rolling upgrade planning.

Question 77

During a storage operations review for a regulated healthcare records provider, the team observes: An administrator schedules node maintenance without checking partner takeover readiness. The decision must maintain patient data and application recovery obligations. Which engineering choice most directly solves this problem?

  1. Plan controller-by-controller upgrade sequencing with healthy HA partners and client-path checks within the supported release upgrade path.
  2. Move supported data or workloads after cluster expansion based on observed hot nodes, aggregates and accessibility constraints.
  3. Validate supported controller model mixing, switch ports, cluster network health and license/capacity needs before adding an HA pair.
  4. Run the supported ONTAP upgrade readiness and compatibility checks, including target version, firmware, health, capacity and cluster prerequisites.

Explanation

Correct Answer

A:

This action addresses the reported ONTAP condition: An administrator schedules node maintenance without checking partner takeover readiness. It specifically applies nondisruptive ontap rolling upgrade planning and mitigates: Disrupting both nodes of a serving pair or removing all host paths can interrupt data service. A practical completion check is: Clients sustain representative IO and both HA nodes return to a healthy target version after staged maintenance.

Incorrect Answers

B:

Move supported data or workloads after cluster expansion based on observed hot nodes, aggregates and accessibility constraints. It changes a different feature than nondisruptive ONTAP rolling upgrade planning.

C:

Validate supported controller model mixing, switch ports, cluster network health and license/capacity needs before adding an HA pair. That change would not implement nondisruptive ONTAP rolling upgrade planning.

D:

Run the supported ONTAP upgrade readiness and compatibility checks, including target version, firmware, health, capacity and cluster prerequisites. The configuration must instead establish nondisruptive ONTAP rolling upgrade planning.

Question 78

A NetApp ONTAP change review identifies: An administrator schedules node maintenance without checking partner takeover readiness. Which consequence should the administrator prioritize in this situation?

  1. Disrupting both nodes of a serving pair or removing all host paths can interrupt data service.
  2. New nodes can join a cluster without delivering usable storage if ports, ownership or compatibility are unresolved.
  3. Starting an unsupported upgrade without readiness verification can disrupt cluster services or leave nodes on mismatched versions.
  4. Simply adding capacity does not relocate existing hot volumes or resolve concentrated workloads automatically.

Explanation

Correct Answer

A:

This is the directly implicated exposure when an administrator schedules node maintenance without checking partner takeover readiness. The relevant corrective control is: Plan controller-by-controller upgrade sequencing with healthy HA partners and client-path checks within the supported release upgrade path. A meaningful acceptance test is: Clients sustain representative IO and both HA nodes return to a healthy target version after staged maintenance.

Incorrect Answers

B:

New nodes can join a cluster without delivering usable storage if ports, ownership or compatibility are unresolved. That change would not implement nondisruptive ONTAP rolling upgrade planning.

C:

Starting an unsupported upgrade without readiness verification can disrupt cluster services or leave nodes on mismatched versions. The configuration must instead establish nondisruptive ONTAP rolling upgrade planning.

D:

Simply adding capacity does not relocate existing hot volumes or resolve concentrated workloads automatically. The nondisruptive ONTAP rolling upgrade planning prerequisite remains unaddressed.

Question 79

During a storage operations review for a university research storage team, the team observes: A rolling upgrade ends without confirming the second node returned to a healthy state. The decision must maintain shared-client safety and reproducible workloads. Which change best corrects the storage design under these conditions?

  1. Move supported data or workloads after cluster expansion based on observed hot nodes, aggregates and accessibility constraints.
  2. Validate supported controller model mixing, switch ports, cluster network health and license/capacity needs before adding an HA pair.
  3. Plan controller-by-controller upgrade sequencing with healthy HA partners and client-path checks within the supported release upgrade path.
  4. Run the supported ONTAP upgrade readiness and compatibility checks, including target version, firmware, health, capacity and cluster prerequisites.

Explanation

Correct Answer

C:

This action addresses the reported ONTAP condition: A rolling upgrade ends without confirming the second node returned to a healthy state. It specifically applies nondisruptive ontap rolling upgrade planning and mitigates: Disrupting both nodes of a serving pair or removing all host paths can interrupt data service. A practical completion check is: Clients sustain representative IO and both HA nodes return to a healthy target version after staged maintenance.

Incorrect Answers

A:

Move supported data or workloads after cluster expansion based on observed hot nodes, aggregates and accessibility constraints. That result could pass without demonstrating nondisruptive ONTAP rolling upgrade planning.

B:

Validate supported controller model mixing, switch ports, cluster network health and license/capacity needs before adding an HA pair. Acceptance here depends on observing nondisruptive ONTAP rolling upgrade planning, not only that test.

D:

Run the supported ONTAP upgrade readiness and compatibility checks, including target version, firmware, health, capacity and cluster prerequisites. The relevant success criterion is nondisruptive ONTAP rolling upgrade planning; this measures a different function.

Question 80

A NetApp ONTAP administrator must resolve this situation: A rolling upgrade ends without confirming the second node returned to a healthy state. Which TWO choices form a defensible remediation-and-acceptance pair? (Select TWO.)

  1. Validate supported controller model mixing, switch ports, cluster network health and license/capacity needs before adding an HA pair.
  2. Plan controller-by-controller upgrade sequencing with healthy HA partners and client-path checks within the supported release upgrade path.
  3. Precheck results contain no unresolved blockers and a post-upgrade health review confirms the expected ONTAP version.
  4. Move supported data or workloads after cluster expansion based on observed hot nodes, aggregates and accessibility constraints.
  5. Clients sustain representative IO and both HA nodes return to a healthy target version after staged maintenance.

Explanation

Correct Answers

B:

This is the proposed corrective action for: A rolling upgrade ends without confirming the second node returned to a healthy state. The action addresses the ONTAP failure mechanism: Disrupting both nodes of a serving pair or removing all host paths can interrupt data service.

E:

This provides separate verification for the same issue: A rolling upgrade ends without confirming the second node returned to a healthy state. The outcome tests whether remediation is effective and can be recorded as acceptance evidence.

Incorrect Answers

A:

Validate supported controller model mixing, switch ports, cluster network health and license/capacity needs before adding an HA pair. The paired controls concern nondisruptive ONTAP rolling upgrade planning, not that measure.

C:

Precheck results contain no unresolved blockers and a post-upgrade health review confirms the expected ONTAP version. It is not the complementary risk control for nondisruptive ONTAP rolling upgrade planning.

D:

Move supported data or workloads after cluster expansion based on observed hot nodes, aggregates and accessibility constraints. This does not supply the required nondisruptive ONTAP rolling upgrade planning action-and-control pair.

NetApp Certified Data Administrator, ONTAP (NS0-165) Practice Tests