mcAfee Secure Website
23

Microsoft AZ-801 Bundle

Exam Code: AZ-801

Exam Name Configuring Windows Server Hybrid Advanced Services

Certification Provider: Microsoft

Corresponding Certification: Microsoft Certified: Windows Server Hybrid Administrator Associate

AZ-801 Training Materials $25.00

Reliable & Actual Study Materials for AZ-801 Exam Success

The Latest AZ-801 Exam Questions as Experienced in the Actual Test!

  • 24
    Questions & Answers

    AZ-801 Questions & Answers

    326 Questions & Answers

    Includes questions types found on actual exam such as drag and drop, simulation, type in, and fill in the blank.

  • 25
    AZ-801 Video Course

    AZ-801 Training Course

    122 Video Lectures

    Based on Real Life Scenarios which you will encounter in exam and learn by working with real equipment.

exam =32

Configuring Windows Server Hybrid Advanced Services (AZ-801) Practice Tests

Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Microsoft Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Total Cost: $164.98
Bundle Price: $139.98

Purchase Individually

  • exam =34
    Questions & Answers

    Questions & Answers

    326 Questions

    $124.99
    exam =35
  • exam =37
    AZ-801 Video Course

    Training Course

    122 Video Lectures

    $39.99

Microsoft AZ-801 Practice Test 61

Question 600

An AZ-801 historical administration case reports: An application migrates successfully but its VM boots with an invalid network configuration in Azure. Which TWO choices provide the technical correction and a supporting acceptance test? (Select TWO.)

  1. Configure the supported Azure Migrate replication pipeline, network settings and nondisruptive test migration before production cutover.
  2. A test migrated server boots in its isolated target, passes application checks and shows acceptable replication lag.
  3. The migration window records one active system of record, healthy service checks and a verified return path if acceptance fails.
  4. Deploy and authorize the supported Azure Migrate appliance for target VMware, Hyper-V or physical servers and validate discovered machine inventory.
  5. Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone.

Explanation

Correct Answers

A:

For An application migrates successfully but its VM boots with an invalid network configuration in Azure, this action is the relevant response: Configure the supported Azure Migrate replication pipeline, network settings and nondisruptive test migration before production cutover. It reduces the risk that a migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime.

B:

This is an independent validation for the condition An application migrates successfully but its VM boots with an invalid network configuration in Azure. The expected result is: A test migrated server boots in its isolated target, passes application checks and shows acceptable replication lag.

Incorrect Answers

C:

Post-migration azure vm cutover and rollback: Leaving source and destination active under shared identity can split business writes or create confusing client paths. Here the decisive check is Azure migrate server replication and test migration, not that separate capability.

D:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. The observed issue still requires Azure migrate server replication and test migration; the proposed alternative tests another control.

E:

Azure migrate right-sizing and migration assessments: Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. Without demonstrating Azure migrate server replication and test migration, that option does not satisfy the requested outcome.

Question 601

An enterprise Windows Server hybrid administration team finds: A migrated server is powered on while the source VM still accepts customer transactions. The team must preserve authorized operations and recoverability while meeting the documented service constraints. What is the most defensible remediation for the observed failure?

  1. Deploy and authorize the supported Azure Migrate appliance for target VMware, Hyper-V or physical servers and validate discovered machine inventory.
  2. Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan.
  3. Configure the supported Azure Migrate replication pipeline, network settings and nondisruptive test migration before production cutover.
  4. Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone.

Explanation

Correct Answer

B:

The distinctive observation is: A migrated server is powered on while the source VM still accepts customer transactions. The appropriate intervention is: Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan. This addresses the specific danger: Leaving source and destination active under shared identity can split business writes or create confusing client paths. Validate closure with: The migration window records one active system of record, healthy service checks and a verified return path if acceptance fails.

Incorrect Answers

A:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. That mechanism alone cannot establish Post-migration azure vm cutover and rollback for this question.

C:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. Here the decisive check is Post-migration azure vm cutover and rollback, not that separate capability.

D:

Azure migrate right-sizing and migration assessments: Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. The observed issue still requires Post-migration azure vm cutover and rollback; the proposed alternative tests another control.

Question 602

The recovery/security observation is: A migrated server is powered on while the source VM still accepts customer transactions. Which verification observation is most relevant for this fault?

  1. A signed assessment maps each application to a supported Azure VM and disk selection with tested dependencies and approved cost.
  2. The migration window records one active system of record, healthy service checks and a verified return path if acceptance fails.
  3. A test migrated server boots in its isolated target, passes application checks and shows acceptable replication lag.
  4. The discovery inventory includes all target machines, basic sizing attributes and monitored application or dependency evidence.

Explanation

Correct Answer

B:

The separate check for the condition A migrated server is powered on while the source VM still accepts customer transactions is: The migration window records one active system of record, healthy service checks and a verified return path if acceptance fails. It validates the control to cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan. It verifies an operational result rather than a configuration entry alone.

Incorrect Answers

A:

Azure migrate right-sizing and migration assessments: Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. That mechanism alone cannot establish Post-migration azure vm cutover and rollback for this question.

C:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. Here the decisive check is Post-migration azure vm cutover and rollback, not that separate capability.

D:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. The observed issue still requires Post-migration azure vm cutover and rollback; the proposed alternative tests another control.

Question 603

An enterprise Windows Server hybrid administration team finds: After Azure cutover, clients continue resolving the old on-premises IP due to stale DNS caching. The team must preserve authorized operations and recoverability while meeting the documented service constraints. Which supported administrative change best addresses this condition?

  1. Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan.
  2. Deploy and authorize the supported Azure Migrate appliance for target VMware, Hyper-V or physical servers and validate discovered machine inventory.
  3. Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone.
  4. Configure the supported Azure Migrate replication pipeline, network settings and nondisruptive test migration before production cutover.

Explanation

Correct Answer

A:

The distinctive observation is: After Azure cutover, clients continue resolving the old on-premises IP due to stale DNS caching. The appropriate intervention is: Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan. This addresses the specific danger: Leaving source and destination active under shared identity can split business writes or create confusing client paths. Validate closure with: The migration window records one active system of record, healthy service checks and a verified return path if acceptance fails.

Incorrect Answers

B:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. That may be useful independently, but the missing requirement here is Post-migration azure vm cutover and rollback.

C:

Azure migrate right-sizing and migration assessments: Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. Here the decisive check is Post-migration azure vm cutover and rollback, not that separate capability.

D:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. The observed issue still requires Post-migration azure vm cutover and rollback; the proposed alternative tests another control.

Question 604

The legacy Windows Server administration finding is: After Azure cutover, clients continue resolving the old on-premises IP due to stale DNS caching. What specific exposure does the condition create?

  1. A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime.
  2. Leaving source and destination active under shared identity can split business writes or create confusing client paths.
  3. Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations.
  4. Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads.

Explanation

Correct Answer

B:

The issue is: After Azure cutover, clients continue resolving the old on-premises IP due to stale DNS caching. The material risk is that leaving source and destination active under shared identity can split business writes or create confusing client paths. The corrective control is to cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan. Confirm through: The migration window records one active system of record, healthy service checks and a verified return path if acceptance fails.

Incorrect Answers

A:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. That mechanism alone cannot establish Post-migration azure vm cutover and rollback for this question.

C:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. Here the decisive check is Post-migration azure vm cutover and rollback, not that separate capability.

D:

Azure migrate right-sizing and migration assessments: Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. The observed issue still requires Post-migration azure vm cutover and rollback; the proposed alternative tests another control.

Question 605

An enterprise Windows Server hybrid administration team finds: A business owner declares migration successful based only on Azure VM power state. The team must preserve authorized operations and recoverability while meeting the documented service constraints. Which intervention should the team prioritize under these constraints?

  1. Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan.
  2. Configure the supported Azure Migrate replication pipeline, network settings and nondisruptive test migration before production cutover.
  3. Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone.
  4. Deploy and authorize the supported Azure Migrate appliance for target VMware, Hyper-V or physical servers and validate discovered machine inventory.

Explanation

Correct Answer

A:

The distinctive observation is: A business owner declares migration successful based only on Azure VM power state. The appropriate intervention is: Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan. This addresses the specific danger: Leaving source and destination active under shared identity can split business writes or create confusing client paths. Validate closure with: The migration window records one active system of record, healthy service checks and a verified return path if acceptance fails.

Incorrect Answers

B:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. That may be useful independently, but the missing requirement here is Post-migration azure vm cutover and rollback.

C:

Azure migrate right-sizing and migration assessments: Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. Here the decisive check is Post-migration azure vm cutover and rollback, not that separate capability.

D:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. The observed issue still requires Post-migration azure vm cutover and rollback; the proposed alternative tests another control.

Question 606

The recovery/security observation is: A business owner declares migration successful based only on Azure VM power state. Which verification observation is most relevant for this fault?

  1. The discovery inventory includes all target machines, basic sizing attributes and monitored application or dependency evidence.
  2. A signed assessment maps each application to a supported Azure VM and disk selection with tested dependencies and approved cost.
  3. A test migrated server boots in its isolated target, passes application checks and shows acceptable replication lag.
  4. The migration window records one active system of record, healthy service checks and a verified return path if acceptance fails.

Explanation

Correct Answer

D:

The separate check for the condition A business owner declares migration successful based only on Azure VM power state is: The migration window records one active system of record, healthy service checks and a verified return path if acceptance fails. It validates the control to cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan. It verifies an operational result rather than a configuration entry alone.

Incorrect Answers

A:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. That mechanism alone cannot establish Post-migration azure vm cutover and rollback for this question.

B:

Azure migrate right-sizing and migration assessments: Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. That may be useful independently, but the missing requirement here is Post-migration azure vm cutover and rollback.

C:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. Here the decisive check is Post-migration azure vm cutover and rollback, not that separate capability.

Question 607

An enterprise Windows Server hybrid administration team finds: An unplanned rollback reactivates the source without reconciling transactions written to Azure. The team must preserve authorized operations and recoverability while meeting the documented service constraints. What is the strongest supported way to correct this operational weakness?

  1. Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan.
  2. Deploy and authorize the supported Azure Migrate appliance for target VMware, Hyper-V or physical servers and validate discovered machine inventory.
  3. Configure the supported Azure Migrate replication pipeline, network settings and nondisruptive test migration before production cutover.
  4. Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone.

Explanation

Correct Answer

A:

The distinctive observation is: An unplanned rollback reactivates the source without reconciling transactions written to Azure. The appropriate intervention is: Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan. This addresses the specific danger: Leaving source and destination active under shared identity can split business writes or create confusing client paths. Validate closure with: The migration window records one active system of record, healthy service checks and a verified return path if acceptance fails.

Incorrect Answers

B:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. That may be useful independently, but the missing requirement here is Post-migration azure vm cutover and rollback.

C:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. Here the decisive check is Post-migration azure vm cutover and rollback, not that separate capability.

D:

Azure migrate right-sizing and migration assessments: Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. The observed issue still requires Post-migration azure vm cutover and rollback; the proposed alternative tests another control.

Question 608

The legacy Windows Server administration finding is: An unplanned rollback reactivates the source without reconciling transactions written to Azure. What specific exposure does the condition create?

  1. Leaving source and destination active under shared identity can split business writes or create confusing client paths.
  2. Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations.
  3. Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads.
  4. A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime.

Explanation

Correct Answer

A:

The issue is: An unplanned rollback reactivates the source without reconciling transactions written to Azure. The material risk is that leaving source and destination active under shared identity can split business writes or create confusing client paths. The corrective control is to cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan. Confirm through: The migration window records one active system of record, healthy service checks and a verified return path if acceptance fails.

Incorrect Answers

B:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. That may be useful independently, but the missing requirement here is Post-migration azure vm cutover and rollback.

C:

Azure migrate right-sizing and migration assessments: Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. Here the decisive check is Post-migration azure vm cutover and rollback, not that separate capability.

D:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. The observed issue still requires Post-migration azure vm cutover and rollback; the proposed alternative tests another control.

Question 609

An enterprise Windows Server hybrid administration team finds: A migrated VM cannot reach on-premises authentication services because a route is missing. The team must preserve authorized operations and recoverability while meeting the documented service constraints. Which corrective control best meets the stated recovery and security requirements?

  1. Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan.
  2. Deploy and authorize the supported Azure Migrate appliance for target VMware, Hyper-V or physical servers and validate discovered machine inventory.
  3. Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone.
  4. Configure the supported Azure Migrate replication pipeline, network settings and nondisruptive test migration before production cutover.

Explanation

Correct Answer

A:

The distinctive observation is: A migrated VM cannot reach on-premises authentication services because a route is missing. The appropriate intervention is: Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan. This addresses the specific danger: Leaving source and destination active under shared identity can split business writes or create confusing client paths. Validate closure with: The migration window records one active system of record, healthy service checks and a verified return path if acceptance fails.

Incorrect Answers

B:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. That may be useful independently, but the missing requirement here is Post-migration azure vm cutover and rollback.

C:

Azure migrate right-sizing and migration assessments: Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. Here the decisive check is Post-migration azure vm cutover and rollback, not that separate capability.

D:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. The observed issue still requires Post-migration azure vm cutover and rollback; the proposed alternative tests another control.

Question 610

An AZ-801 historical administration case reports: A migrated VM cannot reach on-premises authentication services because a route is missing. Which TWO options together describe an appropriate response and a distinct verification? (Select TWO.)

  1. Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan.
  2. Deploy and authorize the supported Azure Migrate appliance for target VMware, Hyper-V or physical servers and validate discovered machine inventory.
  3. Configure the supported Azure Migrate replication pipeline, network settings and nondisruptive test migration before production cutover.
  4. The migration window records one active system of record, healthy service checks and a verified return path if acceptance fails.
  5. A signed assessment maps each application to a supported Azure VM and disk selection with tested dependencies and approved cost.

Explanation

Correct Answers

A:

For A migrated VM cannot reach on-premises authentication services because a route is missing, this action is the relevant response: Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan. It reduces the risk that leaving source and destination active under shared identity can split business writes or create confusing client paths.

D:

This is an independent validation for the condition A migrated VM cannot reach on-premises authentication services because a route is missing. The expected result is: The migration window records one active system of record, healthy service checks and a verified return path if acceptance fails.

Incorrect Answers

B:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. That may be useful independently, but the missing requirement here is Post-migration azure vm cutover and rollback.

C:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. Here the decisive check is Post-migration azure vm cutover and rollback, not that separate capability.

E:

Azure migrate right-sizing and migration assessments: Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. Without demonstrating Post-migration azure vm cutover and rollback, that option does not satisfy the requested outcome.