mcAfee Secure Website
23

Microsoft AZ-801 Bundle

Exam Code: AZ-801

Exam Name Configuring Windows Server Hybrid Advanced Services

Certification Provider: Microsoft

Corresponding Certification: Microsoft Certified: Windows Server Hybrid Administrator Associate

AZ-801 Training Materials $25.00

Reliable & Actual Study Materials for AZ-801 Exam Success

The Latest AZ-801 Exam Questions as Experienced in the Actual Test!

  • 24
    Questions & Answers

    AZ-801 Questions & Answers

    326 Questions & Answers

    Includes questions types found on actual exam such as drag and drop, simulation, type in, and fill in the blank.

  • 25
    AZ-801 Video Course

    AZ-801 Training Course

    122 Video Lectures

    Based on Real Life Scenarios which you will encounter in exam and learn by working with real equipment.

exam =32

Configuring Windows Server Hybrid Advanced Services (AZ-801) Practice Tests

Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Microsoft Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Total Cost: $164.98
Bundle Price: $139.98

Purchase Individually

  • exam =34
    Questions & Answers

    Questions & Answers

    326 Questions

    $124.99
    exam =35
  • exam =37
    AZ-801 Video Course

    Training Course

    122 Video Lectures

    $39.99

Microsoft AZ-801 Practice Test 59

Question 580

An AZ-801 historical administration case reports: A discovery assessment has stale host utilization because data collection stopped a month ago. Which TWO choices provide the technical correction and a supporting acceptance test? (Select TWO.)

  1. The migration window records one active system of record, healthy service checks and a verified return path if acceptance fails.
  2. Deploy and authorize the supported Azure Migrate appliance for target VMware, Hyper-V or physical servers and validate discovered machine inventory.
  3. The discovery inventory includes all target machines, basic sizing attributes and monitored application or dependency evidence.
  4. Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone.
  5. Configure the supported Azure Migrate replication pipeline, network settings and nondisruptive test migration before production cutover.

Explanation

Correct Answers

B:

For A discovery assessment has stale host utilization because data collection stopped a month ago, this action is the relevant response: Deploy and authorize the supported Azure Migrate appliance for target VMware, Hyper-V or physical servers and validate discovered machine inventory. It reduces the risk that incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations.

C:

This is an independent validation for the condition A discovery assessment has stale host utilization because data collection stopped a month ago. The expected result is: The discovery inventory includes all target machines, basic sizing attributes and monitored application or dependency evidence.

Incorrect Answers

A:

Post-migration azure vm cutover and rollback: Leaving source and destination active under shared identity can split business writes or create confusing client paths. That mechanism alone cannot establish Azure migrate appliance discovery and inventory for this question.

D:

Azure migrate right-sizing and migration assessments: Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. The observed issue still requires Azure migrate appliance discovery and inventory; the proposed alternative tests another control.

E:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. Without demonstrating Azure migrate appliance discovery and inventory, that option does not satisfy the requested outcome.

Question 581

An enterprise Windows Server hybrid administration team finds: A high-IOPS database server is mapped to a low-tier Azure disk solely by capacity. The team must preserve authorized operations and recoverability while meeting the documented service constraints. What is the most defensible remediation for the observed failure?

  1. Configure the supported Azure Migrate replication pipeline, network settings and nondisruptive test migration before production cutover.
  2. Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone.
  3. Deploy and authorize the supported Azure Migrate appliance for target VMware, Hyper-V or physical servers and validate discovered machine inventory.
  4. Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan.

Explanation

Correct Answer

B:

The distinctive observation is: A high-IOPS database server is mapped to a low-tier Azure disk solely by capacity. The appropriate intervention is: Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone. This addresses the specific danger: Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. Validate closure with: A signed assessment maps each application to a supported Azure VM and disk selection with tested dependencies and approved cost.

Incorrect Answers

A:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. That mechanism alone cannot establish Azure migrate right-sizing and migration assessments for this question.

C:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. Here the decisive check is Azure migrate right-sizing and migration assessments, not that separate capability.

D:

Post-migration azure vm cutover and rollback: Leaving source and destination active under shared identity can split business writes or create confusing client paths. The observed issue still requires Azure migrate right-sizing and migration assessments; the proposed alternative tests another control.

Question 582

The recovery/security observation is: A high-IOPS database server is mapped to a low-tier Azure disk solely by capacity. What independent result establishes the change worked?

  1. A signed assessment maps each application to a supported Azure VM and disk selection with tested dependencies and approved cost.
  2. The migration window records one active system of record, healthy service checks and a verified return path if acceptance fails.
  3. The discovery inventory includes all target machines, basic sizing attributes and monitored application or dependency evidence.
  4. A test migrated server boots in its isolated target, passes application checks and shows acceptable replication lag.

Explanation

Correct Answer

A:

The separate check for the condition A high-IOPS database server is mapped to a low-tier Azure disk solely by capacity is: A signed assessment maps each application to a supported Azure VM and disk selection with tested dependencies and approved cost. It validates the control to assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone. It verifies an operational result rather than a configuration entry alone.

Incorrect Answers

B:

Post-migration azure vm cutover and rollback: Leaving source and destination active under shared identity can split business writes or create confusing client paths. That may be useful independently, but the missing requirement here is Azure migrate right-sizing and migration assessments.

C:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. Here the decisive check is Azure migrate right-sizing and migration assessments, not that separate capability.

D:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. The observed issue still requires Azure migrate right-sizing and migration assessments; the proposed alternative tests another control.

Question 583

An enterprise Windows Server hybrid administration team finds: A VM migration estimate uses the source vCPU count without considering actual utilization trends. The team must preserve authorized operations and recoverability while meeting the documented service constraints. Which supported administrative change best addresses this condition?

  1. Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan.
  2. Deploy and authorize the supported Azure Migrate appliance for target VMware, Hyper-V or physical servers and validate discovered machine inventory.
  3. Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone.
  4. Configure the supported Azure Migrate replication pipeline, network settings and nondisruptive test migration before production cutover.

Explanation

Correct Answer

C:

The distinctive observation is: A VM migration estimate uses the source vCPU count without considering actual utilization trends. The appropriate intervention is: Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone. This addresses the specific danger: Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. Validate closure with: A signed assessment maps each application to a supported Azure VM and disk selection with tested dependencies and approved cost.

Incorrect Answers

A:

Post-migration azure vm cutover and rollback: Leaving source and destination active under shared identity can split business writes or create confusing client paths. That mechanism alone cannot establish Azure migrate right-sizing and migration assessments for this question.

B:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. That may be useful independently, but the missing requirement here is Azure migrate right-sizing and migration assessments.

D:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. The observed issue still requires Azure migrate right-sizing and migration assessments; the proposed alternative tests another control.

Question 584

The legacy Windows Server administration finding is: A VM migration estimate uses the source vCPU count without considering actual utilization trends. Why is the observed configuration unacceptable?

  1. Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations.
  2. Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads.
  3. Leaving source and destination active under shared identity can split business writes or create confusing client paths.
  4. A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime.

Explanation

Correct Answer

B:

The issue is: A VM migration estimate uses the source vCPU count without considering actual utilization trends. The material risk is that lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. The corrective control is to assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone. Confirm through: A signed assessment maps each application to a supported Azure VM and disk selection with tested dependencies and approved cost.

Incorrect Answers

A:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. That mechanism alone cannot establish Azure migrate right-sizing and migration assessments for this question.

C:

Post-migration azure vm cutover and rollback: Leaving source and destination active under shared identity can split business writes or create confusing client paths. Here the decisive check is Azure migrate right-sizing and migration assessments, not that separate capability.

D:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. The observed issue still requires Azure migrate right-sizing and migration assessments; the proposed alternative tests another control.

Question 585

An enterprise Windows Server hybrid administration team finds: An unsupported operating system version is approved for cloud migration with no remediation plan. The team must preserve authorized operations and recoverability while meeting the documented service constraints. Which intervention should the team prioritize under these constraints?

  1. Deploy and authorize the supported Azure Migrate appliance for target VMware, Hyper-V or physical servers and validate discovered machine inventory.
  2. Configure the supported Azure Migrate replication pipeline, network settings and nondisruptive test migration before production cutover.
  3. Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan.
  4. Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone.

Explanation

Correct Answer

D:

The distinctive observation is: An unsupported operating system version is approved for cloud migration with no remediation plan. The appropriate intervention is: Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone. This addresses the specific danger: Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. Validate closure with: A signed assessment maps each application to a supported Azure VM and disk selection with tested dependencies and approved cost.

Incorrect Answers

A:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. That mechanism alone cannot establish Azure migrate right-sizing and migration assessments for this question.

B:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. That may be useful independently, but the missing requirement here is Azure migrate right-sizing and migration assessments.

C:

Post-migration azure vm cutover and rollback: Leaving source and destination active under shared identity can split business writes or create confusing client paths. Here the decisive check is Azure migrate right-sizing and migration assessments, not that separate capability.

Question 586

The recovery/security observation is: An unsupported operating system version is approved for cloud migration with no remediation plan. What independent result establishes the change worked?

  1. A signed assessment maps each application to a supported Azure VM and disk selection with tested dependencies and approved cost.
  2. The migration window records one active system of record, healthy service checks and a verified return path if acceptance fails.
  3. The discovery inventory includes all target machines, basic sizing attributes and monitored application or dependency evidence.
  4. A test migrated server boots in its isolated target, passes application checks and shows acceptable replication lag.

Explanation

Correct Answer

A:

The separate check for the condition An unsupported operating system version is approved for cloud migration with no remediation plan is: A signed assessment maps each application to a supported Azure VM and disk selection with tested dependencies and approved cost. It validates the control to assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone. It verifies an operational result rather than a configuration entry alone.

Incorrect Answers

B:

Post-migration azure vm cutover and rollback: Leaving source and destination active under shared identity can split business writes or create confusing client paths. That may be useful independently, but the missing requirement here is Azure migrate right-sizing and migration assessments.

C:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. Here the decisive check is Azure migrate right-sizing and migration assessments, not that separate capability.

D:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. The observed issue still requires Azure migrate right-sizing and migration assessments; the proposed alternative tests another control.

Question 587

An enterprise Windows Server hybrid administration team finds: Application hosts are migrated before their required licensing and network dependencies are identified. The team must preserve authorized operations and recoverability while meeting the documented service constraints. What is the strongest supported way to correct this operational weakness?

  1. Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan.
  2. Deploy and authorize the supported Azure Migrate appliance for target VMware, Hyper-V or physical servers and validate discovered machine inventory.
  3. Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone.
  4. Configure the supported Azure Migrate replication pipeline, network settings and nondisruptive test migration before production cutover.

Explanation

Correct Answer

C:

The distinctive observation is: Application hosts are migrated before their required licensing and network dependencies are identified. The appropriate intervention is: Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone. This addresses the specific danger: Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. Validate closure with: A signed assessment maps each application to a supported Azure VM and disk selection with tested dependencies and approved cost.

Incorrect Answers

A:

Post-migration azure vm cutover and rollback: Leaving source and destination active under shared identity can split business writes or create confusing client paths. That mechanism alone cannot establish Azure migrate right-sizing and migration assessments for this question.

B:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. That may be useful independently, but the missing requirement here is Azure migrate right-sizing and migration assessments.

D:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. The observed issue still requires Azure migrate right-sizing and migration assessments; the proposed alternative tests another control.

Question 588

The legacy Windows Server administration finding is: Application hosts are migrated before their required licensing and network dependencies are identified. Why is the observed configuration unacceptable?

  1. A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime.
  2. Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads.
  3. Leaving source and destination active under shared identity can split business writes or create confusing client paths.
  4. Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations.

Explanation

Correct Answer

B:

The issue is: Application hosts are migrated before their required licensing and network dependencies are identified. The material risk is that lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. The corrective control is to assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone. Confirm through: A signed assessment maps each application to a supported Azure VM and disk selection with tested dependencies and approved cost.

Incorrect Answers

A:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. That mechanism alone cannot establish Azure migrate right-sizing and migration assessments for this question.

C:

Post-migration azure vm cutover and rollback: Leaving source and destination active under shared identity can split business writes or create confusing client paths. Here the decisive check is Azure migrate right-sizing and migration assessments, not that separate capability.

D:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. The observed issue still requires Azure migrate right-sizing and migration assessments; the proposed alternative tests another control.

Question 589

An enterprise Windows Server hybrid administration team finds: A business-critical app receives a VM size that is unavailable in its target Azure region. The team must preserve authorized operations and recoverability while meeting the documented service constraints. Which corrective control best meets the stated recovery and security requirements?

  1. Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone.
  2. Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan.
  3. Deploy and authorize the supported Azure Migrate appliance for target VMware, Hyper-V or physical servers and validate discovered machine inventory.
  4. Configure the supported Azure Migrate replication pipeline, network settings and nondisruptive test migration before production cutover.

Explanation

Correct Answer

A:

The distinctive observation is: A business-critical app receives a VM size that is unavailable in its target Azure region. The appropriate intervention is: Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone. This addresses the specific danger: Lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads. Validate closure with: A signed assessment maps each application to a supported Azure VM and disk selection with tested dependencies and approved cost.

Incorrect Answers

B:

Post-migration azure vm cutover and rollback: Leaving source and destination active under shared identity can split business writes or create confusing client paths. That may be useful independently, but the missing requirement here is Azure migrate right-sizing and migration assessments.

C:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. Here the decisive check is Azure migrate right-sizing and migration assessments, not that separate capability.

D:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. The observed issue still requires Azure migrate right-sizing and migration assessments; the proposed alternative tests another control.

Question 590

An AZ-801 historical administration case reports: A business-critical app receives a VM size that is unavailable in its target Azure region. Which TWO options together describe an appropriate response and a distinct verification? (Select TWO.)

  1. Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone.
  2. A test migrated server boots in its isolated target, passes application checks and shows acceptable replication lag.
  3. Deploy and authorize the supported Azure Migrate appliance for target VMware, Hyper-V or physical servers and validate discovered machine inventory.
  4. Cut over Azure Migrate workloads using authoritative shutdown, DNS and client routing changes, with application signoff and a validated rollback plan.
  5. A signed assessment maps each application to a supported Azure VM and disk selection with tested dependencies and approved cost.

Explanation

Correct Answers

A:

For A business-critical app receives a VM size that is unavailable in its target Azure region, this action is the relevant response: Assess Azure VM SKU, operating system support, storage throughput, dependency mapping, cost and readiness before choosing a migration landing zone. It reduces the risk that lift-and-shift without capacity and compatibility assessment can increase cost or create unsupported and slow workloads.

E:

This is an independent validation for the condition A business-critical app receives a VM size that is unavailable in its target Azure region. The expected result is: A signed assessment maps each application to a supported Azure VM and disk selection with tested dependencies and approved cost.

Incorrect Answers

B:

Azure migrate server replication and test migration: A migration started with unhealthy replication or untested IP and identity assumptions can create excessive downtime. That may be useful independently, but the missing requirement here is Azure migrate right-sizing and migration assessments.

C:

Azure migrate appliance discovery and inventory: Incomplete discovery or insufficient appliance permissions can hide dependencies and produce unreliable migration recommendations. Here the decisive check is Azure migrate right-sizing and migration assessments, not that separate capability.

D:

Post-migration azure vm cutover and rollback: Leaving source and destination active under shared identity can split business writes or create confusing client paths. The observed issue still requires Azure migrate right-sizing and migration assessments; the proposed alternative tests another control.