Question 60
A data center team adds a leaf switch but the new node cannot reach any spine loopback addresses although local links are up. Which controlled change best addresses the described requirement?
Explanation
Correct Answer
This action addresses the stated defect: repair the routed underlay addressing or protocol configuration and then validate overlay sessions. The underlying constraint is that an IP fabric requires valid routed underlay adjacency and reachability before an EVPN-VXLAN overlay can operate correctly. Verify rather than assume success: observe established underlay peers and reachability of every intended VTEP loopback before testing virtual networks.
Incorrect Answers
The option “Advertise the approved VTEP loopbacks through the fabric underlay and check next-hop reachability” is useful in a different setting: An engineer brings up BGP peers to the spines but omits export of the overlay endpoint loopbacks. The case being tested is: A data center team adds a leaf switch but the new node cannot reach any spine loopback addresses although local links are up. Repair the routed underlay addressing or protocol configuration and then validate overlay sessions. The most relevant correction is “Repair the routed underlay addressing or protocol configuration and then validate overlay sessions”.
“Use validated spine-leaf cabling and routing relationships rather than ad hoc lateral transit links” is relevant to a different condition: A team designs a three-stage leaf-spine fabric but wants to connect leaf switches to one another for ordinary transit. The stated question instead concerns: A data center team adds a leaf switch but the new node cannot reach any spine loopback addresses although local links are up. Repair the routed underlay addressing or protocol configuration and then validate overlay sessions. The most relevant correction is “Repair the routed underlay addressing or protocol configuration and then validate overlay sessions”.
“Correct underlay failure detection and routing convergence within the approved topology and timer policy” is associated with a distinct issue: A two-spine fabric can tolerate one path failure but the application sees blackholing for several minutes after a spine uplink drops. By contrast, the actual problem is: A data center team adds a leaf switch but the new node cannot reach any spine loopback addresses although local links are up. Repair the routed underlay addressing or protocol configuration and then validate overlay sessions. The most relevant correction is “Repair the routed underlay addressing or protocol configuration and then validate overlay sessions”.