Question 640
For a proposed HPE Aruba Networking campus access design, the customer reports: A resiliency review discovers both network uplinks cross the same basement conduit. Which acceptance result would best verify that the architect's response addresses this requirement?
Explanation
Correct Answer
The result is linked to the customer's requirement. A logical dual path offers limited protection when physical dependencies are shared. Confirming updated route drawings or a risk signature resolve the conduit exposure. validates the intended design.
Incorrect Answers
The success signal corresponds to A new WLAN capability assumes all laptops support 6 GHz, but the help desk disputes that assumption.; its appearance alone would not validate the change driven by a logical dual path offers limited protection when physical dependencies are shared..
It provides evidence for another campus need—A project manager treats a conditional review acceptance as unconditional permission to buy all hardware.—but does not establish that the stated concern has been resolved: a logical dual path offers limited protection when physical dependencies are shared..
This alternative addresses the separate case “A design review generates 12 changes but the team has no record of which revision was approved”. The final release clearly links changes and approvals to one signed revision. The deciding requirement here is “Updated route drawings or a risk signature resolve the conduit exposure”.