Question 630
For a proposed HPE Aruba Networking campus access design, the customer reports: A plant has no spare cable pathway between outbuildings and requires a temporary link. Which acceptance result would best verify that the architect's response addresses this requirement?
Explanation
Correct Answer
A field-tested link meets the required throughput and outage tolerance before adoption. specifically demonstrates that the recommended intervention works. A wireless backhaul may solve a cabling constraint but needs surveyed path and reliability evidence. The associated design action is Assess a line-of-sight wireless bridge design against bandwidth, availability, and weather constraints.
Incorrect Answers
This option serves the scenario “Two campuses are separated by kilometers and a proposed copper interconnect exceeds channel reach”. A documented optical budget and end-to-end link test meet the distance requirement. The present scenario is distinguished by “A field-tested link meets the required throughput and outage tolerance before adoption”.
Evidence of the cited kind belongs to A regional campus manually places guests and employees on flat networks with wide reachability.. The current test should instead verify that assess a line-of-sight wireless bridge design against bandwidth, availability, and weather constraints..
That finding may be relevant to A university cannot retire old 5 GHz scanners while it introduces modern 6 GHz-capable laptops.; it does not validate this scenario's key constraint: a wireless backhaul may solve a cabling constraint but needs surveyed path and reliability evidence..