Question 590
At Tideview Plastics, external contractors need scheduled engineering access while emergency vendor credentials are shared. The relevant endpoint is injection moulding cell J-04; a redundant path must remain available during controlled link-failure testing. The operations owner is preparing the handoff for the change at injection moulding cell J-04. Which record best supports continued safe operation and independent audit?
Explanation
Correct Answer
The handoff ties design, observed evidence, accountability and recovery to the specific controller. Engineering privileges are high impact; identity, duration and destination restrictions preserve accountability for PLC changes. Later engineers can reproduce or safely reverse the decision.
Incorrect Answers
A global success claim conceals asset-level conditions and residual OT risk. The accepted design and verification need to remain traceable: Place remote administration behind a controlled access zone using named identities, MFA and approved maintenance windows. Verify a named technician can reach only the approved engineering workstation within a recorded maintenance window.
Shared secrets destroy accountability and create additional credential exposure. The site must retain least-privileged named access and a tested change record.
A name alone cannot reconstruct which behavior was tested, which owner approved it, or what rollback means. Evidence required: Verify a named technician can reach only the approved engineering workstation within a recorded maintenance window.