Question 210
An operations team investigates this FortiSwitch 7.6 situation: A 25Gb access uplink reports module alarms because the selected optics differ from supported combinations. Select TWO complementary measures: the corrective action AND evidence that it worked.
Explanation
Correct Answer
For the observed condition (A 25Gb access uplink reports module alarms because the selected optics differ from supported combinations), the appropriate response is to select an optic and fiber or copper medium explicitly supported by both device models and port specifications. The underlying risk is that matching the connector shape alone cannot prove the transceiver supports the wavelength, reach, or port speed. This action is targeted to optic and transceiver compatibility rather than to a different switching feature. Confirm it by checking that the transceiver inventory reports compatible modules and the end-to-end link negotiates stably without excessive errors.
The relevant acceptance proof for this incident (A 25Gb access uplink reports module alarms because the selected optics differ from supported combinations) is: The transceiver inventory reports compatible modules and the end-to-end link negotiates stably without excessive errors. That observation tests the same failure path that prompted the change, not merely whether a physical link is up. It also helps rule out the known alternative risk: Matching the connector shape alone cannot prove the transceiver supports the wavelength, reach, or port speed. Retain the documented evidence after applying the associated correction: Select an optic and fiber or copper medium explicitly supported by both device models and port specifications.
Incorrect Answers
Split-port breakout support addresses another technical failure: a physically available high-speed socket cannot always be subdivided into arbitrary child-port speeds. The case states: A 25Gb access uplink reports module alarms because the selected optics differ from supported combinations. The most direct paired action and test is: select an optic and fiber or copper medium explicitly supported by both device models and port specifications.
Poe budget and power priority addresses another technical failure: a free physical Ethernet socket does not imply sufficient remaining power for every access point or camera. This choice can be useful for that problem, but it does not establish the Optic and transceiver compatibility control being assessed here.
Speed duplex and physical diagnostics would demonstrate or implement: The link negotiates the intended speed and duplex and error counts stop increasing under traffic. This case instead tests Optic and transceiver compatibility; the choice measures or changes another part of the system.