Question 80
A production maintenance plan must handle this scenario: Multiple administrators intend to reorganize a large ADOM policy set and need a reliable rollback point. What preventive step is most appropriate?
Explanation
Correct Answer
This preparation reduces the risk that without a recorded ADOM revision it is difficult to restore coherent rule and object relationships. Check the resulting system state: The revision history contains a dated prechange checkpoint that can be inspected and compared.
Incorrect Answers
That precaution addresses another failure: an ADOM-scoped policy package cannot be assumed valid for unrelated tenant devices. This separate concern does not meet the requested action for Require a revision note and affected-package inventory.
That precaution addresses another failure: deleting an object still referenced by another package or rule can break that configuration. The current action instead turns on Require a revision note and affected-package inventory.
That precaution addresses another failure: locking the entire ADOM for a narrow change can unnecessarily block other valid administrators. The primary requirement remains Require a revision note and affected-package inventory, not that separate capability.