Question 190
A change reviewer anticipates problems with this requirement: An isolated management network cannot contact managed FortiGate devices during policy preparation, but analysts must prepare controlled updates. What should be checked before rollout?
Explanation
Correct Answer
This preparation reduces the risk that equating a saved offline database change with a deployed device change gives false assurance about enforcement. Check the resulting system state: The revised package is staged in FortiManager while device installation remains explicitly pending.
Incorrect Answers
That precaution addresses another failure: treating authentication success as permission to write can lead to excessive access or rejected operations. This separate concern does not meet the requested action for Require post-reconnection retrieval or installation and device.
That precaution addresses another failure: upgrading the ADOM without confirming managed gateway compatibility can strand older devices or required settings. The current action instead turns on Require post-reconnection retrieval or installation and device.
That precaution addresses another failure: independent local modifications can diverge from the reviewed central policy and device settings. The primary requirement remains Require post-reconnection retrieval or installation and device, not that separate capability.