Question 120
Before a monitored change is approved, the SOC finds: The SOC is about to shorten analytics retention for an emergency disk cleanup while relying on threat hunting to investigate older campaigns. Which acceptance check confirms that the requirement is satisfied?
Explanation
Correct Answer
This directly verifies log scope and threat intelligence retention: The available search range still covers the policy's required investigation interval and storage utilization stays controlled. The linked remediation is: Estimate required retrospective hunt windows and adjust retention with approved archival or capacity measures first. A result from an unrelated SOC function does not prove this requirement.
Incorrect Answers
The restored messages match source hashes or expected records and can be examined in the supported tools. This is a different failure mechanism from the current case, which concerns the available search range still covers the policy's required investigation interval and storage utilization stays controlled.
This option instead describes a test failover timeline shows events from the correct active member before and after the transition. Testing that independent mechanism would not show whether the reported fault has been resolved.
The analyst can search the authorized ADOM without gaining access to unrelated tenant data. The stem describes the SOC is about to shorten analytics retention for an emergency disk cleanup while relying on threat hunting to investigate older campaigns, so this explanation does not account for the observations.