mcAfee Secure Website
exam =5
exam =6

Exam Code: CCP

Exam Name: Certified CMMC Professional

Certification Provider: Cyber AB

Corresponding Certification: Certified CMMC Professional

Cyber AB CCP Questions & Answers

Reliable & Actual Study Materials for CCP Exam Success

201 Questions & Answers with Testing Engine

"CCP: Certified CMMC Professional" Testing Engine covers all the knowledge points of the real Cyber AB CCP exam.

The latest actual CCP Questions & Answers from Pass4sure. Everything you need to prepare and get best score at CCP exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cyber AB Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cyber AB CCP Practice Test 9

Question 80

At Harborlight Systems, an assessor receives a policy stating multifactor authentication is enabled but has no evidence that selected users actually use it. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Declare the objective met based on the policy's title.
  2. Count purchase orders as evidence of deployed authentication.
  3. Collect examine, interview and test evidence appropriate to the defined objective before scoring.
  4. Assume an executive verbal assurance overrides observed failed access tests.

Explanation

Correct Answer

C:

Written policy alone does not prove technical implementation or operating effectiveness. Validate by checking: Trace an objective to configurations, a representative demonstration and authorized testimony.

Incorrect Answers

A:

For Harborlight Systems, “Declare the objective met based on the policy's title” is not sufficient to establish the required control. The applicable action is Collect examine, interview and test evidence appropriate to the defined objective before scoring.

B:

Written policy alone does not prove technical implementation or operating effectiveness.

D:

Verify this with: Trace an objective to configurations, a representative demonstration and authorized testimony.

Question 81

At Quarryline Fabrication, an assessment-team member finds a previously submitted screenshot was altered to hide a failed control. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Delete both versions to avoid a difficult discussion.
  2. Treat the alteration as immaterial solely because the supplier later purchased a tool.
  3. Replace the screenshot with a favorable vendor stock image.
  4. Preserve the original, document the discrepancy, and report it through the authorized evidence-integrity process.

Explanation

Correct Answer

D:

Reliable evidence and professional honesty require accurate records of what was actually observed. Validate by checking: Maintain provenance and an auditable discrepancy resolution under assessor direction.

Incorrect Answers

A:

For Quarryline Fabrication, “Delete both versions to avoid a difficult discussion” is not sufficient to establish the required control. The applicable action is Preserve the original, document the discrepancy, and report it through the authorized evidence-integrity process.

B:

Reliable evidence and professional honesty require accurate records of what was actually observed.

C:

Verify this with: Maintain provenance and an auditable discrepancy resolution under assessor direction.

Question 82

At Lakeside Systems, visitors to a data room are left alone while an authorized employee goes to a meeting. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Treat possession of a temporary badge as permanent staff authorization.
  2. Use only email reminders after allowing independent room access.
  3. Assume visitors cannot see information because equipment is rack-mounted.
  4. Require escort or monitoring of visitors as applicable under the physical protection practice.

Explanation

Correct Answer

D:

Visitor access needs oversight rather than unlimited freedom in a protected area. Validate by checking: Match visitor entries to escort assignments and sampled walkthrough observations.

Incorrect Answers

A:

For Lakeside Systems, “Treat possession of a temporary badge as permanent staff authorization” is not sufficient to establish the required control. The applicable action is Require escort or monitoring of visitors as applicable under the physical protection practice.

B:

Visitor access needs oversight rather than unlimited freedom in a protected area.

C:

Verify this with: Match visitor entries to escort assignments and sampled walkthrough observations.

Question 83

At Briarfield Defense, a web application permits privileged access solely by typing a known employee username, without verifying identity. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Trust the account name because it is on an approved roster.
  2. Disable login verification during business hours for convenience.
  3. Use a backup inventory spreadsheet as an authentication mechanism.
  4. Require authentication of the claimed user or process before permitting protected access.

Explanation

Correct Answer

D:

Identification alone does not establish that the requester is the legitimate entity. Validate by checking: Show denied access for an impersonated account and successful verified login for an authorized user.

Incorrect Answers

A:

For Briarfield Defense, “Trust the account name because it is on an approved roster” is not sufficient to establish the required control. The applicable action is Require authentication of the claimed user or process before permitting protected access.

B:

Identification alone does not establish that the requester is the legitimate entity.

C:

Verify this with: Show denied access for an impersonated account and successful verified login for an authorized user.

Question 84

At Northpoint Engineering, a contractor demonstrates access controls using a test account that has special permissions unlike ordinary users. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Accept any successful privileged test as proof all standard users are restricted.
  2. Stop testing because the demonstration account is labeled QA.
  3. Select representative accounts and verify the objective under realistic authorized and unauthorized conditions.
  4. Replace technical tests with an employee satisfaction survey.

Explanation

Correct Answer

C:

Nonrepresentative demonstrations can obscure gaps in actual access restrictions. Validate by checking: Observe role-specific allowed and denied transactions for sampled accounts.

Incorrect Answers

A:

For Northpoint Engineering, “Accept any successful privileged test as proof all standard users are restricted” is not sufficient to establish the required control. The applicable action is Select representative accounts and verify the objective under realistic authorized and unauthorized conditions.

B:

Nonrepresentative demonstrations can obscure gaps in actual access restrictions.

D:

Verify this with: Observe role-specific allowed and denied transactions for sampled accounts.

Question 85

At Stonefield Communications, an OSC submits an evidence list where several critical artifacts will not be available until after the assessment date. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Ignore unavailable documents and promise to invent them during reporting.
  2. Assess readiness and address evidence gaps or schedule issues before starting formal fieldwork.
  3. Assume evidence never needs to be collected when policies are signed.
  4. Score unseen systems based on earlier sales demonstrations.

Explanation

Correct Answer

B:

Readiness review protects assessment integrity by identifying missing prerequisites early. Validate by checking: Confirm actionable artifact availability and an assessor-approved readiness decision.

Incorrect Answers

A:

For Stonefield Communications, “Ignore unavailable documents and promise to invent them during reporting” is not sufficient to establish the required control. The applicable action is Assess readiness and address evidence gaps or schedule issues before starting formal fieldwork.

C:

Readiness review protects assessment integrity by identifying missing prerequisites early.

D:

Verify this with: Confirm actionable artifact availability and an assessor-approved readiness decision.

Question 86

At Dunecrest Manufacturing, an FCI workstation has a critical vendor security update available but no established remediation process. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Delete the vulnerability report without addressing the underlying flaw.
  2. Hide the update notification from end users and call it resolved.
  3. Track and remediate identified system flaws using approved change controls and risk-based timing.
  4. Rely on malware signatures without applying a required system patch.

Explanation

Correct Answer

C:

Flaw remediation requires actionable identification, correction and verification rather than permanent deferral. Validate by checking: Review patch records and rescan affected hosts for the corrected version.

Incorrect Answers

A:

For Dunecrest Manufacturing, “Delete the vulnerability report without addressing the underlying flaw” is not sufficient to establish the required control. The applicable action is Track and remediate identified system flaws using approved change controls and risk-based timing.

B:

Flaw remediation requires actionable identification, correction and verification rather than permanent deferral.

D:

Verify this with: Review patch records and rescan affected hosts for the corrected version.

Question 87

At Evervale Electronics, a contractor supplies a screenshot of an approved procedure while live systems contradict the stated control. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Treat the signed procedure as overriding all observed system behavior.
  2. Automatically delete the observed results because they are embarrassing.
  3. Resolve the contradiction with direct observation and document the factual discrepancy.
  4. Mark the objective met and postpone documenting the difference indefinitely.

Explanation

Correct Answer

C:

Evidence must reflect implementation, not merely policy intent; contradictory information requires examination. Validate by checking: Retain the contradictory artifacts and assessor-directed objective-level resolution.

Incorrect Answers

A:

For Evervale Electronics, “Treat the signed procedure as overriding all observed system behavior” is not sufficient to establish the required control. The applicable action is Resolve the contradiction with direct observation and document the factual discrepancy.

B:

Evidence must reflect implementation, not merely policy intent; contradictory information requires examination.

D:

Verify this with: Retain the contradictory artifacts and assessor-directed objective-level resolution.

Question 88

At Stonefield Communications, a Level 1 contractor has never inventoried employees and services authorized to access its FCI processing portal. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Permit any account with a valid email address to use the portal.
  2. Turn off authentication temporarily because the portal is not classified.
  3. Assume perimeter firewalls alone ensure every internal user is authorized.
  4. Identify authorized users, processes and devices and restrict system access accordingly.

Explanation

Correct Answer

D:

Authorized access must be limited to approved identities and relevant system functions. Validate by checking: Compare an approved account roster with actual successful access and denied unapproved attempts.

Incorrect Answers

A:

For Stonefield Communications, “Permit any account with a valid email address to use the portal” is not sufficient to establish the required control. The applicable action is Identify authorized users, processes and devices and restrict system access accordingly.

B:

Authorized access must be limited to approved identities and relevant system functions.

C:

Verify this with: Compare an approved account roster with actual successful access and denied unapproved attempts.

Question 89

At Cedarport Services, preliminary results show a not-met practice and the OSC asks to replace that result with a verbal promise. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Change the finding to met solely because a manager promised a fix.
  2. Record the observed evidence and preliminary finding through the prescribed validation process.
  3. Delete the failed test result from the assessment workpapers.
  4. Treat budget approval as automatic proof of technical compliance.

Explanation

Correct Answer

B:

A future promise without evidence is not a demonstrated implemented practice. Validate by checking: Confirm a traceable preliminary result and the proper review or correction path.

Incorrect Answers

A:

For Cedarport Services, “Change the finding to met solely because a manager promised a fix” is not sufficient to establish the required control. The applicable action is Record the observed evidence and preliminary finding through the prescribed validation process.

C:

A future promise without evidence is not a demonstrated implemented practice.

D:

Verify this with: Confirm a traceable preliminary result and the proper review or correction path.

Question 90

At Pine Harbor Analytics, an assessment report includes raw CUI screenshots in an unrestricted shared download folder. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Send a public link to ensure everyone can review the findings.
  2. Assume removing a report title eliminates all CUI risk.
  3. Restrict report artifacts to authorized handling and distribution paths.
  4. Place the archive on personal removable storage without controls.

Explanation

Correct Answer

C:

Assessment reporting and archival duties include safeguarding sensitive source evidence. Validate by checking: Verify access restrictions and approved retention and distribution decisions.

Incorrect Answers

A:

For Pine Harbor Analytics, “Send a public link to ensure everyone can review the findings” is not sufficient to establish the required control. The applicable action is Restrict report artifacts to authorized handling and distribution paths.

B:

Assessment reporting and archival duties include safeguarding sensitive source evidence.

D:

Verify this with: Verify access restrictions and approved retention and distribution decisions.

Certified CMMC Professional (CCP) Practice Tests