mcAfee Secure Website
exam =5
exam =6

Exam Code: 800-150

Exam Name: Supporting Cisco Devices for Field Technicians

Certification Provider: Cisco

Cisco 800-150 Questions & Answers

Reliable & Actual Study Materials for 800-150 Exam Success

100 Questions & Answers with Testing Engine

"800-150: Supporting Cisco Devices for Field Technicians" Testing Engine covers all the knowledge points of the real Cisco 800-150 exam.

The latest actual 800-150 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at 800-150 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cisco Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cisco 800-150 Practice Test 75

Question 740

Disaster-recovery facility inspection. Field report: Several racks share an end-of-row network switch design. Which action is the most defensible first step?

  1. Replace rack fiber bundles with unqualified USB cables.
  2. Connect server storage NICs only through a phone gateway.
  3. Assume all racks must contain a full distribution switch regardless of design.
  4. Map individual rack links to the intended end-of-row aggregation platform.

Explanation

Correct Answer

D:

EoR aggregates multiple racks through a planned switch placement rather than ToR per cabinet. The action should lead to evidence that rack links terminate at the assigned row aggregation ports.

Incorrect Answers

A:

That change addresses a different aspect of the environment and leaves this requirement unresolved: several racks share an end-of-row network switch design. The relevant control is map individual rack links to the intended end-of-row aggregation platform.

B:

Attempting this shortcut is not an adequate substitute for the required action. EoR aggregates multiple racks through a planned switch placement rather than ToR per cabinet. Post-change evidence is still needed.

C:

This alternative would not solve the reported problem. EoR aggregates multiple racks through a planned switch placement rather than ToR per cabinet. The field team must instead establish whether rack links terminate at the assigned row aggregation ports.

Question 741

Main campus hardware-service ticket. Field report: A run has no optical light and the interface never establishes carrier. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Demonstrate that transmitter/receiver levels and physical link state become healthy.
  2. Confirm only that the technician attempted: change an http header to repair the optical transmitter.
  3. Confirm the site inventory list still contains the hostname, without validating the reported service.
  4. Confirm only that the work ticket says “completed,” without testing osi physical layer.

Explanation

Correct Answer

A:

Transmitter/receiver levels and physical link state become healthy. Carrier and optical signal are physical-layer concerns rather than upper-layer protocols.

Incorrect Answers

B:

For example, “Change an HTTP header to repair the optical transmitter” does not demonstrate the corrected technical state.

C:

Confirm that transmitter/receiver levels and physical link state become healthy.

D:

Check whether transmitter/receiver levels and physical link state become healthy.

Question 742

Regional north-campus service window. Field report: A UCS X-Series compute node needs replacement in a modular chassis. Which action is the most defensible first step?

  1. Assume X-Series compute nodes fit any B-Series chassis bay.
  2. Check compatible node, chassis slot, management and fabric dependencies.
  3. Rewire an IP phone port as the server backplane.
  4. Use an arbitrary SSD model without checking service qualification.

Explanation

Correct Answer

B:

Modular UCS X-Series hardware depends on platform-specific compute and fabric support. The action should lead to evidence that node inventory, profile and required paths are restored.

Incorrect Answers

A:

This alternative would not solve the reported problem. Modular UCS X-Series hardware depends on platform-specific compute and fabric support. The field team must instead establish whether node inventory, profile and required paths are restored.

C:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a ucs x-series compute node needs replacement in a modular chassis. The relevant control is check compatible node, chassis slot, management and fabric dependencies.

D:

Attempting this shortcut is not an adequate substitute for the required action. Modular UCS X-Series hardware depends on platform-specific compute and fabric support. Post-change evidence is still needed.

Question 743

Customer branch-site maintenance. Field report: Traffic to one local endpoint floods unexpectedly on a switch. A colleague proposes: “Configure a static default IPv4 route to resolve every unknown unicast.” Which technical assessment is best supported?

  1. The original problem can be treated as resolved from inventory labels alone, without checking mac table forwarding behavior.
  2. There is no need to validate the reported dependency once assume ip ttl causes layer 2 unknown-unicast flooding.
  3. The proposal overlooks the reported dependency: Switches flood unknown unicast when destination MAC forwarding information is absent.
  4. The proposed shortcut is sufficient because replace the campus wan router without checking bridge learning.

Explanation

Correct Answer

C:

The alternative does not address the actual reported dependency. Switches flood unknown unicast when destination MAC forwarding information is absent. The supported intervention is inspect whether the switch has learned the endpoint mac on the expected port; acceptance should show that the destination MAC is present and learned on the intended interface.

Incorrect Answers

A:

The failure described in the field report requires a functional check that the destination MAC is present and learned on the intended interface.

B:

It assumes an unrelated action establishes service recovery. Nothing about “Assume IP TTL causes Layer 2 unknown-unicast flooding” demonstrates whether the destination MAC is present and learned on the intended interface.

D:

The proposed step “Replace the campus WAN router without checking bridge learning” is not the required mechanism.

Question 744

Primary data-center night shift. Field report: An edge router has a default route and a more specific route for an internal subnet. Which action is the most defensible first step?

  1. Choose the oldest route entry irrespective of mask specificity.
  2. Select the route with the longest textual description.
  3. Assume the default route always takes priority regardless of prefix length.
  4. Use longest-prefix match to identify the intended forwarding route.

Explanation

Correct Answer

D:

IP forwarding normally selects the most specific matching route in the forwarding table. The action should lead to evidence that the forwarding path uses the expected next hop for that prefix.

Incorrect Answers

A:

That change addresses a different aspect of the environment and leaves this requirement unresolved: an edge router has a default route and a more specific route for an internal subnet. The relevant control is use longest-prefix match to identify the intended forwarding route.

B:

Attempting this shortcut is not an adequate substitute for the required action. IP forwarding normally selects the most specific matching route in the forwarding table. Post-change evidence is still needed.

C:

This alternative would not solve the reported problem. IP forwarding normally selects the most specific matching route in the forwarding table. The field team must instead establish whether the forwarding path uses the expected next hop for that prefix.

Question 745

Headquarters wiring-closet visit. Field report: Operators need centralized control and monitoring of meeting resources. A colleague proposes: “Change BGP multipath parameters to create meeting controls.” Which technical assessment is best supported?

  1. The proposal overlooks the reported dependency: Meeting management tools provide conferencing operational oversight, distinct from IP transport.
  2. The proposed shortcut is sufficient because use an ethernet power supply to schedule rooms.
  3. There is no need to validate the reported dependency once treat the call-log archive as the live meeting administrator.
  4. The original problem can be treated as resolved from inventory labels alone, without checking meeting management role behavior.

Explanation

Correct Answer

A:

The alternative does not address the actual reported dependency. Meeting management tools provide conferencing operational oversight, distinct from IP transport. The supported intervention is use the supported cisco meeting management component for conference operations; acceptance should show that authorized operators can view and manage the intended meeting state.

Incorrect Answers

B:

The proposed step “Use an Ethernet power supply to schedule rooms” is not the required mechanism.

C:

It assumes an unrelated action establishes service recovery. Nothing about “Treat the call-log archive as the live meeting administrator” demonstrates whether authorized operators can view and manage the intended meeting state.

D:

The failure described in the field report requires a functional check that authorized operators can view and manage the intended meeting state.

Question 746

Colocation site RMA handoff. Field report: A UCS domain's hardware is healthy after RMA but a server profile association is missing. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Defer service verification after “Assume physical power alone establishes server profile application” until the next reported incident.
  2. Perform or retain the approved action: check service-profile association and ucs management inventory before handing off; document evidence that the intended profile is associated and operational.
  3. Apply “Reconfigure an unrelated meeting tenant to create blade identity” as a substitute and declare success from shipment receipt alone.
  4. Close after recording “Change the fabric link's DNS PTR record as a profile restore” without checking that the intended profile is associated and operational.

Explanation

Correct Answer

B:

This handoff preserves the required corrective action and the verifiable service outcome. UCS service profiles and management assignments can be essential to expected server identity. Recording that the intended profile is associated and operational makes the signoff testable.

Incorrect Answers

A:

A future incident is not a reasonable acceptance gate for a known problem. “Assume physical power alone establishes server profile application” is not evidence that the intended profile is associated and operational.

C:

Delivery paperwork describes logistics, not recovered functionality. “Reconfigure an unrelated meeting tenant to create blade identity” leaves the technical requirement and its validation unresolved.

D:

This proposes a different action with no acceptance evidence. “Change the fabric link's DNS PTR record as a profile restore” cannot replace the validated measure that the intended profile is associated and operational.

Question 747

Remote office replacement window. Field report: A virtual machine moves to another host but loses network reachability. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm the site inventory list still contains the hostname, without validating the reported service.
  2. Confirm only that the technician attempted: change every physical server's bios clock to fix routing.
  3. Demonstrate that the migrated guest reaches its intended subnet and services.
  4. Confirm only that the work ticket says “completed,” without testing vm mobility network.

Explanation

Correct Answer

C:

The migrated guest reaches its intended subnet and services. Migrated workloads still need compatible virtual and physical network attachment.

Incorrect Answers

A:

Confirm that the migrated guest reaches its intended subnet and services. Migrated workloads still need compatible virtual and physical network attachment.

B:

For example, “Change every physical server's BIOS clock to fix routing” does not demonstrate the corrected technical state.

D:

Check whether the migrated guest reaches its intended subnet and services. Migrated workloads still need compatible virtual and physical network attachment.

Question 748

Disaster-recovery facility inspection. Field report: A provider-edge ASR line card requires a field replacement. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm the site inventory list still contains the hostname, without validating the reported service.
  2. Confirm only that the technician attempted: assume the same faceplate implies identical supported features.
  3. Confirm only that the work ticket says “completed,” without testing asr line-card compatibility.
  4. Demonstrate that inventory, interfaces and path reachability after insertion.

Explanation

Correct Answer

D:

Inventory, interfaces and path reachability after insertion. ASR network cards have platform-specific support requirements.

Incorrect Answers

A:

Confirm that inventory, interfaces and path reachability after insertion. ASR network cards have platform-specific support requirements.

B:

For example, “Assume the same faceplate implies identical supported features” does not demonstrate the corrected technical state.

C:

Check whether inventory, interfaces and path reachability after insertion. ASR network cards have platform-specific support requirements.

Question 749

Main campus hardware-service ticket. Field report: A Cisco rack-mounted compute host needs remote hardware management and inventory capture. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Perform or retain the approved action: use the supported c-series integrated management controller for hardware state; document evidence that requested hardware identifiers and health sensors are recorded.
  2. Apply “Replace the data-center fabric switch to read system sensors” as a substitute and declare success from shipment receipt alone.
  3. Defer service verification after “Treat a DNS query as a power supply inventory report” until the next reported incident.
  4. Close after recording “Use a voice endpoint GUI to change server firmware” without checking that requested hardware identifiers and health sensors are recorded.

Explanation

Correct Answer

A:

This handoff preserves the required corrective action and the verifiable service outcome. C-Series management controllers expose platform sensors, inventory and remote service controls. Recording that requested hardware identifiers and health sensors are recorded makes the signoff testable.

Incorrect Answers

B:

Delivery paperwork describes logistics, not recovered functionality. “Replace the data-center fabric switch to read system sensors” leaves the technical requirement and its validation unresolved.

C:

A future incident is not a reasonable acceptance gate for a known problem. “Treat a DNS query as a power supply inventory report” is not evidence that requested hardware identifiers and health sensors are recorded.

D:

This proposes a different action with no acceptance evidence. “Use a voice endpoint GUI to change server firmware” cannot replace the validated measure that requested hardware identifiers and health sensors are recorded.

Question 750

Regional north-campus service window. Field report: A long inter-building fiber path needs a compatible single-mode optical transceiver. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Defer service verification after “Use a copper SFP without copper conductors” until the next reported incident.
  2. Perform or retain the approved action: select optics and fiber type with matched wavelength, reach and connector specifications; document evidence that transceiver compatibility and receive light level meets platform limits.
  3. Close after recording “Install multimode-only optics against an unsupported single-mode path” without checking that transceiver compatibility and receive light level meets platform limits.
  4. Apply “Assume all SFPs work on any fiber irrespective of optical budget” as a substitute and declare success from shipment receipt alone.

Explanation

Correct Answer

B:

This handoff preserves the required corrective action and the verifiable service outcome. Optical systems require compatible fiber mode, wavelength, power budget and interface support. Recording that transceiver compatibility and receive light level meets platform limits makes the signoff testable.

Incorrect Answers

A:

A future incident is not a reasonable acceptance gate for a known problem. “Use a copper SFP without copper conductors” is not evidence that transceiver compatibility and receive light level meets platform limits.

C:

This proposes a different action with no acceptance evidence. “Install multimode-only optics against an unsupported single-mode path” cannot replace the validated measure that transceiver compatibility and receive light level meets platform limits.

D:

Delivery paperwork describes logistics, not recovered functionality. “Assume all SFPs work on any fiber irrespective of optical budget” leaves the technical requirement and its validation unresolved.