mcAfee Secure Website
exam =5
exam =6

Exam Code: 800-150

Exam Name: Supporting Cisco Devices for Field Technicians

Certification Provider: Cisco

Cisco 800-150 Questions & Answers

Reliable & Actual Study Materials for 800-150 Exam Success

100 Questions & Answers with Testing Engine

"800-150: Supporting Cisco Devices for Field Technicians" Testing Engine covers all the knowledge points of the real Cisco 800-150 exam.

The latest actual 800-150 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at 800-150 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cisco Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cisco 800-150 Practice Test 71

Question 700

Customer branch-site maintenance. Field report: Traffic to one local endpoint floods unexpectedly on a switch. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Defer service verification after “Assume IP TTL causes Layer 2 unknown-unicast flooding” until the next reported incident.
  2. Close after recording “Configure a static default IPv4 route to resolve every unknown unicast” without checking that the destination MAC is present and learned on the intended interface.
  3. Perform or retain the approved action: inspect whether the switch has learned the endpoint mac on the expected port; document evidence that the destination MAC is present and learned on the intended interface.
  4. Apply “Replace the campus WAN router without checking bridge learning” as a substitute and declare success from shipment receipt alone.

Explanation

Correct Answer

C:

This handoff preserves the required corrective action and the verifiable service outcome. Switches flood unknown unicast when destination MAC forwarding information is absent. Recording that the destination MAC is present and learned on the intended interface makes the signoff testable.

Incorrect Answers

A:

A future incident is not a reasonable acceptance gate for a known problem. “Assume IP TTL causes Layer 2 unknown-unicast flooding” is not evidence that the destination MAC is present and learned on the intended interface.

B:

This proposes a different action with no acceptance evidence. “Configure a static default IPv4 route to resolve every unknown unicast” cannot replace the validated measure that the destination MAC is present and learned on the intended interface.

D:

Delivery paperwork describes logistics, not recovered functionality. “Replace the campus WAN router without checking bridge learning” leaves the technical requirement and its validation unresolved.

Question 701

Main campus hardware-service ticket. Field report: A spare switch needs a validated baseline configuration with different hardware port layout. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Perform or retain the approved action: adapt and review the approved backup for compatible interfaces before controlled application; document evidence that the restored device implements approved settings and operational ports.
  2. Defer service verification after “Skip post-restore testing because the config was valid on another model” until the next reported incident.
  3. Apply “Copy the old chassis serial number into new device flash” as a substitute and declare success from shipment receipt alone.
  4. Close after recording “Paste the entire old configuration blindly onto incompatible hardware” without checking that the restored device implements approved settings and operational ports.

Explanation

Correct Answer

A:

This handoff preserves the required corrective action and the verifiable service outcome. Interface mappings and feature support may differ between hardware versions. Recording that the restored device implements approved settings and operational ports makes the signoff testable.

Incorrect Answers

B:

A future incident is not a reasonable acceptance gate for a known problem. “Skip post-restore testing because the config was valid on another model” is not evidence that the restored device implements approved settings and operational ports.

C:

Delivery paperwork describes logistics, not recovered functionality. “Copy the old chassis serial number into new device flash” leaves the technical requirement and its validation unresolved.

D:

This proposes a different action with no acceptance evidence. “Paste the entire old configuration blindly onto incompatible hardware” cannot replace the validated measure that the restored device implements approved settings and operational ports.

Question 702

Regional north-campus service window. Field report: A server uses a converged network adapter carrying LAN and storage traffic on supported links. A colleague proposes: “Assume ordinary Ethernet hubs inherently provide native FC zoning.” Which technical assessment is best supported?

  1. There is no need to validate the reported dependency once delete storage multipathing because a single wire carries multiple traffic classes.
  2. The proposal overlooks the reported dependency: Converged fabrics still need appropriate protocol support, traffic control and storage policy.
  3. The original problem can be treated as resolved from inventory labels alone, without checking converged fabric behavior.
  4. The proposed shortcut is sufficient because attach a fiber optic cable without checking storage protocol support.

Explanation

Correct Answer

B:

The alternative does not address the actual reported dependency. Converged fabrics still need appropriate protocol support, traffic control and storage policy. The supported intervention is identify fcoe or other qualified convergence features and fabric boundaries; acceptance should show that supported LAN/storage connectivity and isolation for each traffic type.

Incorrect Answers

A:

It assumes an unrelated action establishes service recovery. Nothing about “Delete storage multipathing because a single wire carries multiple traffic classes” demonstrates whether supported LAN/storage connectivity and isolation for each traffic type.

C:

The failure described in the field report requires a functional check that supported LAN/storage connectivity and isolation for each traffic type.

D:

The proposed step “Attach a fiber optic cable without checking storage protocol support” is not the required mechanism.

Question 703

Customer branch-site maintenance. Field report: A Nexus Fabric Extender connects remote host-facing ports to its controlling parent. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm the site inventory list still contains the hostname, without validating the reported service.
  2. Confirm only that the work ticket says “completed,” without testing fabric extender identity.
  3. Demonstrate that the FEX appears online with its expected host interfaces.
  4. Confirm only that the technician attempted: treat every fex as a ucs blade server.

Explanation

Correct Answer

C:

The FEX appears online with its expected host interfaces. FEX host ports are controlled through a supported parent Nexus relationship.

Incorrect Answers

A:

Confirm that the FEX appears online with its expected host interfaces. FEX host ports are controlled through a supported parent Nexus relationship.

B:

Check whether the FEX appears online with its expected host interfaces. FEX host ports are controlled through a supported parent Nexus relationship.

D:

For example, “Treat every FEX as a UCS blade server” does not demonstrate the corrected technical state.

Question 704

Primary data-center night shift. Field report: A Nexus running configuration has been corrected and must survive a reload. Which action is the most defensible first step?

  1. Assume any CLI edit instantly persists to nonvolatile storage.
  2. Rename the switch interface while leaving startup settings unchanged.
  3. Use a console cable as the only configuration backup.
  4. Save and verify the approved NX-OS configuration with platform-supported command.

Explanation

Correct Answer

D:

Operational configuration edits require an explicit persistence or checkpoint workflow. The action should lead to evidence that saved configuration matches intended running settings.

Incorrect Answers

A:

This alternative would not solve the reported problem. Operational configuration edits require an explicit persistence or checkpoint workflow. The field team must instead establish whether saved configuration matches intended running settings.

B:

Attempting this shortcut is not an adequate substitute for the required action. Operational configuration edits require an explicit persistence or checkpoint workflow. Post-change evidence is still needed.

C:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a nexus running configuration has been corrected and must survive a reload. The relevant control is save and verify the approved nx-os configuration with platform-supported command.

Question 705

Headquarters wiring-closet visit. Field report: A technician must stage a signed IOS XE release before a controlled activation. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Perform or retain the approved action: use the platform-supported `install add` operation on the validated image; document evidence that the intended release is present and eligible in install state.
  2. Close after recording “Immediately delete the old image before the new image is validated” without checking that the intended release is present and eligible in install state.
  3. Defer service verification after “Use a random binary with matching file extension without checking platform” until the next reported incident.
  4. Apply “Change only the device hostname and call it a software upgrade” as a substitute and declare success from shipment receipt alone.

Explanation

Correct Answer

A:

This handoff preserves the required corrective action and the verifiable service outcome. The add stage admits and validates a software package for subsequent activation. Recording that the intended release is present and eligible in install state makes the signoff testable.

Incorrect Answers

B:

This proposes a different action with no acceptance evidence. “Immediately delete the old image before the new image is validated” cannot replace the validated measure that the intended release is present and eligible in install state.

C:

A future incident is not a reasonable acceptance gate for a known problem. “Use a random binary with matching file extension without checking platform” is not evidence that the intended release is present and eligible in install state.

D:

Delivery paperwork describes logistics, not recovered functionality. “Change only the device hostname and call it a software upgrade” leaves the technical requirement and its validation unresolved.

Question 706

Colocation site RMA handoff. Field report: A 1 Gbps copper uplink is unreliable over a very long horizontal cable. A colleague proposes: “Enable jumbo frames to compensate for excessive cable attenuation.” Which technical assessment is best supported?

  1. There is no need to validate the reported dependency once set a higher routing administrative distance to repair the run.
  2. The proposal overlooks the reported dependency: Standard twisted-pair Ethernet commonly supports up to a 100 m copper channel within compliant design limits.
  3. The proposed shortcut is sufficient because increase the dhcp lease time to shorten copper signal travel.
  4. The original problem can be treated as resolved from inventory labels alone, without checking copper run length behavior.

Explanation

Correct Answer

B:

The alternative does not address the actual reported dependency. Standard twisted-pair Ethernet commonly supports up to a 100 m copper channel within compliant design limits. The supported intervention is check the installed copper channel against the applicable ethernet reach limits; acceptance should show that the revised channel passes certification and links at the required rate.

Incorrect Answers

A:

It assumes an unrelated action establishes service recovery. Nothing about “Set a higher routing administrative distance to repair the run” demonstrates whether the revised channel passes certification and links at the required rate.

C:

The proposed step “Increase the DHCP lease time to shorten copper signal travel” is not the required mechanism.

D:

The failure described in the field report requires a functional check that the revised channel passes certification and links at the required rate.

Question 707

Remote office replacement window. Field report: A failed UCS server is swapped while its workload identity must remain consistent. Which action is the most defensible first step?

  1. Disable all fabric links before reassociating a profile.
  2. Copy the old node's printed serial label onto the new server.
  3. Review service profile association and hardware compatibility for the new compute node.
  4. Assume management IP alone recreates WWPN/MAC/service identity policies.

Explanation

Correct Answer

C:

Service profiles can carry logical server identity and policy independent of physical node. The action should lead to evidence that correct profile association and workload network/storage attachment.

Incorrect Answers

A:

Attempting this shortcut is not an adequate substitute for the required action. Service profiles can carry logical server identity and policy independent of physical node. Post-change evidence is still needed.

B:

This alternative would not solve the reported problem. Service profiles can carry logical server identity and policy independent of physical node. The field team must instead establish whether correct profile association and workload network/storage attachment.

D:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a failed ucs server is swapped while its workload identity must remain consistent. The relevant control is review service profile association and hardware compatibility for the new compute node.

Question 708

Disaster-recovery facility inspection. Field report: A branch ISR hosts an embedded UCS E-Series compute module. A colleague proposes: “Treat it as a full-size rack-mounted C-Series unit.” Which technical assessment is best supported?

  1. The original problem can be treated as resolved from inventory labels alone, without checking ucs e-series identity behavior.
  2. The proposed shortcut is sufficient because insert a chassis blade from b-series because all ucs products are interchangeable.
  3. There is no need to validate the reported dependency once reconfigure campus stp instead of checking module support.
  4. The proposal overlooks the reported dependency: UCS E-Series is integrated compute intended for supported edge/router platforms.

Explanation

Correct Answer

D:

The alternative does not address the actual reported dependency. UCS E-Series is integrated compute intended for supported edge/router platforms. The supported intervention is follow the supported router-hosted ucs e-series hardware and management procedure; acceptance should show that router recognizes the module and its management access is available.

Incorrect Answers

A:

The failure described in the field report requires a functional check that router recognizes the module and its management access is available.

B:

The proposed step “Insert a chassis blade from B-Series because all UCS products are interchangeable” is not the required mechanism.

C:

It assumes an unrelated action establishes service recovery. Nothing about “Reconfigure campus STP instead of checking module support” demonstrates whether router recognizes the module and its management access is available.

Question 709

Main campus hardware-service ticket. Field report: A field visit includes checking an active long-range fiber transmission link. A colleague proposes: “Inspect the optical core directly by eye to estimate laser power.” Which technical assessment is best supported?

  1. The proposal overlooks the reported dependency: Fiber transceivers may emit hazardous light invisible to the eye.
  2. The original problem can be treated as resolved from inventory labels alone, without checking optical laser safety behavior.
  3. The proposed shortcut is sufficient because remove safety labels so the connector is easier to see.
  4. There is no need to validate the reported dependency once use a copper network cable tester as a substitute for laser safety.

Explanation

Correct Answer

A:

The alternative does not address the actual reported dependency. Fiber transceivers may emit hazardous light invisible to the eye. The supported intervention is use approved optical instrumentation and never look into a powered fiber connector; acceptance should show that optical testing completed without direct viewing of energized fiber.

Incorrect Answers

B:

The failure described in the field report requires a functional check that optical testing completed without direct viewing of energized fiber.

C:

The proposed step “Remove safety labels so the connector is easier to see” is not the required mechanism.

D:

It assumes an unrelated action establishes service recovery. Nothing about “Use a copper network cable tester as a substitute for laser safety” demonstrates whether optical testing completed without direct viewing of energized fiber.

Question 710

Regional north-campus service window. Field report: An interface shows a fe80:: address but requires external IPv6 connectivity. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm only that the work ticket says “completed,” without testing ipv6 link-local.
  2. Demonstrate that the host receives the correct IPv6 prefix and a usable default router.
  3. Confirm only that the technician attempted: use an ipv4 arp reply as the complete ipv6 route discovery process.
  4. Confirm the site inventory list still contains the hostname, without validating the reported service.

Explanation

Correct Answer

B:

The host receives the correct IPv6 prefix and a usable default router. IPv6 link-local scope does not by itself provide routable IPv6 service.

Incorrect Answers

A:

Check whether the host receives the correct IPv6 prefix and a usable default router.

C:

For example, “Use an IPv4 ARP reply as the complete IPv6 route discovery process” does not demonstrate the corrected technical state.

D:

Confirm that the host receives the correct IPv6 prefix and a usable default router.

Supporting Cisco Devices for Field Technicians (800-150) Practice Tests