mcAfee Secure Website
exam =5
exam =6

Exam Code: 800-150

Exam Name: Supporting Cisco Devices for Field Technicians

Certification Provider: Cisco

Cisco 800-150 Questions & Answers

Reliable & Actual Study Materials for 800-150 Exam Success

100 Questions & Answers with Testing Engine

"800-150: Supporting Cisco Devices for Field Technicians" Testing Engine covers all the knowledge points of the real Cisco 800-150 exam.

The latest actual 800-150 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at 800-150 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cisco Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cisco 800-150 Practice Test 70

Question 690

Main campus hardware-service ticket. Field report: An organization retains local UCM while integrating approved hosted collaboration functions. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Demonstrate that intended on-premises services and cloud functions work across the supported integration.
  2. Confirm the site inventory list still contains the hostname, without validating the reported service.
  3. Confirm only that the work ticket says “completed,” without testing hybrid deployment boundary.
  4. Confirm only that the technician attempted: replace a san switch with a public sip registrar without design review.

Explanation

Correct Answer

A:

Intended on-premises services and cloud functions work across the supported integration. Hybrid architecture combines local and cloud functions with explicit integration points.

Incorrect Answers

B:

Confirm that intended on-premises services and cloud functions work across the supported integration.

C:

Check whether intended on-premises services and cloud functions work across the supported integration.

D:

For example, “Replace a SAN switch with a public SIP registrar without design review” does not demonstrate the corrected technical state.

Question 691

Regional north-campus service window. Field report: An installed optic is recognized but an uplink cannot negotiate the planned speed. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm only that the work ticket says “completed,” without testing sfp speed mismatch.
  2. Demonstrate that the two ends use supported modes and the expected link rate.
  3. Confirm only that the technician attempted: modify endpoint vlan names to improve optical negotiation.
  4. Confirm the site inventory list still contains the hostname, without validating the reported service.

Explanation

Correct Answer

B:

The two ends use supported modes and the expected link rate. Ports and transceivers have supported speeds and media requirements.

Incorrect Answers

A:

Check whether the two ends use supported modes and the expected link rate. Ports and transceivers have supported speeds and media requirements.

C:

For example, “Modify endpoint VLAN names to improve optical negotiation” does not demonstrate the corrected technical state.

D:

Confirm that the two ends use supported modes and the expected link rate. Ports and transceivers have supported speeds and media requirements.

Question 692

Customer branch-site maintenance. Field report: An approved new image causes persistent traffic drops after proper testing. Which action is the most defensible first step?

  1. Erase both current and previous images without checking recovery.
  2. Modify a DHCP hostname as a substitute for restoring compatible code.
  3. Follow the approved rollback procedure to a known-good supported image.
  4. Ignore active degradation because software activated successfully.

Explanation

Correct Answer

C:

Controlled rollback provides a recovery path when a new software image fails acceptance. The action should lead to evidence that previous service levels and approved software state are restored.

Incorrect Answers

A:

This alternative would not solve the reported problem. Controlled rollback provides a recovery path when a new software image fails acceptance. The field team must instead establish whether previous service levels and approved software state are restored.

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: an approved new image causes persistent traffic drops after proper testing. The relevant control is follow the approved rollback procedure to a known-good supported image.

D:

Attempting this shortcut is not an adequate substitute for the required action. Controlled rollback provides a recovery path when a new software image fails acceptance. Post-change evidence is still needed.

Question 693

Primary data-center night shift. Field report: A technician must stage a signed IOS XE release before a controlled activation. A colleague proposes: “Immediately delete the old image before the new image is validated.” Which technical assessment is best supported?

  1. The original problem can be treated as resolved from inventory labels alone, without checking install add stage behavior.
  2. There is no need to validate the reported dependency once use a random binary with matching file extension without checking platform.
  3. The proposed shortcut is sufficient because change only the device hostname and call it a software upgrade.
  4. The proposal overlooks the reported dependency: The add stage admits and validates a software package for subsequent activation.

Explanation

Correct Answer

D:

The alternative does not address the actual reported dependency. The add stage admits and validates a software package for subsequent activation. The supported intervention is use the platform-supported `install add` operation on the validated image; acceptance should show that the intended release is present and eligible in install state.

Incorrect Answers

A:

The failure described in the field report requires a functional check that the intended release is present and eligible in install state.

B:

It assumes an unrelated action establishes service recovery. Nothing about “Use a random binary with matching file extension without checking platform” demonstrates whether the intended release is present and eligible in install state.

C:

The proposed step “Change only the device hostname and call it a software upgrade” is not the required mechanism.

Question 694

Headquarters wiring-closet visit. Field report: A new branch laptop self-assigns 169.254.x.x instead of a site lease. A colleague proposes: “Add a route to the 169.254.x.x address as the campus design.” Which technical assessment is best supported?

  1. The proposal overlooks the reported dependency: Automatic link-local IPv4 addressing often indicates the host obtained no DHCP lease.
  2. There is no need to validate the reported dependency once replace the internet edge firewall without dhcp evidence.
  3. The proposed shortcut is sufficient because set all hosts to the same static address as the gateway.
  4. The original problem can be treated as resolved from inventory labels alone, without checking dhcp assignment behavior.

Explanation

Correct Answer

A:

The alternative does not address the actual reported dependency. Automatic link-local IPv4 addressing often indicates the host obtained no DHCP lease. The supported intervention is check dhcp reachability and correct scope or relay availability; acceptance should show that the host acquires an intended address, mask, gateway and DNS options.

Incorrect Answers

B:

It assumes an unrelated action establishes service recovery. Nothing about “Replace the Internet edge firewall without DHCP evidence” demonstrates whether the host acquires an intended address, mask, gateway and DNS options.

C:

The proposed step “Set all hosts to the same static address as the gateway” is not the required mechanism.

D:

The failure described in the field report requires a functional check that the host acquires an intended address, mask, gateway and DNS options.

Question 695

Colocation site RMA handoff. Field report: A replaced router reports registration or authorization warnings. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Defer service verification after “Replace the power supply rather than review licensing status” until the next reported incident.
  2. Perform or retain the approved action: check smart licensing connectivity and the applicable entitlement process; document evidence that supported licensing status matches the purchased entitlement.
  3. Close after recording “Erase the device serial number to suppress entitlement warnings” without checking that supported licensing status matches the purchased entitlement.
  4. Apply “Disable all logging to hide licensing state” as a substitute and declare success from shipment receipt alone.

Explanation

Correct Answer

B:

This handoff preserves the required corrective action and the verifiable service outcome. License-state warnings should be resolved through approved registration and policy workflows. Recording that supported licensing status matches the purchased entitlement makes the signoff testable.

Incorrect Answers

A:

A future incident is not a reasonable acceptance gate for a known problem. “Replace the power supply rather than review licensing status” is not evidence that supported licensing status matches the purchased entitlement.

C:

This proposes a different action with no acceptance evidence. “Erase the device serial number to suppress entitlement warnings” cannot replace the validated measure that supported licensing status matches the purchased entitlement.

D:

Delivery paperwork describes logistics, not recovered functionality. “Disable all logging to hide licensing state” leaves the technical requirement and its validation unresolved.

Question 696

Remote office replacement window. Field report: Operators need centralized control and monitoring of meeting resources. Which action is the most defensible first step?

  1. Use an Ethernet power supply to schedule rooms.
  2. Treat the call-log archive as the live meeting administrator.
  3. Use the supported Cisco meeting management component for conference operations.
  4. Change BGP multipath parameters to create meeting controls.

Explanation

Correct Answer

C:

Meeting management tools provide conferencing operational oversight, distinct from IP transport. The action should lead to evidence that authorized operators can view and manage the intended meeting state.

Incorrect Answers

A:

That change addresses a different aspect of the environment and leaves this requirement unresolved: operators need centralized control and monitoring of meeting resources. The relevant control is use the supported cisco meeting management component for conference operations.

B:

Attempting this shortcut is not an adequate substitute for the required action. Meeting management tools provide conferencing operational oversight, distinct from IP transport. Post-change evidence is still needed.

D:

This alternative would not solve the reported problem. Meeting management tools provide conferencing operational oversight, distinct from IP transport. The field team must instead establish whether authorized operators can view and manage the intended meeting state.

Question 697

Disaster-recovery facility inspection. Field report: A replacement Cisco phone powers on but never registers to its call-control cluster. A colleague proposes: “Replace WAN route processors before testing the phone's voice VLAN.” Which technical assessment is best supported?

  1. There is no need to validate the reported dependency once assign a new random ip subnet without verifying voice services.
  2. The proposed shortcut is sufficient because assume a green poe port proves sip/phone registration.
  3. The original problem can be treated as resolved from inventory labels alone, without checking ip phone boot sequence behavior.
  4. The proposal overlooks the reported dependency: IP phones need network services and provisioning before call-control registration.

Explanation

Correct Answer

D:

The alternative does not address the actual reported dependency. IP phones need network services and provisioning before call-control registration. The supported intervention is check address assignment, provisioning discovery and call-control reachability; acceptance should show that endpoint obtains network parameters and reaches registered state.

Incorrect Answers

A:

It assumes an unrelated action establishes service recovery. Nothing about “Assign a new random IP subnet without verifying voice services” demonstrates whether endpoint obtains network parameters and reaches registered state.

B:

The proposed step “Assume a green PoE port proves SIP/phone registration” is not the required mechanism.

C:

The failure described in the field report requires a functional check that endpoint obtains network parameters and reaches registered state.

Question 698

Main campus hardware-service ticket. Field report: A support case requires retaining a config that contains sensitive values. Which action is the most defensible first step?

  1. Store the backup in approved access-controlled storage and limit distribution.
  2. Attach unredacted credentials to an open collaboration chat.
  3. Keep the only copy on a technician's personal USB drive.
  4. Upload the config to a public paste site for easier technician access.

Explanation

Correct Answer

A:

Configuration backups can contain sensitive infrastructure details and must follow handling controls. The action should lead to evidence that authorized personnel can retrieve the protected backup with audit trail.

Incorrect Answers

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a support case requires retaining a config that contains sensitive values. The relevant control is store the backup in approved access-controlled storage and limit distribution.

C:

Attempting this shortcut is not an adequate substitute for the required action. Configuration backups can contain sensitive infrastructure details and must follow handling controls. Post-change evidence is still needed.

D:

This alternative would not solve the reported problem. Configuration backups can contain sensitive infrastructure details and must follow handling controls. The field team must instead establish whether authorized personnel can retrieve the protected backup with audit trail.

Question 699

Regional north-campus service window. Field report: A branch ISR router has a failing interface module and limited spare slots. A colleague proposes: “Install an MDS Fibre Channel line card into the ISR.” Which technical assessment is best supported?

  1. There is no need to validate the reported dependency once swap the wan ip address onto an unused console port.
  2. The proposal overlooks the reported dependency: ISR interface modules have explicit supported chassis and slot requirements.
  3. The original problem can be treated as resolved from inventory labels alone, without checking isr wan card behavior.
  4. The proposed shortcut is sufficient because assume a universal pci card works in all isr module bays.

Explanation

Correct Answer

B:

The alternative does not address the actual reported dependency. ISR interface modules have explicit supported chassis and slot requirements. The supported intervention is choose an approved isr network interface module for the exact model and slot; acceptance should show that the module is recognized and branch WAN connectivity is restored.

Incorrect Answers

A:

It assumes an unrelated action establishes service recovery. Nothing about “Swap the WAN IP address onto an unused console port” demonstrates whether the module is recognized and branch WAN connectivity is restored.

C:

The failure described in the field report requires a functional check that the module is recognized and branch WAN connectivity is restored.

D:

The proposed step “Assume a universal PCI card works in all ISR module bays” is not the required mechanism.

Question 700

Customer branch-site maintenance. Field report: Traffic to one local endpoint floods unexpectedly on a switch. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Defer service verification after “Assume IP TTL causes Layer 2 unknown-unicast flooding” until the next reported incident.
  2. Close after recording “Configure a static default IPv4 route to resolve every unknown unicast” without checking that the destination MAC is present and learned on the intended interface.
  3. Perform or retain the approved action: inspect whether the switch has learned the endpoint mac on the expected port; document evidence that the destination MAC is present and learned on the intended interface.
  4. Apply “Replace the campus WAN router without checking bridge learning” as a substitute and declare success from shipment receipt alone.

Explanation

Correct Answer

C:

This handoff preserves the required corrective action and the verifiable service outcome. Switches flood unknown unicast when destination MAC forwarding information is absent. Recording that the destination MAC is present and learned on the intended interface makes the signoff testable.

Incorrect Answers

A:

A future incident is not a reasonable acceptance gate for a known problem. “Assume IP TTL causes Layer 2 unknown-unicast flooding” is not evidence that the destination MAC is present and learned on the intended interface.

B:

This proposes a different action with no acceptance evidence. “Configure a static default IPv4 route to resolve every unknown unicast” cannot replace the validated measure that the destination MAC is present and learned on the intended interface.

D:

Delivery paperwork describes logistics, not recovered functionality. “Replace the campus WAN router without checking bridge learning” leaves the technical requirement and its validation unresolved.

Supporting Cisco Devices for Field Technicians (800-150) Practice Tests