mcAfee Secure Website
exam =5
exam =6

Exam Code: 800-150

Exam Name: Supporting Cisco Devices for Field Technicians

Certification Provider: Cisco

Cisco 800-150 Questions & Answers

Reliable & Actual Study Materials for 800-150 Exam Success

100 Questions & Answers with Testing Engine

"800-150: Supporting Cisco Devices for Field Technicians" Testing Engine covers all the knowledge points of the real Cisco 800-150 exam.

The latest actual 800-150 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at 800-150 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cisco Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cisco 800-150 Practice Test 57

Question 560

Regional north-campus service window. Field report: Staff use a hosted collaboration application without administering its servers. A colleague proposes: “Install a hypervisor on every user laptop as a prerequisite.” Which technical assessment is best supported?

  1. The proposed shortcut is sufficient because classify every cloud meeting as direct bare-metal iaas access.
  2. The proposal overlooks the reported dependency: SaaS delivers an application rather than raw infrastructure for the customer to administer.
  3. There is no need to validate the reported dependency once assume a san director gives individual users hosted application accounts.
  4. The original problem can be treated as resolved from inventory labels alone, without checking saas consumption behavior.

Explanation

Correct Answer

B:

The alternative does not address the actual reported dependency. SaaS delivers an application rather than raw infrastructure for the customer to administer. The supported intervention is recognize saas application consumption and its access dependencies; acceptance should show that users authenticate and can use the hosted application.

Incorrect Answers

A:

The proposed step “Classify every cloud meeting as direct bare-metal IaaS access” is not the required mechanism.

C:

It assumes an unrelated action establishes service recovery. Nothing about “Assume a SAN director gives individual users hosted application accounts” demonstrates whether users authenticate and can use the hosted application.

D:

The failure described in the field report requires a functional check that users authenticate and can use the hosted application.

Question 561

Customer branch-site maintenance. Field report: A Nexus Ethernet uplink stays down after line-card replacement. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Apply “Rebuild a VLAN database without checking physical interface state” as a substitute and declare success from shipment receipt alone.
  2. Defer service verification after “Assume a successful management ping proves the traffic port is up” until the next reported incident.
  3. Perform or retain the approved action: inspect nx-os interface operational and error state for the correct slot/port; document evidence that affected interface comes up and counters remain clean.
  4. Close after recording “Use only a Windows registry check as evidence of the Nexus optic” without checking that affected interface comes up and counters remain clean.

Explanation

Correct Answer

C:

This handoff preserves the required corrective action and the verifiable service outcome. NX-OS interface and module state are the relevant diagnostics for a failed uplink. Recording that affected interface comes up and counters remain clean makes the signoff testable.

Incorrect Answers

A:

Delivery paperwork describes logistics, not recovered functionality. “Rebuild a VLAN database without checking physical interface state” leaves the technical requirement and its validation unresolved.

B:

A future incident is not a reasonable acceptance gate for a known problem. “Assume a successful management ping proves the traffic port is up” is not evidence that affected interface comes up and counters remain clean.

D:

This proposes a different action with no acceptance evidence. “Use only a Windows registry check as evidence of the Nexus optic” cannot replace the validated measure that affected interface comes up and counters remain clean.

Question 562

Primary data-center night shift. Field report: A new branch laptop self-assigns 169.254.x.x instead of a site lease. Which action is the most defensible first step?

  1. Set all hosts to the same static address as the gateway.
  2. Add a route to the 169.254.x.x address as the campus design.
  3. Replace the Internet edge firewall without DHCP evidence.
  4. Check DHCP reachability and correct scope or relay availability.

Explanation

Correct Answer

D:

Automatic link-local IPv4 addressing often indicates the host obtained no DHCP lease. The action should lead to evidence that the host acquires an intended address, mask, gateway and DNS options.

Incorrect Answers

A:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a new branch laptop self-assigns 169.254.x.x instead of a site lease. The relevant control is check dhcp reachability and correct scope or relay availability.

B:

This alternative would not solve the reported problem. Automatic link-local IPv4 addressing often indicates the host obtained no DHCP lease. The field team must instead establish whether the host acquires an intended address, mask, gateway and DNS options.

C:

Attempting this shortcut is not an adequate substitute for the required action. Automatic link-local IPv4 addressing often indicates the host obtained no DHCP lease. Post-change evidence is still needed.

Question 563

Headquarters wiring-closet visit. Field report: Operators need centralized control and monitoring of meeting resources. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Demonstrate that authorized operators can view and manage the intended meeting state.
  2. Confirm only that the work ticket says “completed,” without testing meeting management role.
  3. Confirm only that the technician attempted: use an ethernet power supply to schedule rooms.
  4. Confirm the site inventory list still contains the hostname, without validating the reported service.

Explanation

Correct Answer

A:

Authorized operators can view and manage the intended meeting state. Meeting management tools provide conferencing operational oversight, distinct from IP transport.

Incorrect Answers

B:

Check whether authorized operators can view and manage the intended meeting state.

C:

For example, “Use an Ethernet power supply to schedule rooms” does not demonstrate the corrected technical state.

D:

Confirm that authorized operators can view and manage the intended meeting state.

Question 564

Colocation site RMA handoff. Field report: An organization retains local UCM while integrating approved hosted collaboration functions. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Close after recording “Assume hybrid means all local equipment is immediately decommissioned” without checking that intended on-premises services and cloud functions work across the supported integration.
  2. Perform or retain the approved action: document local call-control responsibilities and cloud integration dependencies; document evidence that intended on-premises services and cloud functions work across the supported integration.
  3. Defer service verification after “Treat an NTP source as the only hybrid federation control” until the next reported incident.
  4. Apply “Replace a SAN switch with a public SIP registrar without design review” as a substitute and declare success from shipment receipt alone.

Explanation

Correct Answer

B:

This handoff preserves the required corrective action and the verifiable service outcome. Hybrid architecture combines local and cloud functions with explicit integration points. Recording that intended on-premises services and cloud functions work across the supported integration makes the signoff testable.

Incorrect Answers

A:

This proposes a different action with no acceptance evidence. “Assume hybrid means all local equipment is immediately decommissioned” cannot replace the validated measure that intended on-premises services and cloud functions work across the supported integration.

C:

A future incident is not a reasonable acceptance gate for a known problem. “Treat an NTP source as the only hybrid federation control” is not evidence that intended on-premises services and cloud functions work across the supported integration.

D:

Delivery paperwork describes logistics, not recovered functionality. “Replace a SAN switch with a public SIP registrar without design review” leaves the technical requirement and its validation unresolved.

Question 565

Remote office replacement window. Field report: A router skips its expected startup configuration during a controlled recovery. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Defer service verification after “Assume an Ethernet trunk VLAN controls the boot loader” until the next reported incident.
  2. Apply “Disable the console port to force the startup config to load” as a substitute and declare success from shipment receipt alone.
  3. Perform or retain the approved action: check the platform-specific configuration register and boot settings under approved procedure; document evidence that the intended startup configuration loads after a validated reload.
  4. Close after recording “Copy another site's running config without inspecting boot behavior” without checking that the intended startup configuration loads after a validated reload.

Explanation

Correct Answer

C:

This handoff preserves the required corrective action and the verifiable service outcome. Platform boot register settings can influence startup configuration use. Recording that the intended startup configuration loads after a validated reload makes the signoff testable.

Incorrect Answers

A:

A future incident is not a reasonable acceptance gate for a known problem. “Assume an Ethernet trunk VLAN controls the boot loader” is not evidence that the intended startup configuration loads after a validated reload.

B:

Delivery paperwork describes logistics, not recovered functionality. “Disable the console port to force the startup config to load” leaves the technical requirement and its validation unresolved.

D:

This proposes a different action with no acceptance evidence. “Copy another site's running config without inspecting boot behavior” cannot replace the validated measure that the intended startup configuration loads after a validated reload.

Question 566

Disaster-recovery facility inspection. Field report: An NCS aggregation router is to receive a different line-rate transceiver. A colleague proposes: “Select an optic with the same connector but incompatible line rate.” Which technical assessment is best supported?

  1. There is no need to validate the reported dependency once change ip route metrics without verifying physical compatibility.
  2. The original problem can be treated as resolved from inventory labels alone, without checking ncs platform optics behavior.
  3. The proposed shortcut is sufficient because assume all coherent optics work in every low-cost ethernet port.
  4. The proposal overlooks the reported dependency: NCS optical module support is constrained by interface design and platform release.

Explanation

Correct Answer

D:

The alternative does not address the actual reported dependency. NCS optical module support is constrained by interface design and platform release. The supported intervention is check exact ncs interface, speed, optic type and power-budget support; acceptance should show that the optic is supported and the link meets optical and error thresholds.

Incorrect Answers

A:

It assumes an unrelated action establishes service recovery. Nothing about “Change IP route metrics without verifying physical compatibility” demonstrates whether the optic is supported and the link meets optical and error thresholds.

B:

The failure described in the field report requires a functional check that the optic is supported and the link meets optical and error thresholds.

C:

The proposed step “Assume all coherent optics work in every low-cost Ethernet port” is not the required mechanism.

Question 567

Main campus hardware-service ticket. Field report: An approved new image causes persistent traffic drops after proper testing. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Perform or retain the approved action: follow the approved rollback procedure to a known-good supported image; document evidence that previous service levels and approved software state are restored.
  2. Apply “Modify a DHCP hostname as a substitute for restoring compatible code” as a substitute and declare success from shipment receipt alone.
  3. Defer service verification after “Ignore active degradation because software activated successfully” until the next reported incident.
  4. Close after recording “Erase both current and previous images without checking recovery” without checking that previous service levels and approved software state are restored.

Explanation

Correct Answer

A:

This handoff preserves the required corrective action and the verifiable service outcome. Controlled rollback provides a recovery path when a new software image fails acceptance. Recording that previous service levels and approved software state are restored makes the signoff testable.

Incorrect Answers

B:

Delivery paperwork describes logistics, not recovered functionality. “Modify a DHCP hostname as a substitute for restoring compatible code” leaves the technical requirement and its validation unresolved.

C:

A future incident is not a reasonable acceptance gate for a known problem. “Ignore active degradation because software activated successfully” is not evidence that previous service levels and approved software state are restored.

D:

This proposes a different action with no acceptance evidence. “Erase both current and previous images without checking recovery” cannot replace the validated measure that previous service levels and approved software state are restored.

Question 568

Regional north-campus service window. Field report: Receive power drops after a fiber cross-connect change. A colleague proposes: “Polish live optics with an abrasive cloth while powered.” Which technical assessment is best supported?

  1. There is no need to validate the reported dependency once assume interface speed mismatch is the only possible optical cause.
  2. The proposal overlooks the reported dependency: Dirty fiber connectors increase optical insertion loss and can disrupt signal margin.
  3. The original problem can be treated as resolved from inventory labels alone, without checking optic contamination behavior.
  4. The proposed shortcut is sufficient because raise software interface mtu to remove dust from connectors.

Explanation

Correct Answer

B:

The alternative does not address the actual reported dependency. Dirty fiber connectors increase optical insertion loss and can disrupt signal margin. The supported intervention is inspect and clean fiber end faces using approved procedures; acceptance should show that cleanliness and receive power levels after proper recoupling.

Incorrect Answers

A:

It assumes an unrelated action establishes service recovery. Nothing about “Assume interface speed mismatch is the only possible optical cause” demonstrates whether cleanliness and receive power levels after proper recoupling.

C:

The failure described in the field report requires a functional check that cleanliness and receive power levels after proper recoupling.

D:

The proposed step “Raise software interface MTU to remove dust from connectors” is not the required mechanism.

Question 569

Customer branch-site maintenance. Field report: TAC needs to distinguish the failed line card from the parent chassis. A colleague proposes: “Send only the chassis management IP and omit the module ID.” Which technical assessment is best supported?

  1. The original problem can be treated as resolved from inventory labels alone, without checking fru serial identification behavior.
  2. There is no need to validate the reported dependency once use the switch stp root mac as the replacement fru serial.
  3. The proposal overlooks the reported dependency: Field-replaceable modules can have separate serials and product identifiers.
  4. The proposed shortcut is sufficient because assume every line card shares its chassis serial number.

Explanation

Correct Answer

C:

The alternative does not address the actual reported dependency. Field-replaceable modules can have separate serials and product identifiers. The supported intervention is capture the affected fru serial and slot location from supported inventory; acceptance should show that the failing FRU serial and location correspond to the RMA item.

Incorrect Answers

A:

The failure described in the field report requires a functional check that the failing FRU serial and location correspond to the RMA item.

B:

It assumes an unrelated action establishes service recovery. Nothing about “Use the switch STP root MAC as the replacement FRU serial” demonstrates whether the failing FRU serial and location correspond to the RMA item.

D:

The proposed step “Assume every line card shares its chassis serial number” is not the required mechanism.

Question 570

Primary data-center night shift. Field report: A replaced router reports registration or authorization warnings. Which action is the most defensible first step?

  1. Disable all logging to hide licensing state.
  2. Erase the device serial number to suppress entitlement warnings.
  3. Replace the power supply rather than review licensing status.
  4. Check Smart Licensing connectivity and the applicable entitlement process.

Explanation

Correct Answer

D:

License-state warnings should be resolved through approved registration and policy workflows. The action should lead to evidence that supported licensing status matches the purchased entitlement.

Incorrect Answers

A:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a replaced router reports registration or authorization warnings. The relevant control is check smart licensing connectivity and the applicable entitlement process.

B:

This alternative would not solve the reported problem. License-state warnings should be resolved through approved registration and policy workflows. The field team must instead establish whether supported licensing status matches the purchased entitlement.

C:

Attempting this shortcut is not an adequate substitute for the required action. License-state warnings should be resolved through approved registration and policy workflows. Post-change evidence is still needed.

Supporting Cisco Devices for Field Technicians (800-150) Practice Tests