mcAfee Secure Website
exam =5
exam =6

Exam Code: 800-150

Exam Name: Supporting Cisco Devices for Field Technicians

Certification Provider: Cisco

Cisco 800-150 Questions & Answers

Reliable & Actual Study Materials for 800-150 Exam Success

100 Questions & Answers with Testing Engine

"800-150: Supporting Cisco Devices for Field Technicians" Testing Engine covers all the knowledge points of the real Cisco 800-150 exam.

The latest actual 800-150 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at 800-150 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cisco Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cisco 800-150 Practice Test 4

Question 30

Remote office replacement window. Field report: A Cisco 8000 platform comes back from replacement with unexpected system image behavior. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm only that the work ticket says “completed,” without testing cisco 8000 ios xr platform.
  2. Confirm the site inventory list still contains the hostname, without validating the reported service.
  3. Demonstrate that the IOS XR release, boot state and service interfaces match the plan.
  4. Confirm only that the technician attempted: assume all cisco operating systems have identical image install workflows.

Explanation

Correct Answer

C:

The IOS XR release, boot state and service interfaces match the plan. Cisco 8000 routing platforms may use IOS XR and need product-specific procedures.

Incorrect Answers

A:

Check whether the IOS XR release, boot state and service interfaces match the plan.

B:

Confirm that the IOS XR release, boot state and service interfaces match the plan.

D:

For example, “Assume all Cisco operating systems have identical image install workflows” does not demonstrate the corrected technical state.

Question 31

Disaster-recovery facility inspection. Field report: Two different IP subnets need forwarding between separate Layer 3 networks. Which action is the most defensible first step?

  1. Use a passive fiber patch panel as the packet-forwarding gateway.
  2. Replace the routers with a power injector.
  3. Extend the original untagged access segment and omit gateways.
  4. Provide routed interfaces or gateways with appropriate routes.

Explanation

Correct Answer

D:

A router or Layer 3 switching function forwards packets between IP networks. The action should lead to evidence that each subnet has its gateway and routed test traffic reaches the remote subnet.

Incorrect Answers

A:

That change addresses a different aspect of the environment and leaves this requirement unresolved: two different ip subnets need forwarding between separate layer 3 networks. The relevant control is provide routed interfaces or gateways with appropriate routes.

B:

Attempting this shortcut is not an adequate substitute for the required action. A router or Layer 3 switching function forwards packets between IP networks. Post-change evidence is still needed.

C:

This alternative would not solve the reported problem. A router or Layer 3 switching function forwards packets between IP networks. The field team must instead establish whether each subnet has its gateway and routed test traffic reaches the remote subnet.

Question 32

Main campus hardware-service ticket. Field report: A hypervisor host runs multiple guest systems sharing physical NICs. A colleague proposes: “Assume each guest owns a dedicated external physical port regardless of configuration.” Which technical assessment is best supported?

  1. The proposal overlooks the reported dependency: Virtualization multiplexes guest network resources onto host physical connectivity.
  2. The original problem can be treated as resolved from inventory labels alone, without checking virtual machine host behavior.
  3. There is no need to validate the reported dependency once replace the fc switch to create guest virtual interfaces automatically.
  4. The proposed shortcut is sufficient because treat the hypervisor as an ip phone registration service.

Explanation

Correct Answer

A:

The alternative does not address the actual reported dependency. Virtualization multiplexes guest network resources onto host physical connectivity. The supported intervention is distinguish virtual nics and virtual switches from the underlying host uplink; acceptance should show that guest virtual NIC mappings and external uplinks match the approved design.

Incorrect Answers

B:

The failure described in the field report requires a functional check that guest virtual NIC mappings and external uplinks match the approved design.

C:

It assumes an unrelated action establishes service recovery. Nothing about “Replace the FC switch to create guest virtual interfaces automatically” demonstrates whether guest virtual NIC mappings and external uplinks match the approved design.

D:

The proposed step “Treat the hypervisor as an IP phone registration service” is not the required mechanism.

Question 33

Regional north-campus service window. Field report: An AP is registered but clients on a busy channel suffer high retries. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Apply “Replace every upstream router before reviewing client retries” as a substitute and declare success from shipment receipt alone.
  2. Perform or retain the approved action: check channel utilization and rf interference before choosing a clean plan; document evidence that channel conditions and client retry rates improve after the RF change.
  3. Close after recording “Assume an Ethernet default gateway fixes all RF collisions” without checking that channel conditions and client retry rates improve after the RF change.
  4. Defer service verification after “Disable encryption to increase the radio's signal quality” until the next reported incident.

Explanation

Correct Answer

B:

This handoff preserves the required corrective action and the verifiable service outcome. Radio contention can impair clients even when the AP is joined and the wired link is up. Recording that channel conditions and client retry rates improve after the RF change makes the signoff testable.

Incorrect Answers

A:

Delivery paperwork describes logistics, not recovered functionality. “Replace every upstream router before reviewing client retries” leaves the technical requirement and its validation unresolved.

C:

This proposes a different action with no acceptance evidence. “Assume an Ethernet default gateway fixes all RF collisions” cannot replace the validated measure that channel conditions and client retry rates improve after the RF change.

D:

A future incident is not a reasonable acceptance gate for a known problem. “Disable encryption to increase the radio's signal quality” is not evidence that channel conditions and client retry rates improve after the RF change.

Question 34

Customer branch-site maintenance. Field report: A device works now but the field technician must document active settings. A colleague proposes: “Use an unverified archived file as the live configuration.” Which technical assessment is best supported?

  1. The original problem can be treated as resolved from inventory labels alone, without checking show running-config behavior.
  2. There is no need to validate the reported dependency once rely solely on an interface status light to recover all settings.
  3. The proposal overlooks the reported dependency: The running configuration describes current active IOS configuration.
  4. The proposed shortcut is sufficient because treat `show startup-config` as proof of unsaved changes.

Explanation

Correct Answer

C:

The alternative does not address the actual reported dependency. The running configuration describes current active IOS configuration. The supported intervention is capture `show running-config` through an authorized session; acceptance should show that the captured configuration reflects the approved live interfaces and services.

Incorrect Answers

A:

The failure described in the field report requires a functional check that the captured configuration reflects the approved live interfaces and services.

B:

It assumes an unrelated action establishes service recovery. Nothing about “Rely solely on an interface status light to recover all settings” demonstrates whether the captured configuration reflects the approved live interfaces and services.

D:

The proposed step “Treat `show startup-config` as proof of unsaved changes” is not the required mechanism.

Question 35

Primary data-center night shift. Field report: A new ISR chassis boots with a default configuration but must replace a specific branch. Which action is the most defensible first step?

  1. Disable startup configuration so the router forgets the intended WAN path.
  2. Apply a configuration from a different branch without comparing addressing.
  3. Copy only the host name and call branch routing restored.
  4. Restore a validated site-specific configuration with reviewed interface mappings.

Explanation

Correct Answer

D:

Branch restore needs the correct interfaces, routing and security policy. The action should lead to evidence that WAN paths, LAN gateway and approved site services match baseline.

Incorrect Answers

A:

Attempting this shortcut is not an adequate substitute for the required action. Branch restore needs the correct interfaces, routing and security policy. Post-change evidence is still needed.

B:

This alternative would not solve the reported problem. Branch restore needs the correct interfaces, routing and security policy. The field team must instead establish whether WAN paths, LAN gateway and approved site services match baseline.

C:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a new isr chassis boots with a default configuration but must replace a specific branch. The relevant control is restore a validated site-specific configuration with reviewed interface mappings.

Question 36

Headquarters wiring-closet visit. Field report: A Cisco 8000 router receives a high-density line-card spare with a specific fabric requirement. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Perform or retain the approved action: validate card and fabric-module interoperability for its chassis model; document evidence that slot, fabric, card and interface status are healthy.
  2. Close after recording “Insert it into an arbitrary slot based only on physical width” without checking that slot, fabric, card and interface status are healthy.
  3. Defer service verification after “Ignore supported optics and forwarding-capacity prerequisites” until the next reported incident.
  4. Apply “Assume access-switch stacking rules apply unchanged to the 8000 family” as a substitute and declare success from shipment receipt alone.

Explanation

Correct Answer

A:

This handoff preserves the required corrective action and the verifiable service outcome. Large modular router families require documented line-card/fabric compatibility. Recording that slot, fabric, card and interface status are healthy makes the signoff testable.

Incorrect Answers

B:

This proposes a different action with no acceptance evidence. “Insert it into an arbitrary slot based only on physical width” cannot replace the validated measure that slot, fabric, card and interface status are healthy.

C:

A future incident is not a reasonable acceptance gate for a known problem. “Ignore supported optics and forwarding-capacity prerequisites” is not evidence that slot, fabric, card and interface status are healthy.

D:

Delivery paperwork describes logistics, not recovered functionality. “Assume access-switch stacking rules apply unchanged to the 8000 family” leaves the technical requirement and its validation unresolved.

Question 37

Colocation site RMA handoff. Field report: A handset dials successfully but all incoming calls return failure after the swap. A colleague proposes: “Change Ethernet FEC on a fabric spine before examining call control.” Which technical assessment is best supported?

  1. The proposed shortcut is sufficient because treat the phone asset sticker as proof inbound dial plan works.
  2. The proposal overlooks the reported dependency: Inbound call behavior depends on number routing and service signaling beyond power.
  3. There is no need to validate the reported dependency once disable the upstream default route to improve signaling.
  4. The original problem can be treated as resolved from inventory labels alone, without checking sip path trace behavior.

Explanation

Correct Answer

B:

The alternative does not address the actual reported dependency. Inbound call behavior depends on number routing and service signaling beyond power. The supported intervention is review line configuration, call routing and signaling traces for the affected number; acceptance should show that directed inbound and outbound test calls reach the intended phone.

Incorrect Answers

A:

The proposed step “Treat the phone asset sticker as proof inbound dial plan works” is not the required mechanism.

C:

It assumes an unrelated action establishes service recovery. Nothing about “Disable the upstream default route to improve signaling” demonstrates whether directed inbound and outbound test calls reach the intended phone.

D:

The failure described in the field report requires a functional check that directed inbound and outbound test calls reach the intended phone.

Question 38

Remote office replacement window. Field report: A B-Series blade fails inside a UCS chassis and its replacement must retain logical identity. Which action is the most defensible first step?

  1. Treat the blade as a fixed Catalyst access switch line card.
  2. Copy a different tenant's boot profile without approval.
  3. Check service-profile mapping and supported blade/chassis compatibility.
  4. Disable the chassis IOM before examining server association.

Explanation

Correct Answer

C:

UCS blades rely on compatible chassis resources and assigned service profiles. The action should lead to evidence that blade inventory, profile and host connectivity after replacement.

Incorrect Answers

A:

This alternative would not solve the reported problem. UCS blades rely on compatible chassis resources and assigned service profiles. The field team must instead establish whether blade inventory, profile and host connectivity after replacement.

B:

Attempting this shortcut is not an adequate substitute for the required action. UCS blades rely on compatible chassis resources and assigned service profiles. Post-change evidence is still needed.

D:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a b-series blade fails inside a ucs chassis and its replacement must retain logical identity. The relevant control is check service-profile mapping and supported blade/chassis compatibility.

Question 39

Disaster-recovery facility inspection. Field report: A replacement conference room device passes power-on only. A colleague proposes: “Declare success from a green power LED alone.” Which technical assessment is best supported?

  1. The proposed shortcut is sufficient because use only the courier's rma delivery confirmation as a functional test.
  2. The original problem can be treated as resolved from inventory labels alone, without checking endpoint return-to-service behavior.
  3. There is no need to validate the reported dependency once skip microphone and display checks because software version matches.
  4. The proposal overlooks the reported dependency: Collaboration endpoint acceptance requires actual media function and provisioning.

Explanation

Correct Answer

D:

The alternative does not address the actual reported dependency. Collaboration endpoint acceptance requires actual media function and provisioning. The supported intervention is complete registration, call signaling, audio/video media and user acceptance checks; acceptance should show that end users can complete the designated test meeting with full media.

Incorrect Answers

A:

The proposed step “Use only the courier's RMA delivery confirmation as a functional test” is not the required mechanism.

B:

The failure described in the field report requires a functional check that end users can complete the designated test meeting with full media.

C:

It assumes an unrelated action establishes service recovery. Nothing about “Skip microphone and display checks because software version matches” demonstrates whether end users can complete the designated test meeting with full media.

Question 40

Main campus hardware-service ticket. Field report: A Catalyst edge routing platform needs a compatible WAN interface replacement. Which action is the most defensible first step?

  1. Validate exact module family, software support and slot mapping before service.
  2. Treat all WAN modules as interchangeable because they use Ethernet.
  3. Install an unrelated Catalyst access switch line card into the router.
  4. Move the device's management IP to a phone without replacing the module.

Explanation

Correct Answer

A:

Edge-platform FRUs depend on supported interface and hardware compatibility. The action should lead to evidence that module inventory and intended WAN ports operate after replacement.

Incorrect Answers

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a catalyst edge routing platform needs a compatible wan interface replacement. The relevant control is validate exact module family, software support and slot mapping before service.

C:

This alternative would not solve the reported problem. Edge-platform FRUs depend on supported interface and hardware compatibility. The field team must instead establish whether module inventory and intended WAN ports operate after replacement.

D:

Attempting this shortcut is not an adequate substitute for the required action. Edge-platform FRUs depend on supported interface and hardware compatibility. Post-change evidence is still needed.