mcAfee Secure Website
exam =5
exam =6

Exam Code: 800-150

Exam Name: Supporting Cisco Devices for Field Technicians

Certification Provider: Cisco

Cisco 800-150 Questions & Answers

Reliable & Actual Study Materials for 800-150 Exam Success

100 Questions & Answers with Testing Engine

"800-150: Supporting Cisco Devices for Field Technicians" Testing Engine covers all the knowledge points of the real Cisco 800-150 exam.

The latest actual 800-150 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at 800-150 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cisco Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cisco 800-150 Practice Test 20

Question 190

Primary data-center night shift. Field report: A user needs hosted conferencing with scheduled online sessions. A colleague proposes: “Set up a new SAN VSAN solely to provide cloud meetings.” Which technical assessment is best supported?

  1. There is no need to validate the reported dependency once deploy a network packet broker as the meeting application.
  2. The proposed shortcut is sufficient because route all users to an on-premises phone firmware update as the meeting host.
  3. The original problem can be treated as resolved from inventory labels alone, without checking webex meetings service behavior.
  4. The proposal overlooks the reported dependency: Webex Meetings provides cloud-hosted meeting sessions and collaboration features.

Explanation

Correct Answer

D:

The alternative does not address the actual reported dependency. Webex Meetings provides cloud-hosted meeting sessions and collaboration features. The supported intervention is use approved webex meetings tenant and account access; acceptance should show that user joins the scheduled meeting with audio and video.

Incorrect Answers

A:

It assumes an unrelated action establishes service recovery. Nothing about “Deploy a network packet broker as the meeting application” demonstrates whether user joins the scheduled meeting with audio and video.

B:

The proposed step “Route all users to an on-premises phone firmware update as the meeting host” is not the required mechanism.

C:

The failure described in the field report requires a functional check that user joins the scheduled meeting with audio and video.

Question 191

Headquarters wiring-closet visit. Field report: An accidental redundant Layer 2 patch makes the network unstable. Which action is the most defensible first step?

  1. Inspect spanning-tree topology and remove the unauthorized loop safely.
  2. Change RADIUS shared secrets to repair bridge loops.
  3. Turn off ARP on all workstations to eliminate all loops.
  4. Install longer Ethernet cables on the same loop.

Explanation

Correct Answer

A:

STP and approved topology controls keep redundant Layer 2 paths from forwarding in loops. The action should lead to evidence that topology stabilizes with correct STP port roles.

Incorrect Answers

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: an accidental redundant layer 2 patch makes the network unstable. The relevant control is inspect spanning-tree topology and remove the unauthorized loop safely.

C:

This alternative would not solve the reported problem. STP and approved topology controls keep redundant Layer 2 paths from forwarding in loops. The field team must instead establish whether topology stabilizes with correct STP port roles.

D:

Attempting this shortcut is not an adequate substitute for the required action. STP and approved topology controls keep redundant Layer 2 paths from forwarding in loops. Post-change evidence is still needed.

Question 192

Colocation site RMA handoff. Field report: A router has a connected IPv4 route but cannot deliver traffic to a local next hop. Which action is the most defensible first step?

  1. Use ICMP TTL values as hardware addresses.
  2. Check ARP resolution and Layer 2 adjacency for that next hop.
  3. Swap an unrelated BGP community attribute.
  4. Enable DNS recursion on the router to populate its ARP cache.

Explanation

Correct Answer

B:

A connected IPv4 next hop still requires valid local Layer 2 resolution. The action should lead to evidence that the correct next-hop MAC appears and packets leave the intended interface.

Incorrect Answers

A:

Attempting this shortcut is not an adequate substitute for the required action. A connected IPv4 next hop still requires valid local Layer 2 resolution. Post-change evidence is still needed.

C:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a router has a connected ipv4 route but cannot deliver traffic to a local next hop. The relevant control is check arp resolution and layer 2 adjacency for that next hop.

D:

This alternative would not solve the reported problem. A connected IPv4 next hop still requires valid local Layer 2 resolution. The field team must instead establish whether the correct next-hop MAC appears and packets leave the intended interface.

Question 193

Remote office replacement window. Field report: A fan module needs replacement in a live modular chassis. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Close after recording “Assume every fan in every Cisco chassis can be removed indefinitely while powered” without checking that cooling remains within limits and the new fan is detected healthy.
  2. Defer service verification after “Disable environmental alarms before assessing cooling impact” until the next reported incident.
  3. Perform or retain the approved action: check platform documentation for hot-swap support and the permitted replacement sequence; document evidence that cooling remains within limits and the new fan is detected healthy.
  4. Apply “Pull all cooling modules simultaneously to make room” as a substitute and declare success from shipment receipt alone.

Explanation

Correct Answer

C:

This handoff preserves the required corrective action and the verifiable service outcome. Hot-replaceability and allowable removal windows depend on the platform and redundancy state. Recording that cooling remains within limits and the new fan is detected healthy makes the signoff testable.

Incorrect Answers

A:

This proposes a different action with no acceptance evidence. “Assume every fan in every Cisco chassis can be removed indefinitely while powered” cannot replace the validated measure that cooling remains within limits and the new fan is detected healthy.

B:

A future incident is not a reasonable acceptance gate for a known problem. “Disable environmental alarms before assessing cooling impact” is not evidence that cooling remains within limits and the new fan is detected healthy.

D:

Delivery paperwork describes logistics, not recovered functionality. “Pull all cooling modules simultaneously to make room” leaves the technical requirement and its validation unresolved.

Question 194

Disaster-recovery facility inspection. Field report: A UCS architecture diagram shows a pair of fabric interconnects between blades and upstream networks. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm only that the work ticket says “completed,” without testing ucs fabric interconnect placement.
  2. Confirm only that the technician attempted: replace the san zoning database as the only ucs management component.
  3. Confirm the site inventory list still contains the hostname, without validating the reported service.
  4. Demonstrate that server connectivity and expected fabric roles in the UCS manager.

Explanation

Correct Answer

D:

Server connectivity and expected fabric roles in the UCS manager. Fabric interconnects mediate UCS networking and management relationships.

Incorrect Answers

A:

Check whether server connectivity and expected fabric roles in the UCS manager.

B:

For example, “Replace the SAN zoning database as the only UCS management component” does not demonstrate the corrected technical state.

C:

Confirm that server connectivity and expected fabric roles in the UCS manager.

Question 195

Main campus hardware-service ticket. Field report: An IPv6 endpoint needs the link-layer address of its on-link neighbor. A colleague proposes: “Rely on IPv4 ARP for IPv6 neighbor resolution.” Which technical assessment is best supported?

  1. The proposal overlooks the reported dependency: IPv6 uses ICMPv6 Neighbor Discovery rather than IPv4 ARP for on-link mapping.
  2. The original problem can be treated as resolved from inventory labels alone, without checking ipv6 neighbor discovery behavior.
  3. The proposed shortcut is sufficient because manually create a dns a record to serve as a neighbor advertisement.
  4. There is no need to validate the reported dependency once disable icmpv6 and expect discovery to remain fully functional.

Explanation

Correct Answer

A:

The alternative does not address the actual reported dependency. IPv6 uses ICMPv6 Neighbor Discovery rather than IPv4 ARP for on-link mapping. The supported intervention is use ipv6 neighbor discovery and verify neighbor state; acceptance should show that a reachable IPv6 neighbor cache entry for the next-hop address.

Incorrect Answers

B:

The failure described in the field report requires a functional check that a reachable IPv6 neighbor cache entry for the next-hop address.

C:

The proposed step “Manually create a DNS A record to serve as a Neighbor Advertisement” is not the required mechanism.

D:

It assumes an unrelated action establishes service recovery. Nothing about “Disable ICMPv6 and expect discovery to remain fully functional” demonstrates whether a reachable IPv6 neighbor cache entry for the next-hop address.

Question 196

Regional north-campus service window. Field report: An old UPS-backed network appliance includes a damaged battery pack. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm the site inventory list still contains the hostname, without validating the reported service.
  2. Demonstrate that the battery was isolated and transferred under the approved process.
  3. Confirm only that the work ticket says “completed,” without testing battery handling.
  4. Confirm only that the technician attempted: short the terminals to discharge it quickly.

Explanation

Correct Answer

B:

The battery was isolated and transferred under the approved process. Damaged battery packs require dedicated electrical and environmental handling.

Incorrect Answers

A:

Confirm that the battery was isolated and transferred under the approved process.

C:

Check whether the battery was isolated and transferred under the approved process.

D:

For example, “Short the terminals to discharge it quickly” does not demonstrate the corrected technical state.

Question 197

Customer branch-site maintenance. Field report: An ASR chassis has a failed redundant route processor while another remains active. Which action is the most defensible first step?

  1. Remove both route processors at once to accelerate recovery.
  2. Swap in an unapproved supervisor from a different chassis family.
  3. Review active/standby health and supported processor replacement procedure before maintenance.
  4. Treat a power LED as proof of stateful redundancy.

Explanation

Correct Answer

C:

Modular router redundancy and control-plane switchover must be preserved during service. The action should lead to evidence that standby processor joins with the expected role and software state.

Incorrect Answers

A:

This alternative would not solve the reported problem. Modular router redundancy and control-plane switchover must be preserved during service. The field team must instead establish whether standby processor joins with the expected role and software state.

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: an asr chassis has a failed redundant route processor while another remains active. The relevant control is review active/standby health and supported processor replacement procedure before maintenance.

D:

Attempting this shortcut is not an adequate substitute for the required action. Modular router redundancy and control-plane switchover must be preserved during service. Post-change evidence is still needed.

Question 198

Primary data-center night shift. Field report: A UCS fabric interconnect has failed and replacement must preserve server connectivity. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm only that the technician attempted: replace both fabric paths simultaneously without redundancy check.
  2. Confirm only that the work ticket says “completed,” without testing ucs fabric interconnect.
  3. Confirm the site inventory list still contains the hostname, without validating the reported service.
  4. Demonstrate that the replaced fabric joins its domain and server paths are healthy.

Explanation

Correct Answer

D:

The replaced fabric joins its domain and server paths are healthy. Fabric interconnects aggregate server connectivity and are integral to UCS domain operations.

Incorrect Answers

A:

For example, “Replace both fabric paths simultaneously without redundancy check” does not demonstrate the corrected technical state.

B:

Check whether the replaced fabric joins its domain and server paths are healthy.

C:

Confirm that the replaced fabric joins its domain and server paths are healthy.

Question 199

Headquarters wiring-closet visit. Field report: An on-premises phone loses service when one call-controller node becomes unavailable. A colleague proposes: “Assume a second Ethernet cable provides call-controller redundancy.” Which technical assessment is best supported?

  1. The proposal overlooks the reported dependency: High availability depends on supported call-control groups and registration behavior.
  2. The proposed shortcut is sufficient because remove the surviving node because registration is intermittent.
  3. There is no need to validate the reported dependency once configure a vlan name identical to the old call-controller hostname.
  4. The original problem can be treated as resolved from inventory labels alone, without checking redundant call control behavior.

Explanation

Correct Answer

A:

The alternative does not address the actual reported dependency. High availability depends on supported call-control groups and registration behavior. The supported intervention is validate configured call-control redundancy and endpoint failover behavior; acceptance should show that the endpoint continues or re-registers according to supported failover design.

Incorrect Answers

B:

The proposed step “Remove the surviving node because registration is intermittent” is not the required mechanism.

C:

It assumes an unrelated action establishes service recovery. Nothing about “Configure a VLAN name identical to the old call-controller hostname” demonstrates whether the endpoint continues or re-registers according to supported failover design.

D:

The failure described in the field report requires a functional check that the endpoint continues or re-registers according to supported failover design.

Question 200

Colocation site RMA handoff. Field report: An enterprise needs explicit policy enforcement at an untrusted perimeter. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Close after recording “Rely solely on an unmanaged access switch for application filtering” without checking that approved test flows pass and prohibited test flows are blocked by policy.
  2. Perform or retain the approved action: place a policy-enforcing firewall at the defined trust boundary; document evidence that approved test flows pass and prohibited test flows are blocked by policy.
  3. Apply “Use a passive cable coupler as an IP security enforcement point” as a substitute and declare success from shipment receipt alone.
  4. Defer service verification after “Disable routing so permitted applications cannot cross the perimeter” until the next reported incident.

Explanation

Correct Answer

B:

This handoff preserves the required corrective action and the verifiable service outcome. Firewall policy is the appropriate enforcement control for selected cross-boundary flows. Recording that approved test flows pass and prohibited test flows are blocked by policy makes the signoff testable.

Incorrect Answers

A:

This proposes a different action with no acceptance evidence. “Rely solely on an unmanaged access switch for application filtering” cannot replace the validated measure that approved test flows pass and prohibited test flows are blocked by policy.

C:

Delivery paperwork describes logistics, not recovered functionality. “Use a passive cable coupler as an IP security enforcement point” leaves the technical requirement and its validation unresolved.

D:

A future incident is not a reasonable acceptance gate for a known problem. “Disable routing so permitted applications cannot cross the perimeter” is not evidence that approved test flows pass and prohibited test flows are blocked by policy.

Supporting Cisco Devices for Field Technicians (800-150) Practice Tests