Question 510
A service chooses among cross-region disaster recovery strategies. The team confirms that the team documents RPO/RTO requirements but cannot demonstrate actual results. What should the solution architect recommend?
Explanation
Correct Answer
The scenario identifies this requirement: The team documents RPO/RTO requirements but cannot demonstrate actual results. Select Measure actual failover and data loss during controlled DR drills as the specified technical mechanism. Verified metrics reveal whether recovery objectives are met. This response addresses the problem described rather than a different design goal.
Incorrect Answers
The option Maintain a warm standby regional workload with replicating data addresses a separate condition: the application must resume within fifteen minutes using reduced standby capacity. Warm standby predeploys an operable reduced-scale stack. The actual requirement is the team documents RPO/RTO requirements but cannot demonstrate actual results. Recommended corrective action: Measure actual failover and data loss during controlled DR drills. Verified metrics reveal whether recovery objectives are met.
Choose backup-and-restore DR and test reconstruction steps would help if the business accepts twelve hours of downtime for rarely used reports. Infrequent workloads can trade recovery time for lower steady cost. That is not the symptom described here: the team documents RPO/RTO requirements but cannot demonstrate actual results. The matching response is Measure actual failover and data loss during controlled DR drills, because verified metrics reveal whether recovery objectives are met.
For the alternative failure recovery must occur within two hours while keeping only core data replicated, the control Use pilot light with automated scale-out for the recovery region is relevant: pilot-light architecture maintains minimal regional primitives. Here the evidence instead is the team documents RPO/RTO requirements but cannot demonstrate actual results. The selected technical mechanism is Measure actual failover and data loss during controlled DR drills: verified metrics reveal whether recovery objectives are met.