mcAfee Secure Website
23

Amazon AWS Certified DevOps Engineer - Professional DOP-C02 Bundle

Exam Code: AWS Certified DevOps Engineer - Professional DOP-C02

Exam Name AWS Certified DevOps Engineer - Professional DOP-C02

Certification Provider: Amazon

Corresponding Certification: AWS DevOps Engineer Professional

AWS Certified DevOps Engineer - Professional DOP-C02 Training Materials $25.00

Reliable & Actual Study Materials for AWS Certified DevOps Engineer - Professional DOP-C02 Exam Success

The Latest AWS Certified DevOps Engineer - Professional DOP-C02 Exam Questions as Experienced in the Actual Test!

  • 24
    Questions & Answers

    AWS Certified DevOps Engineer - Professional DOP-C02 Questions & Answers

    480 Questions & Answers

    Includes questions types found on actual exam such as drag and drop, simulation, type in, and fill in the blank.

  • 25
    AWS Certified DevOps Engineer - Professional DOP-C02 Video Course

    AWS Certified DevOps Engineer - Professional DOP-C02 Training Course

    242 Video Lectures

    Based on Real Life Scenarios which you will encounter in exam and learn by working with real equipment.

exam =32

AWS Certified DevOps Engineer - Professional DOP-C02 Practice Tests

Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Amazon Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Total Cost: $164.98
Bundle Price: $139.98

Purchase Individually

  • exam =34
    Questions & Answers

    Questions & Answers

    480 Questions

    $124.99
    exam =35
  • exam =37
    AWS Certified DevOps Engineer - Professional DOP-C02 Video Course

    Training Course

    242 Video Lectures

    $39.99

Amazon AWS Certified DevOps Engineer - Professional DOP-C02 Practice Test 45

Question 440

During a rapid feature release at a SaaS collaboration platform, the DevOps team discovers that tasks are abruptly killed during scale-in without honoring connection draining or graceful shutdown. The affected workload supports tenant application APIs and background jobs; the service must isolate tenants and handle fluctuating workloads. Which risk statement BEST explains why this design or process is unreliable?

  1. A single-AZ database becomes a critical point of failure and client applications may not reconnect correctly during failover.
  2. Increasing desired task count without sufficient underlying capacity or target registration can leave work pending during peak load.
  3. A single-AZ application or shared dependency can become unavailable during an AZ outage even when instances have local health checks.
  4. CPU-only policies may not respond to load patterns that exhaust per-target request capacity or cause unstable scaling.

Explanation

Correct Answer

B:

Correct. Increasing desired task count without sufficient underlying capacity or target registration can leave work pending during peak load. The observed problem is tasks are abruptly killed during scale-in without honoring connection draining or graceful shutdown; the exposure follows from the reported process or configuration, not merely from hypothetical unrelated failures. A targeted correction is: Scale ECS services with Application Auto Scaling and appropriate capacity provider strategy so tasks and backing EC2 capacity are available when needed.

Incorrect Answers

A:

A single-AZ database becomes a critical point of failure and client applications may not reconnect correctly during failover. The decisive diagnostic evidence must instead cover ecs service and capacity provider scaling.

C:

A single-AZ application or shared dependency can become unavailable during an AZ outage even when instances have local health checks. This observation would miss the actual ecs service and capacity provider scaling fault.

D:

CPU-only policies may not respond to load patterns that exhaust per-target request capacity or cause unstable scaling. That evidence would not isolate ecs service and capacity provider scaling.

Question 441

During a rapid feature release at a SaaS collaboration platform, the DevOps team discovers that tasks are abruptly killed during scale-in without honoring connection draining or graceful shutdown. The affected workload supports tenant application APIs and background jobs; the service must isolate tenants and handle fluctuating workloads. Which result BEST proves the remediation, rather than merely reporting installation success?

  1. Service scale tests show new tasks placed on suitable capacity, become healthy behind the load balancer and drain correctly on scale-in.
  2. During a simulated primary-Region outage, health-based routing directs new clients to a verified secondary service and end-to-end transactions succeed.
  3. A controlled overwrite and delete scenario demonstrates recoverable version history and the intended replicated objects without unauthorized permanent removal.
  4. A restoration from the target Region's protected recovery point completes an end-to-end application workflow within the approved time and data-loss window.

Explanation

Correct Answer

A:

Correct. Service scale tests show new tasks placed on suitable capacity, become healthy behind the load balancer and drain correctly on scale-in. This is observable evidence of successful remediation for tasks are abruptly killed during scale-in without honoring connection draining or graceful shutdown. A successful API call or a green installation indicator alone would not prove the affected tenant application APIs and background jobs operates correctly.

Incorrect Answers

B:

During a simulated primary-Region outage, health-based routing directs new clients to a verified secondary service and end-to-end transactions succeed. The relevant success criterion is ecs service and capacity provider scaling; this measures a different function.

C:

A controlled overwrite and delete scenario demonstrates recoverable version history and the intended replicated objects without unauthorized permanent removal. That result could pass without demonstrating ecs service and capacity provider scaling.

D:

A restoration from the target Region's protected recovery point completes an end-to-end application workflow within the approved time and data-loss window. Acceptance here depends on observing ecs service and capacity provider scaling, not only that test.

Question 442

During a high-traffic holiday release at an e-commerce company, the DevOps team discovers that a regional outage makes all available backup recovery points inaccessible because copies never leave the primary Region. The affected workload supports checkout and order history; a sudden traffic spike can directly affect purchase completion. What should the platform engineer implement FIRST to remove the specific failure mode?

  1. Use AWS Backup plans with suitable cross-Region copy actions and periodic restore testing to meet the application RPO and RTO requirements.
  2. Use EC2 Auto Scaling target tracking based on a workload-relevant metric such as ALBRequestCountPerTarget and validate capacity and scale-in safety.
  3. Buffer asynchronous work in Amazon SQS and scale consumers based on backlog with idempotent processing and dead-letter handling where appropriate.
  4. Scale ECS services with Application Auto Scaling and appropriate capacity provider strategy so tasks and backing EC2 capacity are available when needed.

Explanation

Correct Answer

A:

Correct. Use AWS Backup plans with suitable cross-Region copy actions and periodic restore testing to meet the application RPO and RTO requirements. The reported condition is that a regional outage makes all available backup recovery points inaccessible because copies never leave the primary Region. The design addresses the corresponding exposure: Local backups alone may not survive a Region failure, and successful backup jobs do not prove actual recoverability. Its effectiveness must be demonstrated by this result: A restoration from the target Region's protected recovery point completes an end-to-end application workflow within the approved time and data-loss window.

Incorrect Answers

B:

Use EC2 Auto Scaling target tracking based on a workload-relevant metric such as ALBRequestCountPerTarget and validate capacity and scale-in safety. That change would not implement cross-region AWS backup recovery policies.

C:

Buffer asynchronous work in Amazon SQS and scale consumers based on backlog with idempotent processing and dead-letter handling where appropriate. The configuration must instead establish cross-region AWS backup recovery policies.

D:

Scale ECS services with Application Auto Scaling and appropriate capacity provider strategy so tasks and backing EC2 capacity are available when needed. The cross-region AWS backup recovery policies prerequisite remains unaddressed.

Question 443

During a high-traffic holiday release at an e-commerce company, the DevOps team discovers that a regional outage makes all available backup recovery points inaccessible because copies never leave the primary Region. The affected workload supports checkout and order history; a sudden traffic spike can directly affect purchase completion. What is the PRIMARY risk of retaining this current implementation?

  1. A single-AZ application or shared dependency can become unavailable during an AZ outage even when instances have local health checks.
  2. A nominal recovery plan may exceed RTO when missing provisioning, networking, identity, startup order and application testing.
  3. Local backups alone may not survive a Region failure, and successful backup jobs do not prove actual recoverability.
  4. Replication does not replace immutable backups; mistaken deletes, corruption or credentials can spread across Regions without additional controls.

Explanation

Correct Answer

C:

Correct. Local backups alone may not survive a Region failure, and successful backup jobs do not prove actual recoverability. The observed problem is a regional outage makes all available backup recovery points inaccessible because copies never leave the primary Region; the exposure follows from the reported process or configuration, not merely from hypothetical unrelated failures. A targeted correction is: Use AWS Backup plans with suitable cross-Region copy actions and periodic restore testing to meet the application RPO and RTO requirements.

Incorrect Answers

A:

A single-AZ application or shared dependency can become unavailable during an AZ outage even when instances have local health checks. It does not retain the cross-region AWS backup recovery policies control over time.

B:

A nominal recovery plan may exceed RTO when missing provisioning, networking, identity, startup order and application testing. Recurrence here depends on cross-region AWS backup recovery policies, not this safeguard.

D:

Replication does not replace immutable backups; mistaken deletes, corruption or credentials can spread across Regions without additional controls. It protects a different risk than the cross-region AWS backup recovery policies requirement.

Question 444

During a high-traffic holiday release at an e-commerce company, the DevOps team discovers that a regional outage makes all available backup recovery points inaccessible because copies never leave the primary Region. The affected workload supports checkout and order history; a sudden traffic spike can directly affect purchase completion. What observed behavior would provide the STRONGEST operational verification?

  1. A load test increases producer rate, demonstrates bounded queue growth and confirms retries and dead-letter outcomes without duplicate business effects.
  2. A restoration from the target Region's protected recovery point completes an end-to-end application workflow within the approved time and data-loss window.
  3. During a simulated primary-Region outage, health-based routing directs new clients to a verified secondary service and end-to-end transactions succeed.
  4. A controlled RDS failover shows the standby is promoted and the application reconnects through the normal database endpoint within the approved interruption limit.

Explanation

Correct Answer

B:

Correct. A restoration from the target Region's protected recovery point completes an end-to-end application workflow within the approved time and data-loss window. This is observable evidence of successful remediation for a regional outage makes all available backup recovery points inaccessible because copies never leave the primary Region. A successful API call or a green installation indicator alone would not prove the affected checkout and order history operates correctly.

Incorrect Answers

A:

A load test increases producer rate, demonstrates bounded queue growth and confirms retries and dead-letter outcomes without duplicate business effects. Acceptance here depends on observing cross-region AWS backup recovery policies, not only that test.

C:

During a simulated primary-Region outage, health-based routing directs new clients to a verified secondary service and end-to-end transactions succeed. The relevant success criterion is cross-region AWS backup recovery policies; this measures a different function.

D:

A controlled RDS failover shows the standby is promoted and the application reconnects through the normal database endpoint within the approved interruption limit. That result could pass without demonstrating cross-region AWS backup recovery policies.

Question 445

During a security and availability review at a digital payments provider, the DevOps team discovers that an organization claims a 15-minute RPO from a daily backup schedule. The affected workload supports transaction authorization and reconciliation; availability and integrity are both required for financial settlement. Which automation approach BEST satisfies this operational requirement?

  1. Use EC2 Auto Scaling target tracking based on a workload-relevant metric such as ALBRequestCountPerTarget and validate capacity and scale-in safety.
  2. Use AWS Backup plans with suitable cross-Region copy actions and periodic restore testing to meet the application RPO and RTO requirements.
  3. Buffer asynchronous work in Amazon SQS and scale consumers based on backlog with idempotent processing and dead-letter handling where appropriate.
  4. Use appropriate Route 53 health checks and failover routing with a functioning secondary regional application and independent data dependencies.

Explanation

Correct Answer

B:

Correct. Use AWS Backup plans with suitable cross-Region copy actions and periodic restore testing to meet the application RPO and RTO requirements. The reported condition is that an organization claims a 15-minute RPO from a daily backup schedule. The design addresses the corresponding exposure: Local backups alone may not survive a Region failure, and successful backup jobs do not prove actual recoverability. Its effectiveness must be demonstrated by this result: A restoration from the target Region's protected recovery point completes an end-to-end application workflow within the approved time and data-loss window.

Incorrect Answers

A:

Use EC2 Auto Scaling target tracking based on a workload-relevant metric such as ALBRequestCountPerTarget and validate capacity and scale-in safety. The cross-region AWS backup recovery policies prerequisite remains unaddressed.

C:

Buffer asynchronous work in Amazon SQS and scale consumers based on backlog with idempotent processing and dead-letter handling where appropriate. That change would not implement cross-region AWS backup recovery policies.

D:

Use appropriate Route 53 health checks and failover routing with a functioning secondary regional application and independent data dependencies. The configuration must instead establish cross-region AWS backup recovery policies.

Question 446

During a security and availability review at a digital payments provider, the DevOps team discovers that an organization claims a 15-minute RPO from a daily backup schedule. The affected workload supports transaction authorization and reconciliation; availability and integrity are both required for financial settlement. Which adverse outcome is MOST closely tied to the reported gap?

  1. Replication does not replace immutable backups; mistaken deletes, corruption or credentials can spread across Regions without additional controls.
  2. Increasing desired task count without sufficient underlying capacity or target registration can leave work pending during peak load.
  3. Local backups alone may not survive a Region failure, and successful backup jobs do not prove actual recoverability.
  4. A nominal recovery plan may exceed RTO when missing provisioning, networking, identity, startup order and application testing.

Explanation

Correct Answer

C:

Correct. Local backups alone may not survive a Region failure, and successful backup jobs do not prove actual recoverability. The observed problem is an organization claims a 15-minute RPO from a daily backup schedule; the exposure follows from the reported process or configuration, not merely from hypothetical unrelated failures. A targeted correction is: Use AWS Backup plans with suitable cross-Region copy actions and periodic restore testing to meet the application RPO and RTO requirements.

Incorrect Answers

A:

Replication does not replace immutable backups; mistaken deletes, corruption or credentials can spread across Regions without additional controls. The relevant success criterion is cross-region AWS backup recovery policies; this measures a different function.

B:

Increasing desired task count without sufficient underlying capacity or target registration can leave work pending during peak load. That result could pass without demonstrating cross-region AWS backup recovery policies.

D:

A nominal recovery plan may exceed RTO when missing provisioning, networking, identity, startup order and application testing. It does not establish the requested cross-region AWS backup recovery policies outcome.

Question 447

During a security and availability review at a digital payments provider, the DevOps team discovers that an organization claims a 15-minute RPO from a daily backup schedule. The affected workload supports transaction authorization and reconciliation; availability and integrity are both required for financial settlement. Which acceptance result BEST demonstrates that the correction works?

  1. During a simulated primary-Region outage, health-based routing directs new clients to a verified secondary service and end-to-end transactions succeed.
  2. A restoration from the target Region's protected recovery point completes an end-to-end application workflow within the approved time and data-loss window.
  3. A controlled RDS failover shows the standby is promoted and the application reconnects through the normal database endpoint within the approved interruption limit.
  4. An approved AZ impairment test leaves customer requests served by healthy instances in the other AZ within the business threshold.

Explanation

Correct Answer

B:

Correct. A restoration from the target Region's protected recovery point completes an end-to-end application workflow within the approved time and data-loss window. This is observable evidence of successful remediation for an organization claims a 15-minute RPO from a daily backup schedule. A successful API call or a green installation indicator alone would not prove the affected transaction authorization and reconciliation operates correctly.

Incorrect Answers

A:

During a simulated primary-Region outage, health-based routing directs new clients to a verified secondary service and end-to-end transactions succeed. That result could pass without demonstrating cross-region AWS backup recovery policies.

C:

A controlled RDS failover shows the standby is promoted and the application reconnects through the normal database endpoint within the approved interruption limit. It does not establish the requested cross-region AWS backup recovery policies outcome.

D:

An approved AZ impairment test leaves customer requests served by healthy instances in the other AZ within the business threshold. The relevant success criterion is cross-region AWS backup recovery policies; this measures a different function.

Question 448

During a global rollout at a global logistics company, the DevOps team discovers that cross-Region backup jobs succeed but a restore test has never checked application dependencies. The affected workload supports shipment tracking and dispatch; customers expect continuous updates in several Regions. Which proposed solution is the most defensible response to the described system condition?

  1. Use appropriate Route 53 health checks and failover routing with a functioning secondary regional application and independent data dependencies.
  2. Use AWS Backup plans with suitable cross-Region copy actions and periodic restore testing to meet the application RPO and RTO requirements.
  3. Buffer asynchronous work in Amazon SQS and scale consumers based on backlog with idempotent processing and dead-letter handling where appropriate.
  4. Configure a supported Amazon RDS Multi-AZ deployment and test connection retry and automatic failover behavior to satisfy local database availability requirements.

Explanation

Correct Answer

B:

Correct. Use AWS Backup plans with suitable cross-Region copy actions and periodic restore testing to meet the application RPO and RTO requirements. The reported condition is that cross-Region backup jobs succeed but a restore test has never checked application dependencies. The design addresses the corresponding exposure: Local backups alone may not survive a Region failure, and successful backup jobs do not prove actual recoverability. Its effectiveness must be demonstrated by this result: A restoration from the target Region's protected recovery point completes an end-to-end application workflow within the approved time and data-loss window.

Incorrect Answers

A:

Use appropriate Route 53 health checks and failover routing with a functioning secondary regional application and independent data dependencies. The distinction tested is cross-region AWS backup recovery policies, not this concept.

C:

Buffer asynchronous work in Amazon SQS and scale consumers based on backlog with idempotent processing and dead-letter handling where appropriate. This category is separate from cross-region AWS backup recovery policies.

D:

Configure a supported Amazon RDS Multi-AZ deployment and test connection retry and automatic failover behavior to satisfy local database availability requirements. That describes Rds multi-az database failover, not cross-region AWS backup recovery policies.

Question 449

During a global rollout at a global logistics company, the DevOps team discovers that cross-Region backup jobs succeed but a restore test has never checked application dependencies. The affected workload supports shipment tracking and dispatch; customers expect continuous updates in several Regions. Select TWO statements that together specify the appropriate correction and the evidence of its success. (Select TWO.)

  1. Service scale tests show new tasks placed on suitable capacity, become healthy behind the load balancer and drain correctly on scale-in.
  2. Use EC2 Auto Scaling target tracking based on a workload-relevant metric such as ALBRequestCountPerTarget and validate capacity and scale-in safety.
  3. Use AWS Backup plans with suitable cross-Region copy actions and periodic restore testing to meet the application RPO and RTO requirements.
  4. A restoration from the target Region's protected recovery point completes an end-to-end application workflow within the approved time and data-loss window.
  5. Enable S3 versioning and suitable cross-Region replication with separately protected destination access and test object-version recovery.

Explanation

Correct Answers

C:

Correct implementation. Use AWS Backup plans with suitable cross-Region copy actions and periodic restore testing to meet the application RPO and RTO requirements. It addresses the specific condition that cross-Region backup jobs succeed but a restore test has never checked application dependencies and reduces the documented risk: Local backups alone may not survive a Region failure, and successful backup jobs do not prove actual recoverability.

D:

Correct independent verification. A restoration from the target Region's protected recovery point completes an end-to-end application workflow within the approved time and data-loss window. This demonstrates that the proposed implementation meets the required service behavior, rather than accepting a configuration change as proof by itself.

Incorrect Answers

A:

Service scale tests show new tasks placed on suitable capacity, become healthy behind the load balancer and drain correctly on scale-in. The cross-region AWS backup recovery policies implementation and safeguard are still missing.

B:

Use EC2 Auto Scaling target tracking based on a workload-relevant metric such as ALBRequestCountPerTarget and validate capacity and scale-in safety. It is not the complementary risk control for cross-region AWS backup recovery policies.

E:

Enable S3 versioning and suitable cross-Region replication with separately protected destination access and test object-version recovery. The two-part cross-region AWS backup recovery policies control remains unsatisfied.

Question 450

During a global rollout at a global logistics company, the DevOps team discovers that cross-Region backup jobs succeed but a restore test has never checked application dependencies. The affected workload supports shipment tracking and dispatch; customers expect continuous updates in several Regions. What test evidence would MOST convincingly validate the proposed solution?

  1. A restoration from the target Region's protected recovery point completes an end-to-end application workflow within the approved time and data-loss window.
  2. A full primary-isolation rehearsal provisions the planned recovery capacity and restores representative business transactions inside approved RTO and RPO.
  3. A controlled RDS failover shows the standby is promoted and the application reconnects through the normal database endpoint within the approved interruption limit.
  4. An approved AZ impairment test leaves customer requests served by healthy instances in the other AZ within the business threshold.

Explanation

Correct Answer

A:

Correct. A restoration from the target Region's protected recovery point completes an end-to-end application workflow within the approved time and data-loss window. This is observable evidence of successful remediation for cross-Region backup jobs succeed but a restore test has never checked application dependencies. A successful API call or a green installation indicator alone would not prove the affected shipment tracking and dispatch operates correctly.

Incorrect Answers

B:

A full primary-isolation rehearsal provisions the planned recovery capacity and restores representative business transactions inside approved RTO and RPO. That result could pass without demonstrating cross-region AWS backup recovery policies.

C:

A controlled RDS failover shows the standby is promoted and the application reconnects through the normal database endpoint within the approved interruption limit. Acceptance here depends on observing cross-region AWS backup recovery policies, not only that test.

D:

An approved AZ impairment test leaves customer requests served by healthy instances in the other AZ within the business threshold. It does not establish the requested cross-region AWS backup recovery policies outcome.