Question 380
During initial cabling the data-center rack uses short leads that put strain on the controller handles. Site acceptance governance review: The cause has been verified and the responsible change authority has approved corrective work. Which NEXT scoped response should the engineer choose?
Explanation
Correct Answer
This is the controlled correction: Replace with approved appropriately sized cables and a documented strain-relief route. The targeted response addresses the confirmed cause and has a defined, limited change scope. In this implementation case, During initial cabling the data-center rack uses short leads that put strain on the controller handles.
Incorrect Answers
This alternative proposes: Repeat the initial finding without an authorized corrective step: Measure supported cable length, bend radius, slack and service loops against the rack arrangement. The fault has already been confirmed; repeating diagnosis without remediating it does not meet the task. In this implementation case, During initial cabling the data-center rack uses short leads that put strain on the controller handles.
This alternative proposes: Stretch the short cables taut to meet the scheduled go-live date. This step would bypass the condition the approved remediation must protect. In this implementation case, During initial cabling the data-center rack uses short leads that put strain on the controller handles.
This alternative proposes: Configure LDAP group mapping before resolving physical cable strain. The nearby check or task does not directly correct the verified cause. In this implementation case, During initial cabling the data-center rack uses short leads that put strain on the controller handles.