mcAfee Secure Website
23

PMI PfMP Bundle

Exam Code: PfMP

Exam Name Portfolio Management Professional

Certification Provider: PMI

Corresponding Certification: PfMP

PfMP Training Materials $19.99

Reliable & Actual Study Materials for PfMP Exam Success

The Latest PfMP Exam Questions as Experienced in the Actual Test!

  • 24
    Questions & Answers

    PfMP Questions & Answers

    270 Questions & Answers

    Includes questions types found on actual exam such as drag and drop, simulation, type in, and fill in the blank.

  • exam =30
    Study Guide

    PfMP Study Guide

    492 PDF Pages

    Study Guide developed by industry experts who have written exams in the past. They are technology-specific IT certification researchers with at least a decade of experience at Fortune 500 companies.

exam =32

Portfolio Management Professional (PfMP) Practice Tests

Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable PMI Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Total Cost: $154.98
Bundle Price: $134.99

Purchase Individually

  • exam =34
    Questions & Answers

    Questions & Answers

    270 Questions

    $124.99
    exam =35
  • exam =36
    Study Guide

    Study Guide

    492 PDF Pages

    $29.99

PMI PfMP Practice Test 47

Question 460

In a separately governed portfolio decision exercise, a comparable condition is examined: A logistics group uses quarterly reports that conceal short-lived but material capacity overloads between reporting dates. A separate portfolio-control review recreates the same aggregate issue using the latest approved baselines. Once the concern is confirmed, what portfolio-level action is MOST defensible?

  1. Add threshold-driven capacity monitoring and escalation beyond the periodic reporting calendar.
  2. Report only quarter-end resource utilization when the peak demand conflicts appear mid-quarter.
  3. Continue examining the identified portfolio condition but make no decision even after it is confirmed: Check resource utilization time series, exception logs and the threshold defined by portfolio governance.
  4. Reallocate all portfolio funding indiscriminately across unrelated components to eliminate the isolated Monitor portfolio performance and alignment concern

Explanation

Correct Answer

A:

The controlled correction is: Add threshold-driven capacity monitoring and escalation beyond the periodic reporting calendar. It targets the reported requirement: In a separately governed portfolio decision exercise, a comparable condition is examined: A logistics group uses quarterly reports that conceal short-lived but material capacity overloads between reporting dates. The governing evidence supports this choice: Add threshold-driven capacity monitoring and escalation beyond the periodic reporting calendar.

Incorrect Answers

B:

This addresses a different part of the workflow: report only quarter-end resource utilization when the peak demand conflicts appear mid-quarter. The correction relevant to the described condition is add threshold-driven capacity monitoring and escalation beyond the periodic reporting calendar. The shortcut bypasses evidence, risk tolerance or authorization controls required in this situation.

C:

This addresses a different part of the workflow: continue examining the identified portfolio condition but make no decision even after it is confirmed: Check resource utilization time series, exception logs and the threshold defined by portfolio governance. The correction relevant to the described condition is add threshold-driven capacity monitoring and escalation beyond the periodic reporting calendar.

D:

This would broaden or bypass the intended change rather than address it safely: reallocate all portfolio funding indiscriminately across unrelated components to eliminate the isolated Monitor portfolio performance and alignment concern. The targeted action is add threshold-driven capacity monitoring and escalation beyond the periodic reporting calendar.

Question 461

A logistics transformation meets functional milestones but regional leaders refuse to release staff for implementation workshops. Different stakeholder groups have defined needs, influence and information-access rights. Which proposed shortcut should the portfolio manager REJECT as the LEAST defensible?

  1. Seek and implement the properly scoped portfolio response through authorized governance: Facilitate a joint engagement agreement linking time commitments and portfolio benefits, with accountable follow-up.
  2. Confirm the response through traceable acceptance evidence: Regional participation and agreed release time improve alongside tracked understanding of strategic benefits.
  3. Send additional reminder emails while ignoring managers' competing operational workload.
  4. Gather decision-relevant evidence before acting: Identify regional leaders' concerns, capacity conflicts and the demonstrated impact of nonparticipation.

Explanation

Correct Answer

C:

The shortcut to reject is: Send additional reminder emails while ignoring managers' competing operational workload. It would undermine the control in the reported case: A logistics transformation meets functional milestones but regional leaders refuse to release staff for implementation workshops. The governing evidence supports this choice: Send additional reminder emails while ignoring managers' competing operational workload.

Incorrect Answers

A:

The option describes a different design statement: seek and implement the properly scoped portfolio response through authorized governance: Facilitate a joint engagement agreement linking time commitments and portfolio benefits, with accountable follow-up. The shortcut that conflicts with the case is send additional reminder emails while ignoring managers' competing operational workload.

B:

This describes a way to verify a result, not a shortcut that defeats the control: confirm the response through traceable acceptance evidence: Regional participation and agreed release time improve alongside tracked understanding of strategic benefits. The question calls for rejecting send additional reminder emails while ignoring managers' competing operational workload. Demonstrating and recording the portfolio outcome strengthens assurance rather than defeating it.

D:

The option describes a different design statement: gather decision-relevant evidence before acting: Identify regional leaders' concerns, capacity conflicts and the demonstrated impact of nonparticipation. The shortcut that conflicts with the case is send additional reminder emails while ignoring managers' competing operational workload.

Question 462

In a separately governed portfolio decision exercise, a comparable condition is examined: A nonprofit creates new portfolio prioritization rules but program leaders continue using the retired scoring method. An independent engagement review reexamines the same communication concern under documented governance requirements. Which proposed shortcut should the portfolio manager REJECT as the LEAST defensible?

  1. Confirm the response through traceable acceptance evidence: A scored practice review and subsequent decisions correctly apply the updated prioritization method.
  2. Publish the revised scoring spreadsheet without explaining the changes to people who must apply it.
  3. Gather decision-relevant evidence before acting: Assess knowledge gaps, prior training materials and decisions that still use outdated criteria.
  4. Seek and implement the properly scoped portfolio response through authorized governance: Issue approved process guidance and interactive training, then verify application in upcoming reviews.

Explanation

Correct Answer

B:

The shortcut to reject is: Publish the revised scoring spreadsheet without explaining the changes to people who must apply it. It would undermine the control in the reported case: In a separately governed portfolio decision exercise, a comparable condition is examined: A nonprofit creates new portfolio prioritization rules but program leaders continue using the retired scoring method. The governing evidence supports this choice: Publish the revised scoring spreadsheet without explaining the changes to people who must apply it.

Incorrect Answers

A:

This describes a way to verify a result, not a shortcut that defeats the control: confirm the response through traceable acceptance evidence: A scored practice review and subsequent decisions correctly apply the updated prioritization method. The question calls for rejecting publish the revised scoring spreadsheet without explaining the changes to people who must apply it. Demonstrating and recording the portfolio outcome strengthens assurance rather than defeating it.

C:

The option describes a different design statement: gather decision-relevant evidence before acting: Assess knowledge gaps, prior training materials and decisions that still use outdated criteria. The shortcut that conflicts with the case is publish the revised scoring spreadsheet without explaining the changes to people who must apply it.

D:

The option describes a different design statement: seek and implement the properly scoped portfolio response through authorized governance: Issue approved process guidance and interactive training, then verify application in upcoming reviews. The shortcut that conflicts with the case is publish the revised scoring spreadsheet without explaining the changes to people who must apply it.

Question 463

In a separately governed portfolio decision exercise, a comparable condition is examined: A portfolio council's prior approval included a budget condition that a program now wants to ignore. A second authorized governance rehearsal tests the same concern before the next portfolio decision cycle. Once the concern is confirmed, what portfolio-level action is MOST defensible?

  1. Remove the budget condition from the project report because the sponsor regards it as impractical.
  2. Continue examining the identified portfolio condition but make no decision even after it is confirmed: Examine the original approval minutes, budget caps and the proposed deviation's aggregate impact.
  3. Reallocate all portfolio funding indiscriminately across unrelated components to eliminate the isolated Obtain authorization for portfolio decisions concern
  4. Seek an explicit conditional-approval amendment through the correct governance authority before execution.

Explanation

Correct Answer

D:

The controlled correction is: Seek an explicit conditional-approval amendment through the correct governance authority before execution. It targets the reported requirement: In a separately governed portfolio decision exercise, a comparable condition is examined: A portfolio council's prior approval included a budget condition that a program now wants to ignore. The governing evidence supports this choice: Seek an explicit conditional-approval amendment through the correct governance authority before execution.

Incorrect Answers

A:

This addresses a different part of the workflow: remove the budget condition from the project report because the sponsor regards it as impractical. The correction relevant to the described condition is seek an explicit conditional-approval amendment through the correct governance authority before execution. The shortcut bypasses evidence, risk tolerance or authorization controls required in this situation.

B:

This addresses a different part of the workflow: continue examining the identified portfolio condition but make no decision even after it is confirmed: Examine the original approval minutes, budget caps and the proposed deviation's aggregate impact. The correction relevant to the described condition is seek an explicit conditional-approval amendment through the correct governance authority before execution.

C:

This would broaden or bypass the intended change rather than address it safely: reallocate all portfolio funding indiscriminately across unrelated components to eliminate the isolated Obtain authorization for portfolio decisions concern. The targeted action is seek an explicit conditional-approval amendment through the correct governance authority before execution.

Question 464

In a separately governed portfolio decision exercise, a comparable condition is examined: An enterprise's executives separately rank modernization, acquisition and workforce resilience as their top priority. An independent strategy-review forum is conducting a comparable what-if analysis with an auditable decision trail. What is the most discriminating FIRST portfolio-level analysis to perform?

  1. Compare the approved strategic objectives, stakeholder trade-offs and decision-rights charter for resolving conflicting priorities.
  2. Implement the proposed portfolio change first and investigate its prerequisites afterwards: Run a structured ranking session using documented criteria and escalate unresolved trade-offs to the authorized governance body.
  3. Treat this post-decision success condition as sufficient evidence of the current root cause: A formally approved priority order with recorded trade-offs and consistent application to candidate investments.
  4. Use only the latest generic portfolio status color rather than inspect the specific decision data and assumptions for Rank competing strategic priorities

Explanation

Correct Answer

A:

The controlled correction is: Compare the approved strategic objectives, stakeholder trade-offs and decision-rights charter for resolving conflicting priorities. It targets the reported requirement: In a separately governed portfolio decision exercise, a comparable condition is examined: An enterprise's executives separately rank modernization, acquisition and workforce resilience as their top priority. The governing evidence supports this choice: Compare the approved strategic objectives, stakeholder trade-offs and decision-rights charter for resolving conflicting priorities.

Incorrect Answers

B:

This addresses a different part of the workflow: implement the proposed portfolio change first and investigate its prerequisites afterwards: Run a structured ranking session using documented criteria and escalate unresolved trade-offs to the authorized governance body. The correction relevant to the described condition is compare the approved strategic objectives, stakeholder trade-offs and decision-rights charter for resolving conflicting priorities.

C:

This would broaden or bypass the intended change rather than address it safely: treat this post-decision success condition as sufficient evidence of the current root cause: A formally approved priority order with recorded trade-offs and consistent application to candidate investments. The targeted action is compare the approved strategic objectives, stakeholder trade-offs and decision-rights charter for resolving conflicting priorities. A future acceptance condition does not substitute for an evidence-based initial diagnosis.

D:

This addresses a different part of the workflow: use only the latest generic portfolio status color rather than inspect the specific decision data and assumptions for Rank competing strategic priorities. The correction relevant to the described condition is compare the approved strategic objectives, stakeholder trade-offs and decision-rights charter for resolving conflicting priorities. A broad status indicator cannot resolve the specific criteria, risk, authority or dependency at issue.

Question 465

A regulated bank cannot reconstruct why a project was prioritized over a compliance alternative during a prior selection cycle. The board expects current evidence of combined portfolio value, capacity and delivery impact. Which proposed shortcut should the portfolio manager REJECT as the LEAST defensible?

  1. Seek and implement the properly scoped portfolio response through authorized governance: Implement a controlled portfolio decision register with immutable references to selection evidence and exceptions.
  2. Confirm the response through traceable acceptance evidence: A test audit can reproduce the ranking, approved exception and accountable decision maker from retained records.
  3. Delete preliminary alternatives after approval so auditors see only the final chosen score.
  4. Gather decision-relevant evidence before acting: Audit committee minutes, scoring versions, approvals, alternatives and the records-retention requirement.

Explanation

Correct Answer

C:

The shortcut to reject is: Delete preliminary alternatives after approval so auditors see only the final chosen score. It would undermine the control in the reported case: A regulated bank cannot reconstruct why a project was prioritized over a compliance alternative during a prior selection cycle. The governing evidence supports this choice: Delete preliminary alternatives after approval so auditors see only the final chosen score.

Incorrect Answers

A:

The option describes a different design statement: seek and implement the properly scoped portfolio response through authorized governance: Implement a controlled portfolio decision register with immutable references to selection evidence and exceptions. The shortcut that conflicts with the case is delete preliminary alternatives after approval so auditors see only the final chosen score. The controlling case detail is: A regulated bank cannot reconstruct why a project was prioritized over a compliance alternative during a prior selection cycle.

B:

This describes a way to verify a result, not a shortcut that defeats the control: confirm the response through traceable acceptance evidence: A test audit can reproduce the ranking, approved exception and accountable decision maker from retained records. The question calls for rejecting delete preliminary alternatives after approval so auditors see only the final chosen score. Demonstrating and recording the portfolio outcome strengthens assurance rather than defeating it.

D:

The option describes a different design statement: gather decision-relevant evidence before acting: Audit committee minutes, scoring versions, approvals, alternatives and the records-retention requirement. The shortcut that conflicts with the case is delete preliminary alternatives after approval so auditors see only the final chosen score. The controlling case detail is: A regulated bank cannot reconstruct why a project was prioritized over a compliance alternative during a prior selection cycle.

Question 466

A pharmaceutical group rejects a profitable initiative because it displaces a critical quality remediation program. The investment committee requires traceability to formally approved strategic objectives. Once the concern is confirmed, what portfolio-level action is MOST defensible?

  1. Hide the deferred initiative's upside because revealing it may weaken support for the recommended portfolio.
  2. Continue examining the identified portfolio condition but make no decision even after it is confirmed: Validate capacity conflicts, remediation commitments and the incremental benefit of the displaced initiative.
  3. Reallocate all portfolio funding indiscriminately across unrelated components to eliminate the isolated Recommend evidence-based portfolio mix concern
  4. Recommend the constrained portfolio mix with an explicit record of deferred opportunities and the value of compliance protection.

Explanation

Correct Answer

D:

The controlled correction is: Recommend the constrained portfolio mix with an explicit record of deferred opportunities and the value of compliance protection. It targets the reported requirement: A pharmaceutical group rejects a profitable initiative because it displaces a critical quality remediation program. The governing evidence supports this choice: Recommend the constrained portfolio mix with an explicit record of deferred opportunities and the value of compliance protection.

Incorrect Answers

A:

This addresses a different part of the workflow: hide the deferred initiative's upside because revealing it may weaken support for the recommended portfolio. The correction relevant to the described condition is recommend the constrained portfolio mix with an explicit record of deferred opportunities and the value of compliance protection. The shortcut bypasses evidence, risk tolerance or authorization controls required in this situation.

B:

This addresses a different part of the workflow: continue examining the identified portfolio condition but make no decision even after it is confirmed: Validate capacity conflicts, remediation commitments and the incremental benefit of the displaced initiative. The correction relevant to the described condition is recommend the constrained portfolio mix with an explicit record of deferred opportunities and the value of compliance protection. The controlling case detail is: A pharmaceutical group rejects a profitable initiative because it displaces a critical quality remediation program.

C:

This would broaden or bypass the intended change rather than address it safely: reallocate all portfolio funding indiscriminately across unrelated components to eliminate the isolated Recommend evidence-based portfolio mix concern. The targeted action is recommend the constrained portfolio mix with an explicit record of deferred opportunities and the value of compliance protection. The controlling case detail is: A pharmaceutical group rejects a profitable initiative because it displaces a critical quality remediation program.

Question 467

An airport authority's portfolio risk dashboard treats its board's low safety-risk tolerance as interchangeable with its higher innovation appetite. The organization requires aggregate exposure to remain within approved risk appetite. Which PORTFOLIO-management principle most appropriately governs the choice?

  1. Use an explicitly approved portfolio risk appetite and tolerances differentiated by strategic objective and risk category.
  2. Use the following undocumented shortcut as a governing principle: Apply the innovation group's higher loss tolerance to mandatory passenger-safety investments.
  3. Presume the desired portfolio decision is already justified and apply it without prerequisites: Define risk exposure limits and exception rules consistent with organizational and stakeholder tolerances, then seek governance approval.
  4. Replace the governing decision principle with only the final outcome check: An approved appetite-to-threshold map drives selection, escalation and reserve decisions by risk category.

Explanation

Correct Answer

A:

The governing principle is: Use an explicitly approved portfolio risk appetite and tolerances differentiated by strategic objective and risk category. It applies to the reported situation: An airport authority's portfolio risk dashboard treats its board's low safety-risk tolerance as interchangeable with its higher innovation appetite. The governing evidence supports this choice: Use an explicitly approved portfolio risk appetite and tolerances differentiated by strategic objective and risk category.

Incorrect Answers

B:

This might be an implementation step, but the question asks which rule governs the decision: use the following undocumented shortcut as a governing principle: Apply the innovation group's higher loss tolerance to mandatory passenger-safety investments. The controlling principle is use an explicitly approved portfolio risk appetite and tolerances differentiated by strategic objective and risk category. The shortcut contradicts the case safeguards and cannot justify a portfolio governance choice.

C:

This concerns a different architectural or operational consideration: presume the desired portfolio decision is already justified and apply it without prerequisites: Define risk exposure limits and exception rules consistent with organizational and stakeholder tolerances, then seek governance approval. The rule that matches the described situation is use an explicitly approved portfolio risk appetite and tolerances differentiated by strategic objective and risk category.

D:

This might be an implementation step, but the question asks which rule governs the decision: replace the governing decision principle with only the final outcome check: An approved appetite-to-threshold map drives selection, escalation and reserve decisions by risk category. The controlling principle is use an explicitly approved portfolio risk appetite and tolerances differentiated by strategic objective and risk category.

Question 468

In a separately governed portfolio decision exercise, a comparable condition is examined: A retail group has funding for only two of five digital initiatives, and customer-data dependencies differ between choices. An independent strategy-review forum is conducting a comparable what-if analysis with an auditable decision trail. Once the concern is confirmed, what portfolio-level action is MOST defensible?

  1. Continue examining the identified portfolio condition but make no decision even after it is confirmed: Check shared data prerequisites, scarce engineering capacity and combined benefit assumptions across proposed combinations.
  2. Reallocate all portfolio funding indiscriminately across unrelated components to eliminate the isolated Evaluate portfolio what-if scenarios concern
  3. Construct what-if scenarios that respect funding and dependency constraints and evaluate strategic value and downside risk.
  4. Select the two highest stand-alone scores without checking whether their dependencies can be met.

Explanation

Correct Answer

C:

The controlled correction is: Construct what-if scenarios that respect funding and dependency constraints and evaluate strategic value and downside risk. It targets the reported requirement: In a separately governed portfolio decision exercise, a comparable condition is examined: A retail group has funding for only two of five digital initiatives, and customer-data dependencies differ between choices. The governing evidence supports this choice: Construct what-if scenarios that respect funding and dependency constraints and evaluate strategic value and downside risk.

Incorrect Answers

A:

This addresses a different part of the workflow: continue examining the identified portfolio condition but make no decision even after it is confirmed: Check shared data prerequisites, scarce engineering capacity and combined benefit assumptions across proposed combinations. The correction relevant to the described condition is construct what-if scenarios that respect funding and dependency constraints and evaluate strategic value and downside risk.

B:

This would broaden or bypass the intended change rather than address it safely: reallocate all portfolio funding indiscriminately across unrelated components to eliminate the isolated Evaluate portfolio what-if scenarios concern. The targeted action is construct what-if scenarios that respect funding and dependency constraints and evaluate strategic value and downside risk.

D:

This would broaden or bypass the intended change rather than address it safely: select the two highest stand-alone scores without checking whether their dependencies can be met. The targeted action is construct what-if scenarios that respect funding and dependency constraints and evaluate strategic value and downside risk. The shortcut bypasses evidence, risk tolerance or authorization controls required in this situation.

Question 469

A transport operator evaluates two investments with equal returns but different correlated exposure to extreme-weather disruption. The investment committee requires traceability to formally approved strategic objectives. Which PORTFOLIO-management principle most appropriately governs the choice?

  1. Replace the governing decision principle with only the final outcome check: A scenario analysis showing aggregate risk appetite compliance and an evidence-based reason for the chosen component mix.
  2. Analyze aggregate scenario risk and correlation rather than comparing expected returns alone.
  3. Use the following undocumented shortcut as a governing principle: Choose solely by average return and ignore that both investments could fail under the same event.
  4. Presume the desired portfolio decision is already justified and apply it without prerequisites: Develop risk-adjusted portfolio scenarios that test correlation and concentration and document the preferred balance.

Explanation

Correct Answer

B:

The governing principle is: Analyze aggregate scenario risk and correlation rather than comparing expected returns alone. It applies to the reported situation: A transport operator evaluates two investments with equal returns but different correlated exposure to extreme-weather disruption. The governing evidence supports this choice: Analyze aggregate scenario risk and correlation rather than comparing expected returns alone.

Incorrect Answers

A:

This might be an implementation step, but the question asks which rule governs the decision: replace the governing decision principle with only the final outcome check: A scenario analysis showing aggregate risk appetite compliance and an evidence-based reason for the chosen component mix. The controlling principle is analyze aggregate scenario risk and correlation rather than comparing expected returns alone. For the stated question the stronger answer is: Analyze aggregate scenario risk and correlation rather than comparing expected returns alone.

C:

This might be an implementation step, but the question asks which rule governs the decision: use the following undocumented shortcut as a governing principle: Choose solely by average return and ignore that both investments could fail under the same event. The controlling principle is analyze aggregate scenario risk and correlation rather than comparing expected returns alone. The shortcut contradicts the case safeguards and cannot justify a portfolio governance choice.

D:

This concerns a different architectural or operational consideration: presume the desired portfolio decision is already justified and apply it without prerequisites: Develop risk-adjusted portfolio scenarios that test correlation and concentration and document the preferred balance. The rule that matches the described situation is analyze aggregate scenario risk and correlation rather than comparing expected returns alone. The recommendation requires analysis and approvals; it cannot substitute for the rule that should guide the decision.

Question 470

In a separately governed portfolio decision exercise, a comparable condition is examined: A construction portfolio is overweight in speculative developments even though the board has set a resilience minimum. A separate portfolio-control review recreates the same aggregate issue using the latest approved baselines. What is the most discriminating FIRST portfolio-level analysis to perform?

  1. Compare component exposure concentration, board minimums and risk-adjusted benefits in alternative mixes.
  2. Implement the proposed portfolio change first and investigate its prerequisites afterwards: Recommend a compliant balanced mix and defer or resize excess speculative projects for governance approval.
  3. Treat this post-decision success condition as sufficient evidence of the current root cause: A ratified portfolio mix meets the resilience floor and documents sacrificed return and risk reduction.
  4. Use only the latest generic portfolio status color rather than inspect the specific decision data and assumptions for Balance and prioritize portfolio components

Explanation

Correct Answer

A:

The controlled correction is: Compare component exposure concentration, board minimums and risk-adjusted benefits in alternative mixes. It targets the reported requirement: In a separately governed portfolio decision exercise, a comparable condition is examined: A construction portfolio is overweight in speculative developments even though the board has set a resilience minimum. The governing evidence supports this choice: Compare component exposure concentration, board minimums and risk-adjusted benefits in alternative mixes.

Incorrect Answers

B:

This addresses a different part of the workflow: implement the proposed portfolio change first and investigate its prerequisites afterwards: Recommend a compliant balanced mix and defer or resize excess speculative projects for governance approval. The correction relevant to the described condition is compare component exposure concentration, board minimums and risk-adjusted benefits in alternative mixes.

C:

This would broaden or bypass the intended change rather than address it safely: treat this post-decision success condition as sufficient evidence of the current root cause: A ratified portfolio mix meets the resilience floor and documents sacrificed return and risk reduction. The targeted action is compare component exposure concentration, board minimums and risk-adjusted benefits in alternative mixes. A future acceptance condition does not substitute for an evidence-based initial diagnosis.

D:

This addresses a different part of the workflow: use only the latest generic portfolio status color rather than inspect the specific decision data and assumptions for Balance and prioritize portfolio components. The correction relevant to the described condition is compare component exposure concentration, board minimums and risk-adjusted benefits in alternative mixes. A broad status indicator cannot resolve the specific criteria, risk, authority or dependency at issue.