Question 260
During an NVIDIA AI factory acceptance, engineers observe: A Base Command Manager cluster relies on one head node and loses both DHCP provisioning and Slurm scheduling whenever that node powers off. Which repair addresses the principal defect?
Explanation
Correct Answer
The appropriate intervention is Install and verify supported primary and secondary BCM head-node high availability with safe ownership transfer. The defining technical dependency is that BCM head-node services can be replicated to a passive peer but require compatible management, storage and failover configuration. Validate the correction by confirming that A tested head-node failure transfers expected critical services while nodes retain approved management and scheduling access.
Incorrect Answers
The related but distinct situation is “A BCM operator thinks the named primary head must always be active, even after the secondary has taken over successfully”. The appropriate intervention is Distinguish fixed primary/secondary identity from changing active/passive operational roles in HA validation. For the stated problem, “Install and verify supported primary and secondary BCM head-node high availability with safe ownership transfer” addresses the central condition.
This option serves the scenario “Two BCM head nodes both attempt to mount a shared writable filesystem during a simulated split-brain incident”. The direct fix is Configure supported HA fencing, quorum and shared-resource ownership protections before approving automated failover. The present scenario is distinguished by “Install and verify supported primary and secondary BCM head-node high availability with safe ownership transfer”.
This alternative addresses the separate case “A network partition causes a passive BCM head to see the active head as unreachable, and an operator immediately promotes it without quorum checks”. The appropriate intervention is Use the documented BCM HA quorum and split-brain prevention procedure before changing service ownership. The deciding requirement here is “Install and verify supported primary and secondary BCM head-node high availability with safe ownership transfer”.