mcAfee Secure Website
23

Microsoft AZ-801 Bundle

Exam Code: AZ-801

Exam Name Configuring Windows Server Hybrid Advanced Services

Certification Provider: Microsoft

Corresponding Certification: Microsoft Certified: Windows Server Hybrid Administrator Associate

AZ-801 Training Materials $25.00

Reliable & Actual Study Materials for AZ-801 Exam Success

The Latest AZ-801 Exam Questions as Experienced in the Actual Test!

  • 24
    Questions & Answers

    AZ-801 Questions & Answers

    326 Questions & Answers

    Includes questions types found on actual exam such as drag and drop, simulation, type in, and fill in the blank.

  • 25
    AZ-801 Video Course

    AZ-801 Training Course

    122 Video Lectures

    Based on Real Life Scenarios which you will encounter in exam and learn by working with real equipment.

exam =32

Configuring Windows Server Hybrid Advanced Services (AZ-801) Practice Tests

Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Microsoft Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Total Cost: $164.98
Bundle Price: $139.98

Purchase Individually

  • exam =34
    Questions & Answers

    Questions & Answers

    326 Questions

    $124.99
    exam =35
  • exam =37
    AZ-801 Video Course

    Training Course

    122 Video Lectures

    $39.99

Microsoft AZ-801 Practice Test 48

Question 470

An AZ-801 historical administration case reports: A recovery service is connected to the wrong source infrastructure and discovers no intended machines. Which TWO options together describe an appropriate response and a distinct verification? (Select TWO.)

  1. Exercise test failovers without harming production and collect actual RTO, RPO and consistency evidence for stakeholders.
  2. Apply Azure Site Recovery replication policies and virtual network mapping for the correct regions, recovery resource group and desired RPO.
  3. Configure Azure Site Recovery for eligible on-premises workloads with correct source prerequisites, target mapping and continuous replication health checks.
  4. A protected on-premises test workload replicates successfully and supports a non-disruptive test failover to its mapped target.
  5. A rehearsal confirms recovery groups execute in the required order, application tests pass and failback is documented.

Explanation

Correct Answers

C:

For A recovery service is connected to the wrong source infrastructure and discovers no intended machines, this action is the relevant response: Configure Azure Site Recovery for eligible on-premises workloads with correct source prerequisites, target mapping and continuous replication health checks. It reduces the risk that a registered on-premises machine without functional replication can give misleading confidence about disaster recovery coverage.

D:

This is an independent validation for the condition A recovery service is connected to the wrong source infrastructure and discovers no intended machines. The expected result is: A protected on-premises test workload replicates successfully and supports a non-disruptive test failover to its mapped target.

Incorrect Answers

A:

Asr drill safety rto and rpo observation: A recovery plan that has never been tested may exceed allowable downtime or data loss despite showing protected status. That mechanism alone cannot establish Azure site recovery on-premises replication readiness for this question.

B:

Azure site recovery vm replication and network mapping: Replicas started with incorrect target networks or unsupported policies may fail over but remain inaccessible to clients. That may be useful independently, but the missing requirement here is Azure site recovery on-premises replication readiness.

E:

Azure site recovery recovery plans and orderly orchestration: Starting dependent application tiers before DNS or databases can cause an incomplete recovery even when all VMs boot. Without demonstrating Azure site recovery on-premises replication readiness, that option does not satisfy the requested outcome.

Question 471

An enterprise Windows Server hybrid administration team finds: An Azure VM fails over to a test network that has no route to required domain controllers. The team must preserve authorized operations and recoverability while meeting the documented service constraints. What is the most defensible remediation for the observed failure?

  1. Apply Azure Site Recovery replication policies and virtual network mapping for the correct regions, recovery resource group and desired RPO.
  2. Configure Azure Site Recovery for eligible on-premises workloads with correct source prerequisites, target mapping and continuous replication health checks.
  3. Build ASR recovery plan groups to sequence infrastructure, identity, application and validation with controlled human or automation steps.
  4. Exercise test failovers without harming production and collect actual RTO, RPO and consistency evidence for stakeholders.

Explanation

Correct Answer

A:

The distinctive observation is: An Azure VM fails over to a test network that has no route to required domain controllers. The appropriate intervention is: Apply Azure Site Recovery replication policies and virtual network mapping for the correct regions, recovery resource group and desired RPO. This addresses the specific danger: Replicas started with incorrect target networks or unsupported policies may fail over but remain inaccessible to clients. Validate closure with: A non-disruptive test failover boots in the mapped recovery network and the application meets the agreed replication lag target.

Incorrect Answers

B:

Azure site recovery on-premises replication readiness: A registered on-premises machine without functional replication can give misleading confidence about disaster recovery coverage. That may be useful independently, but the missing requirement here is Azure site recovery vm replication and network mapping.

C:

Azure site recovery recovery plans and orderly orchestration: Starting dependent application tiers before DNS or databases can cause an incomplete recovery even when all VMs boot. Here the decisive check is Azure site recovery vm replication and network mapping, not that separate capability.

D:

Asr drill safety rto and rpo observation: A recovery plan that has never been tested may exceed allowable downtime or data loss despite showing protected status. The observed issue still requires Azure site recovery vm replication and network mapping; the proposed alternative tests another control.

Question 472

The recovery/security observation is: An Azure VM fails over to a test network that has no route to required domain controllers. Which acceptance test should be required before closing the finding?

  1. A non-disruptive test failover boots in the mapped recovery network and the application meets the agreed replication lag target.
  2. A protected on-premises test workload replicates successfully and supports a non-disruptive test failover to its mapped target.
  3. An isolated test failover documents elapsed recovery time, newest usable data point and safe cleanup of test resources.
  4. A rehearsal confirms recovery groups execute in the required order, application tests pass and failback is documented.

Explanation

Correct Answer

A:

The separate check for the condition An Azure VM fails over to a test network that has no route to required domain controllers is: A non-disruptive test failover boots in the mapped recovery network and the application meets the agreed replication lag target. It validates the control to apply Azure Site Recovery replication policies and virtual network mapping for the correct regions, recovery resource group and desired RPO. It verifies an operational result rather than a configuration entry alone.

Incorrect Answers

B:

Azure site recovery on-premises replication readiness: A registered on-premises machine without functional replication can give misleading confidence about disaster recovery coverage. That may be useful independently, but the missing requirement here is Azure site recovery vm replication and network mapping.

C:

Asr drill safety rto and rpo observation: A recovery plan that has never been tested may exceed allowable downtime or data loss despite showing protected status. Here the decisive check is Azure site recovery vm replication and network mapping, not that separate capability.

D:

Azure site recovery recovery plans and orderly orchestration: Starting dependent application tiers before DNS or databases can cause an incomplete recovery even when all VMs boot. The observed issue still requires Azure site recovery vm replication and network mapping; the proposed alternative tests another control.

Question 473

An enterprise Windows Server hybrid administration team finds: A recovery plan maps a sensitive production workload into an unrestricted public recovery subnet. The team must preserve authorized operations and recoverability while meeting the documented service constraints. Which supported administrative change best addresses this condition?

  1. Apply Azure Site Recovery replication policies and virtual network mapping for the correct regions, recovery resource group and desired RPO.
  2. Exercise test failovers without harming production and collect actual RTO, RPO and consistency evidence for stakeholders.
  3. Configure Azure Site Recovery for eligible on-premises workloads with correct source prerequisites, target mapping and continuous replication health checks.
  4. Build ASR recovery plan groups to sequence infrastructure, identity, application and validation with controlled human or automation steps.

Explanation

Correct Answer

A:

The distinctive observation is: A recovery plan maps a sensitive production workload into an unrestricted public recovery subnet. The appropriate intervention is: Apply Azure Site Recovery replication policies and virtual network mapping for the correct regions, recovery resource group and desired RPO. This addresses the specific danger: Replicas started with incorrect target networks or unsupported policies may fail over but remain inaccessible to clients. Validate closure with: A non-disruptive test failover boots in the mapped recovery network and the application meets the agreed replication lag target.

Incorrect Answers

B:

Asr drill safety rto and rpo observation: A recovery plan that has never been tested may exceed allowable downtime or data loss despite showing protected status. That may be useful independently, but the missing requirement here is Azure site recovery vm replication and network mapping.

C:

Azure site recovery on-premises replication readiness: A registered on-premises machine without functional replication can give misleading confidence about disaster recovery coverage. Here the decisive check is Azure site recovery vm replication and network mapping, not that separate capability.

D:

Azure site recovery recovery plans and orderly orchestration: Starting dependent application tiers before DNS or databases can cause an incomplete recovery even when all VMs boot. The observed issue still requires Azure site recovery vm replication and network mapping; the proposed alternative tests another control.

Question 474

The legacy Windows Server administration finding is: A recovery plan maps a sensitive production workload into an unrestricted public recovery subnet. Why is the observed configuration unacceptable?

  1. Starting dependent application tiers before DNS or databases can cause an incomplete recovery even when all VMs boot.
  2. A recovery plan that has never been tested may exceed allowable downtime or data loss despite showing protected status.
  3. Replicas started with incorrect target networks or unsupported policies may fail over but remain inaccessible to clients.
  4. A registered on-premises machine without functional replication can give misleading confidence about disaster recovery coverage.

Explanation

Correct Answer

C:

The issue is: A recovery plan maps a sensitive production workload into an unrestricted public recovery subnet. The material risk is that replicas started with incorrect target networks or unsupported policies may fail over but remain inaccessible to clients. The corrective control is to apply Azure Site Recovery replication policies and virtual network mapping for the correct regions, recovery resource group and desired RPO. Confirm through: A non-disruptive test failover boots in the mapped recovery network and the application meets the agreed replication lag target.

Incorrect Answers

A:

Azure site recovery recovery plans and orderly orchestration: Starting dependent application tiers before DNS or databases can cause an incomplete recovery even when all VMs boot. That mechanism alone cannot establish Azure site recovery vm replication and network mapping for this question.

B:

Asr drill safety rto and rpo observation: A recovery plan that has never been tested may exceed allowable downtime or data loss despite showing protected status. That may be useful independently, but the missing requirement here is Azure site recovery vm replication and network mapping.

D:

Azure site recovery on-premises replication readiness: A registered on-premises machine without functional replication can give misleading confidence about disaster recovery coverage. The observed issue still requires Azure site recovery vm replication and network mapping; the proposed alternative tests another control.

Question 475

An enterprise Windows Server hybrid administration team finds: A region-pair replication policy has a recovery-point retention window shorter than contract requirements. The team must preserve authorized operations and recoverability while meeting the documented service constraints. Which intervention should the team prioritize under these constraints?

  1. Apply Azure Site Recovery replication policies and virtual network mapping for the correct regions, recovery resource group and desired RPO.
  2. Exercise test failovers without harming production and collect actual RTO, RPO and consistency evidence for stakeholders.
  3. Configure Azure Site Recovery for eligible on-premises workloads with correct source prerequisites, target mapping and continuous replication health checks.
  4. Build ASR recovery plan groups to sequence infrastructure, identity, application and validation with controlled human or automation steps.

Explanation

Correct Answer

A:

The distinctive observation is: A region-pair replication policy has a recovery-point retention window shorter than contract requirements. The appropriate intervention is: Apply Azure Site Recovery replication policies and virtual network mapping for the correct regions, recovery resource group and desired RPO. This addresses the specific danger: Replicas started with incorrect target networks or unsupported policies may fail over but remain inaccessible to clients. Validate closure with: A non-disruptive test failover boots in the mapped recovery network and the application meets the agreed replication lag target.

Incorrect Answers

B:

Asr drill safety rto and rpo observation: A recovery plan that has never been tested may exceed allowable downtime or data loss despite showing protected status. That may be useful independently, but the missing requirement here is Azure site recovery vm replication and network mapping.

C:

Azure site recovery on-premises replication readiness: A registered on-premises machine without functional replication can give misleading confidence about disaster recovery coverage. Here the decisive check is Azure site recovery vm replication and network mapping, not that separate capability.

D:

Azure site recovery recovery plans and orderly orchestration: Starting dependent application tiers before DNS or databases can cause an incomplete recovery even when all VMs boot. The observed issue still requires Azure site recovery vm replication and network mapping; the proposed alternative tests another control.

Question 476

The recovery/security observation is: A region-pair replication policy has a recovery-point retention window shorter than contract requirements. Which acceptance test should be required before closing the finding?

  1. An isolated test failover documents elapsed recovery time, newest usable data point and safe cleanup of test resources.
  2. A protected on-premises test workload replicates successfully and supports a non-disruptive test failover to its mapped target.
  3. A rehearsal confirms recovery groups execute in the required order, application tests pass and failback is documented.
  4. A non-disruptive test failover boots in the mapped recovery network and the application meets the agreed replication lag target.

Explanation

Correct Answer

D:

The separate check for the condition A region-pair replication policy has a recovery-point retention window shorter than contract requirements is: A non-disruptive test failover boots in the mapped recovery network and the application meets the agreed replication lag target. It validates the control to apply Azure Site Recovery replication policies and virtual network mapping for the correct regions, recovery resource group and desired RPO. It verifies an operational result rather than a configuration entry alone.

Incorrect Answers

A:

Asr drill safety rto and rpo observation: A recovery plan that has never been tested may exceed allowable downtime or data loss despite showing protected status. That mechanism alone cannot establish Azure site recovery vm replication and network mapping for this question.

B:

Azure site recovery on-premises replication readiness: A registered on-premises machine without functional replication can give misleading confidence about disaster recovery coverage. That may be useful independently, but the missing requirement here is Azure site recovery vm replication and network mapping.

C:

Azure site recovery recovery plans and orderly orchestration: Starting dependent application tiers before DNS or databases can cause an incomplete recovery even when all VMs boot. Here the decisive check is Azure site recovery vm replication and network mapping, not that separate capability.

Question 477

An enterprise Windows Server hybrid administration team finds: An Azure Site Recovery protected VM reports chronic replication errors after a disk change. The team must preserve authorized operations and recoverability while meeting the documented service constraints. What is the strongest supported way to correct this operational weakness?

  1. Configure Azure Site Recovery for eligible on-premises workloads with correct source prerequisites, target mapping and continuous replication health checks.
  2. Apply Azure Site Recovery replication policies and virtual network mapping for the correct regions, recovery resource group and desired RPO.
  3. Build ASR recovery plan groups to sequence infrastructure, identity, application and validation with controlled human or automation steps.
  4. Exercise test failovers without harming production and collect actual RTO, RPO and consistency evidence for stakeholders.

Explanation

Correct Answer

B:

The distinctive observation is: An Azure Site Recovery protected VM reports chronic replication errors after a disk change. The appropriate intervention is: Apply Azure Site Recovery replication policies and virtual network mapping for the correct regions, recovery resource group and desired RPO. This addresses the specific danger: Replicas started with incorrect target networks or unsupported policies may fail over but remain inaccessible to clients. Validate closure with: A non-disruptive test failover boots in the mapped recovery network and the application meets the agreed replication lag target.

Incorrect Answers

A:

Azure site recovery on-premises replication readiness: A registered on-premises machine without functional replication can give misleading confidence about disaster recovery coverage. That mechanism alone cannot establish Azure site recovery vm replication and network mapping for this question.

C:

Azure site recovery recovery plans and orderly orchestration: Starting dependent application tiers before DNS or databases can cause an incomplete recovery even when all VMs boot. Here the decisive check is Azure site recovery vm replication and network mapping, not that separate capability.

D:

Asr drill safety rto and rpo observation: A recovery plan that has never been tested may exceed allowable downtime or data loss despite showing protected status. The observed issue still requires Azure site recovery vm replication and network mapping; the proposed alternative tests another control.

Question 478

The legacy Windows Server administration finding is: An Azure Site Recovery protected VM reports chronic replication errors after a disk change. Which risk is the main consequence of this finding?

  1. Starting dependent application tiers before DNS or databases can cause an incomplete recovery even when all VMs boot.
  2. Replicas started with incorrect target networks or unsupported policies may fail over but remain inaccessible to clients.
  3. A registered on-premises machine without functional replication can give misleading confidence about disaster recovery coverage.
  4. A recovery plan that has never been tested may exceed allowable downtime or data loss despite showing protected status.

Explanation

Correct Answer

B:

The issue is: An Azure Site Recovery protected VM reports chronic replication errors after a disk change. The material risk is that replicas started with incorrect target networks or unsupported policies may fail over but remain inaccessible to clients. The corrective control is to apply Azure Site Recovery replication policies and virtual network mapping for the correct regions, recovery resource group and desired RPO. Confirm through: A non-disruptive test failover boots in the mapped recovery network and the application meets the agreed replication lag target.

Incorrect Answers

A:

Azure site recovery recovery plans and orderly orchestration: Starting dependent application tiers before DNS or databases can cause an incomplete recovery even when all VMs boot. That mechanism alone cannot establish Azure site recovery vm replication and network mapping for this question.

C:

Azure site recovery on-premises replication readiness: A registered on-premises machine without functional replication can give misleading confidence about disaster recovery coverage. Here the decisive check is Azure site recovery vm replication and network mapping, not that separate capability.

D:

Asr drill safety rto and rpo observation: A recovery plan that has never been tested may exceed allowable downtime or data loss despite showing protected status. The observed issue still requires Azure site recovery vm replication and network mapping; the proposed alternative tests another control.

Question 479

An enterprise Windows Server hybrid administration team finds: A new production subnet is never included in the recovery virtual network mapping. The team must preserve authorized operations and recoverability while meeting the documented service constraints. Which corrective control best meets the stated recovery and security requirements?

  1. Apply Azure Site Recovery replication policies and virtual network mapping for the correct regions, recovery resource group and desired RPO.
  2. Build ASR recovery plan groups to sequence infrastructure, identity, application and validation with controlled human or automation steps.
  3. Configure Azure Site Recovery for eligible on-premises workloads with correct source prerequisites, target mapping and continuous replication health checks.
  4. Exercise test failovers without harming production and collect actual RTO, RPO and consistency evidence for stakeholders.

Explanation

Correct Answer

A:

The distinctive observation is: A new production subnet is never included in the recovery virtual network mapping. The appropriate intervention is: Apply Azure Site Recovery replication policies and virtual network mapping for the correct regions, recovery resource group and desired RPO. This addresses the specific danger: Replicas started with incorrect target networks or unsupported policies may fail over but remain inaccessible to clients. Validate closure with: A non-disruptive test failover boots in the mapped recovery network and the application meets the agreed replication lag target.

Incorrect Answers

B:

Azure site recovery recovery plans and orderly orchestration: Starting dependent application tiers before DNS or databases can cause an incomplete recovery even when all VMs boot. That may be useful independently, but the missing requirement here is Azure site recovery vm replication and network mapping.

C:

Azure site recovery on-premises replication readiness: A registered on-premises machine without functional replication can give misleading confidence about disaster recovery coverage. Here the decisive check is Azure site recovery vm replication and network mapping, not that separate capability.

D:

Asr drill safety rto and rpo observation: A recovery plan that has never been tested may exceed allowable downtime or data loss despite showing protected status. The observed issue still requires Azure site recovery vm replication and network mapping; the proposed alternative tests another control.

Question 480

An AZ-801 historical administration case reports: A new production subnet is never included in the recovery virtual network mapping. Which TWO choices provide the technical correction and a supporting acceptance test? (Select TWO.)

  1. Build ASR recovery plan groups to sequence infrastructure, identity, application and validation with controlled human or automation steps.
  2. An isolated test failover documents elapsed recovery time, newest usable data point and safe cleanup of test resources.
  3. Apply Azure Site Recovery replication policies and virtual network mapping for the correct regions, recovery resource group and desired RPO.
  4. Configure Azure Site Recovery for eligible on-premises workloads with correct source prerequisites, target mapping and continuous replication health checks.
  5. A non-disruptive test failover boots in the mapped recovery network and the application meets the agreed replication lag target.

Explanation

Correct Answers

C:

For A new production subnet is never included in the recovery virtual network mapping, this action is the relevant response: Apply Azure Site Recovery replication policies and virtual network mapping for the correct regions, recovery resource group and desired RPO. It reduces the risk that replicas started with incorrect target networks or unsupported policies may fail over but remain inaccessible to clients.

E:

This is an independent validation for the condition A new production subnet is never included in the recovery virtual network mapping. The expected result is: A non-disruptive test failover boots in the mapped recovery network and the application meets the agreed replication lag target.

Incorrect Answers

A:

Azure site recovery recovery plans and orderly orchestration: Starting dependent application tiers before DNS or databases can cause an incomplete recovery even when all VMs boot. That mechanism alone cannot establish Azure site recovery vm replication and network mapping for this question.

B:

Asr drill safety rto and rpo observation: A recovery plan that has never been tested may exceed allowable downtime or data loss despite showing protected status. That may be useful independently, but the missing requirement here is Azure site recovery vm replication and network mapping.

D:

Azure site recovery on-premises replication readiness: A registered on-premises machine without functional replication can give misleading confidence about disaster recovery coverage. The observed issue still requires Azure site recovery vm replication and network mapping; the proposed alternative tests another control.