Question 490
During an operational security assessment at a public-sector technology agency, the team documents this issue: An exclusive environment lock is configured but an alternate workflow bypasses it. The affected delivery process supports citizen applications and reusable infrastructure; accountability and service availability depend on controlled delivery. Select TWO: one corrective action and one test that confirms its effectiveness. (Select TWO.)
Explanation
Correct Answers
Correct corrective action. Use pipeline concurrency controls and deliberate cancellation rules to prevent conflicting deployments and redundant builds without terminating critical jobs. The action targets the recorded failure (An exclusive environment lock is configured but an alternate workflow bypasses it), and is intended to reduce the corresponding risk: Parallel runs against one mutable environment can cause race conditions, partial releases or resource waste.
Correct verification. Two queued production changes execute one at a time and cancellation behavior preserves active protected deployments. The measurement or controlled test provides evidence for the issue (An exclusive environment lock is configured but an alternate workflow bypasses it) and complements the selected corrective action rather than simply repeating a recommendation.
Incorrect Answers
Centralize versioned YAML templates for mandatory security and build steps, and require tested template adoption for dependent pipelines. This does not supply the required concurrency groups and cancellation policy action-and-control pair.
The same digest moves from a green build through staging to a protected production environment with recorded approval. The paired controls concern concurrency groups and cancellation policy, not that measure.
Use explicit branch and path trigger filters with tested PR triggers so only relevant changes run the intended pipeline actions. The two-part concurrency groups and cancellation policy control remains unsatisfied.