mcAfee Secure Website
exam =5
exam =6

Exam Code: JN0-364

Exam Name: Service Provider Routing and Switching, Specialist (JNCIS-SP)

Certification Provider: Juniper

Juniper JN0-364 Questions & Answers

Reliable & Actual Study Materials for JN0-364 Exam Success

69 Questions & Answers with Testing Engine

"JN0-364: Service Provider Routing and Switching, Specialist (JNCIS-SP)" Testing Engine covers all the knowledge points of the real Juniper JN0-364 exam.

The latest actual JN0-364 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at JN0-364 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Juniper Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Juniper JN0-364 Practice Test 68

Question 670

A provider creates a customer routing instance but assumes its routes will automatically be present in the master inet.0 table. Which technical distinction best describes the observed symptom?

  1. Root design issue: Routing instances isolate routing tables unless explicit import or export mechanisms connect them.
  2. The governing rule is: Address validity and martian filtering affect which route sources are considered acceptable.
  3. The key distinction is: Layered neighbor troubleshooting should separate transport from OSPF parameter mismatches.
  4. Protocol behavior: Summary advertisements require validation against their underlying active route policy.

Explanation

Correct Answer

A:

Correct diagnosis: Routing instances isolate routing tables unless explicit import or export mechanisms connect them. The appropriate action is: Define the intended route-leaking boundary between the customer's instance and the master routing table. The follow-up evidence required is: Each customer route is visible only in the tables approved by the design.

Incorrect Answers

B:

The alternative addresses an operator accepts a source-address block as an ordinary next-hop network even though the address is classified as martian, not the present root cause. Here the selected correction must reflect routing instances isolate routing tables unless explicit import or export mechanisms connect them. Test for: Each customer route is visible only in the tables approved by the design.

C:

This answer would be more suitable when a new OSPF uplink remains down at the adjacency stage after a router replacement, where the corrective action is to compare area, interface mode, timers, authentication and physical status on both endpoints. The failure here is different: Routing instances isolate routing tables unless explicit import or export mechanisms connect them. Required validation: Each customer route is visible only in the tables approved by the design.

D:

This option overlooks the decisive condition. Its supporting principle is summary advertisements require validation against their underlying active route policy, while this scenario depends on routing instances isolate routing tables unless explicit import or export mechanisms connect them. Verify the correction with: Each customer route is visible only in the tables approved by the design.

Question 671

An IS-IS neighbor appears only at Level 2 even though the design expects a Level 1 core segment. Which technical explanation and controlled action address the symptom?

  1. Cause: BGP group-level export policies must preserve customer routing isolation. Response: Split export policy by authorized customer scope and verify negative advertisements.
  2. Diagnosis: Common topology information can still produce direction-dependent shortest paths. Action: Compare path metrics and each router's route selection before altering LSP state.
  3. Explanation: Compatible IS-IS levels and area information determine available adjacency types. Repair: Compare interface level settings and area configuration.
  4. Fault mechanism: IS-IS advertises extensible routing attributes using TLV-encoded fields. Remediation: Identify TLVs as structured information within IS-IS protocol data units.

Explanation

Correct Answer

C:

The case turns on the distinction that compatible IS-IS levels and area information determine available adjacency types. Apply this concrete engineering step: Compare interface level settings and area configuration. An acceptable verification outcome is: The neighbor table shows the intended level and stable adjacency.

Incorrect Answers

A:

The proposed principle concerns another network fault: BGP group-level export policies must preserve customer routing isolation. Here, compatible IS-IS levels and area information determine available adjacency types. The most direct correction is to compare interface level settings and area configuration, confirmed by the neighbor table shows the intended level and stable adjacency.

B:

That result would be useful for a different failure, namely: An IS-IS link has asymmetric traffic despite synchronized LSPs and the engineer assumes the LSDB itself is corrupted. The current case specifically calls for: Compare interface level settings and area configuration. The required observed result is: The neighbor table shows the intended level and stable adjacency.

D:

Identify TLVs as structured information within IS-IS protocol data units is a relevant step for the separate scenario in which an operator calls an IS-IS TLV a transport packet and ignores its role in link-state information. It does not directly fix this case. Instead compare interface level settings and area configuration; verify: The neighbor table shows the intended level and stable adjacency.

Question 672

A loopback loses its MPLS-resolvable route but ordinary IP routing to the loopback remains reachable. Which technical explanation and controlled action address the symptom?

  1. Root issue: Instance-aware troubleshooting prevents a successful master-table probe from masking tenant isolation issues. Correction: Run route and connectivity checks in the explicitly intended routing instance.
  2. Cause: A usable IP path need not supply a suitable MPLS LSP or labeled transport path. Response: Inspect label-switched next-hop resolution separately from generic IP reachability.
  3. Diagnosis: Label-switching errors can occur even when control-plane endpoint reachability is good. Action: Inspect the incoming label, outgoing label and interface on each affected LSR.
  4. Explanation: Outer and inner labels can have distinct transport and service roles. Repair: Inspect the full MPLS label stack and outgoing label operation.

Explanation

Correct Answer

B:

Correct diagnosis: A usable IP path need not supply a suitable MPLS LSP or labeled transport path. The appropriate action is: Inspect label-switched next-hop resolution separately from generic IP reachability. The follow-up evidence required is: The labeled service route resolves after the intended LSP is restored.

Incorrect Answers

A:

This answer would be more suitable when a provider PE can ping a customer in the master instance but probes in the tenant routing instance fail, where the corrective action is to run route and connectivity checks in the explicitly intended routing instance. The failure here is different: A usable IP path need not supply a suitable MPLS LSP or labeled transport path. Required validation: The labeled service route resolves after the intended LSP is restored.

C:

Label-switching errors can occur even when control-plane endpoint reachability is good describes a neighboring protocol concern. In this case the controlling fact is a usable IP path need not supply a suitable MPLS LSP or labeled transport path. A correct remediation would inspect label-switched next-hop resolution separately from generic IP reachability and demonstrate: The labeled service route resolves after the intended LSP is restored.

D:

The proposed principle concerns another network fault: Outer and inner labels can have distinct transport and service roles. Here, a usable IP path need not supply a suitable MPLS LSP or labeled transport path. The most direct correction is to inspect label-switched next-hop resolution separately from generic IP reachability, confirmed by the labeled service route resolves after the intended LSP is restored.

Question 673

Two MSTP switches place the same VLAN into different instances due to region configuration drift. Which corrective action and confirmation pair is most appropriate?

  1. Implement: Review root protection at the provider-facing boundary. Verify: A superior BPDU test does not move the approved provider root.
  2. Control: Align region identity, revision and VLAN mapping as required. Accepted result: A region status check shows the intended shared instance mapping.
  3. Action: Separate provider service identification from customer VLAN identifiers. Evidence: The overlapping customer IDs remain isolated within their designated provider services.
  4. Repair: Inspect spanning-tree loop-protection events, root path and link state. Check: The corrected topology converges without opening an Ethernet loop.

Explanation

Correct Answer

B:

The selected response implements the principle that mSTP region agreement affects how instances interoperate across links. The engineer should align region identity, revision and VLAN mapping as required. Successful confirmation means: A region status check shows the intended shared instance mapping.

Incorrect Answers

A:

This response would target a different source scenario: A carrier attachment must not allow a customer switch to become the provider's root bridge. It cannot establish the current acceptance requirement, which is: A region status check shows the intended shared instance mapping. The relevant action is: Align region identity, revision and VLAN mapping as required.

C:

The alternative addresses two network services use identical customer VLAN IDs and the team assumes their frames must share one L2 broadcast domain, not the present root cause. Here the selected correction must reflect mSTP region agreement affects how instances interoperate across links. Test for: A region status check shows the intended shared instance mapping.

D:

This answer would be more suitable when an alternate uplink remains blocked after the primary path fails because expected BPDUs disappear, where the corrective action is to inspect spanning-tree loop-protection events, root path and link state. The failure here is different: MSTP region agreement affects how instances interoperate across links. Required validation: A region status check shows the intended shared instance mapping.

Question 674

A customer advertises an unauthorized more-specific and the PE propagates it across the provider core. What is the most defensible network engineering correction?

  1. Remediation: Inspect effective group and neighbor export policy evaluation order.
  2. Recommended change: Review EBGP multihop transport reachability and session parameters.
  3. Next step: Apply a safe approved OSPF process refresh and verify advertised router identity.
  4. Corrective action: Tighten customer import route filtering and test permitted prefix lengths.

Explanation

Correct Answer

D:

This option addresses the stated case rather than another networking issue. Principle: BGP edge hygiene protects the routing domain from unauthorized reachability. Remedy: Tighten customer import route filtering and test permitted prefix lengths. Proof: The unauthorized more-specific is rejected while approved aggregates remain.

Incorrect Answers

A:

Policy inheritance and term action order affect BGP route advertisement describes a neighboring protocol concern. In this case the controlling fact is bGP edge hygiene protects the routing domain from unauthorized reachability. A correct remediation would tighten customer import route filtering and test permitted prefix lengths and demonstrate: The unauthorized more-specific is rejected while approved aggregates remain.

B:

The proposed principle concerns another network fault: EBGP speakers separated by intermediate devices require deliberate transport reachability and hop policy. Here, bGP edge hygiene protects the routing domain from unauthorized reachability. The most direct correction is to tighten customer import route filtering and test permitted prefix lengths, confirmed by the unauthorized more-specific is rejected while approved aggregates remain.

C:

That result would be useful for a different failure, namely: A technician edits a router ID but tests immediately without accounting for established OSPF process state. The current case specifically calls for: Tighten customer import route filtering and test permitted prefix lengths. The required observed result is: The unauthorized more-specific is rejected while approved aggregates remain.

Question 675

A site complains an IRB gateway answers locally but the downstream VLAN has no remote MAC learning. Which underlying Junos networking principle explains the failure?

  1. Root design issue: MAC table visibility alone does not prove trunk authorization for every VLAN.
  2. The governing rule is: Ethernet forwarding uses bridge-domain context rather than arbitrary IP-route matching.
  3. The key distinction is: Loop protection can prevent unsafe forwarding when control-plane information is missing.
  4. Protocol behavior: A working IRB gateway does not validate all L2 paths and trunk members.

Explanation

Correct Answer

D:

The critical observation is: A working IRB gateway does not validate all L2 paths and trunk members. Correct it by taking this action: Trace trunk authorization, bridge-domain membership and MAC learning across the path. Confirm the outcome with: Both local and remote MACs learn in the intended bridge domain and hosts communicate.

Incorrect Answers

A:

The alternative addresses after a trunk change a MAC address is visible but only one of two VLANs can traverse the uplink, not the present root cause. Here the selected correction must reflect a working IRB gateway does not validate all L2 paths and trunk members. Test for: Both local and remote MACs learn in the intended bridge domain and hosts communicate.

B:

This answer would be more suitable when a port belongs to a VLAN but traffic to a remote site is forwarded through a different bridge domain, where the corrective action is to trace frame classification and virtual-switch bridge-domain association. The failure here is different: A working IRB gateway does not validate all L2 paths and trunk members. Required validation: Both local and remote MACs learn in the intended bridge domain and hosts communicate.

C:

This option overlooks the decisive condition. Its supporting principle is loop protection can prevent unsafe forwarding when control-plane information is missing, while this scenario depends on a working IRB gateway does not validate all L2 paths and trunk members. Verify the correction with: Both local and remote MACs learn in the intended bridge domain and hosts communicate.

Question 676

OSPF route preference changes after a new link is added and a latency-sensitive service takes the wrong path. Which root-cause explanation and corrective action fit the case?

  1. Cause: OSPF forwarding decisions depend on cumulative metric, not interface bandwidth labels alone. Response: Review each interface's OSPF metric and compare end-to-end computed costs.
  2. Diagnosis: OSPF network-type and Hello compatibility can prevent adjacency formation. Action: Verify compatible network and Hello parameters including mask where applicable.
  3. Explanation: Failover paths are governed by their actual configured metrics. Repair: Confirm the explicit cost plan in a failure rehearsal using route and topology outputs.
  4. Fault mechanism: Control-plane route visibility and installed forwarding state are distinct evidence. Remediation: Compare RIB selection with forwarding-table installation and next-hop resolution.

Explanation

Correct Answer

A:

This option addresses the stated case rather than another networking issue. Principle: OSPF forwarding decisions depend on cumulative metric, not interface bandwidth labels alone. Remedy: Review each interface's OSPF metric and compare end-to-end computed costs. Proof: A post-change route view selects the approved shortest path.

Incorrect Answers

B:

This response would target a different source scenario: A router sends OSPF Hello packets but remains stuck because the subnet mask differs across neighbors on a broadcast link. It cannot establish the current acceptance requirement, which is: A post-change route view selects the approved shortest path. The relevant action is: Review each interface's OSPF metric and compare end-to-end computed costs.

C:

Confirm the explicit cost plan in a failure rehearsal using route and topology outputs is a relevant step for the separate scenario in which an OSPF route appears longer than expected after failover because a backup link's cost was never verified. It does not directly fix this case. Instead review each interface's OSPF metric and compare end-to-end computed costs; verify: A post-change route view selects the approved shortest path.

D:

The alternative addresses a route appears in the routing table but an engineer assumes its presence proves it was installed into the forwarding table, not the present root cause. Here the selected correction must reflect oSPF forwarding decisions depend on cumulative metric, not interface bandwidth labels alone. Test for: A post-change route view selects the approved shortest path.

Question 677

An operator calls an IS-IS TLV a transport packet and ignores its role in link-state information. What action-and-test pairing directly resolves the case?

  1. Control: Compare path metrics and each router's route selection before altering LSP state. Accepted result: Each direction's active route matches the documented costs and design.
  2. Action: Identify TLVs as structured information within IS-IS protocol data units. Evidence: A protocol decode identifies the expected advertised TLV information.
  3. Repair: Review current DIS election rules for the network and protocol instance. Check: The LAN's DIS and pseudonode LSP match the documented protocol state.
  4. Change: Align the area membership and verify OSPF interface settings on both sides. Test: The peers progress to the expected adjacency state and exchange LSAs.

Explanation

Correct Answer

B:

The case turns on the distinction that iS-IS advertises extensible routing attributes using TLV-encoded fields. Apply this concrete engineering step: Identify TLVs as structured information within IS-IS protocol data units. An acceptable verification outcome is: A protocol decode identifies the expected advertised TLV information.

Incorrect Answers

A:

This option overlooks the decisive condition. Its supporting principle is common topology information can still produce direction-dependent shortest paths, while this scenario depends on iS-IS advertises extensible routing attributes using TLV-encoded fields. Verify the correction with: A protocol decode identifies the expected advertised TLV information.

C:

The proposed principle concerns another network fault: The designated system serves LAN pseudonode advertisement and election semantics. Here, iS-IS advertises extensible routing attributes using TLV-encoded fields. The most direct correction is to identify TLVs as structured information within IS-IS protocol data units, confirmed by a protocol decode identifies the expected advertised TLV information.

D:

That result would be useful for a different failure, namely: Two Junos routers on the same link have mismatched OSPF area identifiers and never form a neighbor relationship. The current case specifically calls for: Identify TLVs as structured information within IS-IS protocol data units. The required observed result is: A protocol decode identifies the expected advertised TLV information.

Question 678

An IS-IS LAN elects a new DIS and the engineer assumes the result must preempt every existing elected node. Which test result would best confirm a successful fix?

  1. Acceptance check: Each router is uniquely identified and the link-state database converges.
  2. The test confirms that the intended Level 1 or Level 2 adjacency forms with the expected topology scope.
  3. Expected observation: The backup next hop resolves and carries test traffic after the primary link fails.
  4. Verification result: The LAN's DIS and pseudonode LSP match the documented protocol state.

Explanation

Correct Answer

D:

This is the model-intended best choice because the designated system serves LAN pseudonode advertisement and election semantics. The targeted correction is to review current DIS election rules for the network and protocol instance. Validate it by observing that the LAN's DIS and pseudonode LSP match the documented protocol state.

Incorrect Answers

A:

Assign distinct stable router IDs and clear stale protocol state using an approved procedure is a relevant step for the separate scenario in which two routers advertise identical OSPF router IDs and their link-state information becomes inconsistent. It does not directly fix this case. Instead review current DIS election rules for the network and protocol instance; verify: The LAN's DIS and pseudonode LSP match the documented protocol state.

B:

The alternative addresses an IS-IS adjacency between two provider routers fails because their NET addresses encode incompatible area identifiers for a Level 1 relationship, not the present root cause. Here the selected correction must reflect the designated system serves LAN pseudonode advertisement and election semantics. Test for: The LAN's DIS and pseudonode LSP match the documented protocol state.

C:

This answer would be more suitable when a provider failover exposes an alternate IS-IS path that had never been tested for next-hop resolution, where the corrective action is to rehearse the failure and inspect active next hops and IS-IS route changes. The failure here is different: The designated system serves LAN pseudonode advertisement and election semantics. Required validation: The LAN's DIS and pseudonode LSP match the documented protocol state.

Question 679

A provider advertises a customer prefix with its own AS number already present in the return AS path. What is the most defensible network engineering correction?

  1. Remediation: Tighten customer import route filtering and test permitted prefix lengths.
  2. Recommended change: Investigate AS-path loop prevention rather than overriding it without risk review.
  3. Next step: Confirm the explicit cost plan in a failure rehearsal using route and topology outputs.
  4. Corrective action: Evaluate route reflection with defined cluster and client boundaries.

Explanation

Correct Answer

B:

The critical observation is: BGP AS-path information can prevent routes from looping into an AS. Correct it by taking this action: Investigate AS-path loop prevention rather than overriding it without risk review. Confirm the outcome with: The route is accepted only after the AS-path design is corrected.

Incorrect Answers

A:

The proposed principle concerns another network fault: BGP edge hygiene protects the routing domain from unauthorized reachability. Here, bGP AS-path information can prevent routes from looping into an AS. The most direct correction is to investigate AS-path loop prevention rather than overriding it without risk review, confirmed by the route is accepted only after the AS-path design is corrected.

C:

This response would target a different source scenario: An OSPF route appears longer than expected after failover because a backup link's cost was never verified. It cannot establish the current acceptance requirement, which is: The route is accepted only after the AS-path design is corrected. The relevant action is: Investigate AS-path loop prevention rather than overriding it without risk review.

D:

Evaluate route reflection with defined cluster and client boundaries is a relevant step for the separate scenario in which a small full-mesh iBGP design becomes difficult to maintain as dozens of PEs are added. It does not directly fix this case. Instead investigate AS-path loop prevention rather than overriding it without risk review; verify: The route is accepted only after the AS-path design is corrected.

Question 680

An OSPF route appears longer than expected after failover because a backup link's cost was never verified. What is the primary routing or switching concept illustrated?

  1. Root design issue: OSPF route selection follows each router's synchronized topology view.
  2. The governing rule is: Area mismatch can affect Level 1 adjacency even when packets are received.
  3. The key distinction is: Failover paths are governed by their actual configured metrics.
  4. Protocol behavior: OSPF forwarding decisions depend on cumulative metric, not interface bandwidth labels alone.

Explanation

Correct Answer

C:

This option addresses the stated case rather than another networking issue. Principle: Failover paths are governed by their actual configured metrics. Remedy: Confirm the explicit cost plan in a failure rehearsal using route and topology outputs. Proof: When the primary fails the documented backup path is selected without loops.

Incorrect Answers

A:

This answer would be more suitable when a site sees different OSPF routes after a topology edit and declares the protocol failed without checking LSDB consistency, where the corrective action is to inspect link-state databases and SPF output on affected routers. The failure here is different: Failover paths are governed by their actual configured metrics. Required validation: When the primary fails the documented backup path is selected without loops.

B:

This option overlooks the decisive condition. Its supporting principle is area mismatch can affect Level 1 adjacency even when packets are received, while this scenario depends on failover paths are governed by their actual configured metrics. Verify the correction with: When the primary fails the documented backup path is selected without loops.

D:

The proposed principle concerns another network fault: OSPF forwarding decisions depend on cumulative metric, not interface bandwidth labels alone. Here, failover paths are governed by their actual configured metrics. The most direct correction is to confirm the explicit cost plan in a failure rehearsal using route and topology outputs, confirmed by when the primary fails the documented backup path is selected without loops.