Question 670
During control-system design, the team learns that a team declares its production cell achieved target protection before testing installed controls. What specific risk follows?
Explanation
Correct Answer
The unmitigated condition can produce this failure; test remediation by confirming that test evidence supports the deployed controls for each applicable requirement.
Incorrect Answers
This describes the separate issue of Identification and authentication. For the current system, sL-A concerns demonstrated security achieved by the implemented system.
This failure can arise in Target security level, for example where a plant assigns controllers an SL-T after a design workshop but no risk-based rationale is recorded. Here the direct exposure is that a paper design can overstate realized protection.
That concern does not address the immediate risk: a paper design can overstate realized protection.