Question 270
An assessor is asked to advise on this site condition: A water utility wants to identify open ports on a running pump controller. What should the team prioritize?
Explanation
Correct Answer
Require vendor and operations approval, narrow targets, and a controlled active-testing plan. Active discovery may affect timing or availability and needs targeted authorization. The team can check its effectiveness by doing the following: Demonstrate signed scan scope, tested settings, monitoring, and an abort decision point.
Incorrect Answers
Map monitored interfaces and blind spots before relying on alerting for the affected zone. The plant scenario instead hinges on: Require vendor and operations approval, narrow targets, and a controlled active-testing plan.
Include physical access and maintenance pathways in the vulnerability assessment. The plant scenario instead hinges on: Require vendor and operations approval, narrow targets, and a controlled active-testing plan.
Request independently corroborated technical and operational evidence for the claimed control. The plant scenario instead hinges on: Require vendor and operations approval, narrow targets, and a controlled active-testing plan.