Question 20
The HPE AOS-CX switching case is: A facilities review rejects a proposed modular switch because power and airflow assumptions were not tested against the rack. Select TWO: a corrective switching action and separate evidence that the correction worked. (Select TWO.)
Explanation
Correct Answers
The targeted correction for A facilities review rejects a proposed modular switch because power and airflow assumptions were not tested against the rack is: Evaluate a modular 6400-class distribution switch where line-card expansion, resiliency, optics and maintenance requirements justify chassis architecture. It reduces the risk that an undersized fixed-port design can exhaust fiber terminations or require a disruptive wholesale replacement when the campus expands.
A separate operational validation for A facilities review rejects a proposed modular switch because power and airflow assumptions were not tested against the rack is: A module and transceiver map provides current and projected port capacity with power, cooling and resiliency allowances. It proves intended behavior instead of accepting configuration presence alone.
Incorrect Answers
This alternative concerns vsf versus vsx portfolio capabilities; its associated risk is: Treating VSX and VSF as synonymous can produce invalid cabling, platform selection and recovery expectations. The observed case A facilities review rejects a proposed modular switch because power and airflow assumptions were not tested against the rack requires the more specific 6400 chassis and modular distribution selection control. The targeted action is: Evaluate a modular 6400-class distribution switch where line-card expansion, resiliency, optics and maintenance requirements justify chassis architecture.
This alternative concerns switching management and deployment portfolio decision; its associated risk is: Assuming cloud management is automatically available without entitlements and management reachability can leave new switches unmanaged. The observed case A facilities review rejects a proposed modular switch because power and airflow assumptions were not tested against the rack requires the more specific 6400 chassis and modular distribution selection control. The targeted action is: Evaluate a modular 6400-class distribution switch where line-card expansion, resiliency, optics and maintenance requirements justify chassis architecture.
This alternative concerns optics interfaces and power portfolio constraints; its associated risk is: Unsupported optics or inadequate PoE and cooling may cause links to stay down even when a high-level product comparison looks acceptable. The observed case A facilities review rejects a proposed modular switch because power and airflow assumptions were not tested against the rack requires the more specific 6400 chassis and modular distribution selection control. The targeted action is: Evaluate a modular 6400-class distribution switch where line-card expansion, resiliency, optics and maintenance requirements justify chassis architecture.