Question 630
At Granite Chemical, the SOC wants a repeatable response to suspicious engineering workstation activity without stopping control loops. The relevant endpoint is reactor monitoring cell R-44; the engineering team can stage one representative test asset but not a production-wide cutover. A team instead proposes this shortcut for reactor monitoring cell R-44: “Quarantine an entire plant control VLAN whenever one engineering host alerts.” A controlled trial fails. Which explanation best identifies the underlying design defect?
Explanation
Correct Answer
Endpoint containment can reduce exposure, but should not inadvertently isolate the controllers required for process safety. The remedy is to use a constrained automation action on the workstation path and preserve an operator-controlled rollback procedure. Validate the new design by arranging this evidence: Show that the suspicious workstation loses unauthorized programming reach while autonomous PLC exchanges continue.
Incorrect Answers
An address pool change is not shown as the cause and would not resolve the documented reactor monitoring cell R-44 security design problem. The acceptance criterion tests: Show that the suspicious workstation loses unauthorized programming reach while autonomous PLC exchanges continue.
A management page loading cannot prove the intended industrial access restriction, detection, or protection works. Endpoint containment can reduce exposure, but should not inadvertently isolate the controllers required for process safety.
The owner-required controlled trial is meaningful; ignoring it conceals the unresolved issue for reactor monitoring cell R-44. A scoped correction is: Use a constrained automation action on the workstation path and preserve an operator-controlled rollback procedure.