Question 290
At Highland Transit, a multi-tenant site uses VDOMs but operators assume VDOM names alone deliver segmentation. The relevant endpoint is tunnel ventilation controller V-31; the risk register needs evidence that would be meaningful to a second reviewer. The operations owner is preparing the handoff for the change at tunnel ventilation controller V-31. Which record best supports continued safe operation and independent audit?
Explanation
Correct Answer
The handoff ties design, observed evidence, accountability and recovery to the specific controller. VDOMs separate FortiGate logical contexts but permitted communication still requires correct links, routing and firewall rules. Later engineers can reproduce or safely reverse the decision.
Incorrect Answers
A name alone cannot reconstruct which behavior was tested, which owner approved it, or what rollback means. Evidence required: Inspect VDOM-specific routes and prove that unapproved cross-context connections fail while the intended conduit works.
Shared secrets destroy accountability and create additional credential exposure. The site must retain least-privileged named access and a tested change record.
A global success claim conceals asset-level conditions and residual OT risk. The accepted design and verification need to remain traceable: Design explicit VDOM interfaces, routes and inter-VDOM links with separate policies for each approved traffic path. Inspect VDOM-specific routes and prove that unapproved cross-context connections fail while the intended conduit works.