Question 460
After the change "Run controlled primary-link failure and recovery tests after validating SD-WAN members and route dependencies", operators must validate the original complaint: A test branch's WAN upgrade succeeds but management declares production ready without testing failure of the preferred circuit. Which outcome is the strongest acceptance evidence?
Explanation
Correct Answer
Acceptance requires evidence that new test sessions recover through an approved backup path and revert according to documented behavior. The original problem was: A test branch's WAN upgrade succeeds but management declares production ready without testing failure of the preferred circuit. The team applied the remedy to run controlled primary-link failure and recovery tests after validating SD-WAN members and route dependencies. This outcome checks the actual security or connectivity effect, including the intended scope, rather than only proving that the candidate configuration saved or that a push job reported completion.
Incorrect Answers
New outbound sessions match the approved security rule and use permitted member links. That alternative is checked by updating the authorized internet policy to reference the correct SD-WAN zone and keeping inspection profiles attached; the actual requirement instead calls for confirming that new test sessions recover through an approved backup path and revert according to documented behavior.
Client internet access and required private-network separation both pass controlled tests. Reconciling SD-WAN zone assignments with least-privilege firewall rules for the migrated branch tests that mechanism, but it does not establish the reported condition—a test branch's WAN upgrade succeeds but management declares production ready without testing failure of the preferred circuit.
A fresh client session can be traced to its policy rule, selected member, and transport outcome. Its technical evidence involves enabling the approved logging or monitoring view needed to correlate sessions with chosen SD-WAN members. For the stated question, confirming that new test sessions recover through an approved backup path and revert according to documented behavior is the more relevant test.