Question 110
An operations team investigates this FortiSwitch 7.6 situation: An access ring suddenly floods after a maintenance team connects both ends of an unplanned loop. Select TWO complementary measures: the corrective action AND evidence that it worked.
Explanation
Correct Answer
The relevant acceptance proof for this incident (An access ring suddenly floods after a maintenance team connects both ends of an unplanned loop) is: The topology and STP or MCLAG diagnostics show intended links forwarding or blocked with no repeated loop events. That observation tests the same failure path that prompted the change, not merely whether a physical link is up. It also helps rule out the known alternative risk: A casually added secondary cable can bypass aggregation and STP design and create a broadcast loop. Retain the documented evidence after applying the associated correction: Configure and verify supported ISL or interchassis paths in the selected topology without creating uncontrolled parallel Layer 2 loops.
For the observed condition (An access ring suddenly floods after a maintenance team connects both ends of an unplanned loop), the appropriate response is to configure and verify supported ISL or interchassis paths in the selected topology without creating uncontrolled parallel Layer 2 loops. The underlying risk is that a casually added secondary cable can bypass aggregation and STP design and create a broadcast loop. This action is targeted to inter-switch link role and loop avoidance rather than to a different switching feature. Confirm it by checking that the topology and STP or MCLAG diagnostics show intended links forwarding or blocked with no repeated loop events.
Incorrect Answers
Mclag peer and icl planning addresses another technical failure: a dual-homed server cannot treat independent switches as a single LACP partner without supported multichassis coordination. This choice can be useful for that problem, but it does not establish the Inter-switch link role and loop avoidance control being assessed here.
Fortilink split-interface design addresses another technical failure: treating a FortiLink split interface as a general active-active LAG can create false resilience assumptions. This case instead tests Inter-switch link role and loop avoidance; the choice measures or changes another part of the system.
Lacp trunk membership would demonstrate or implement: LACP partner and member states show synchronized collecting/distributing ports and traffic survives loss of one member. The required paired action and test concerns Inter-switch link role and loop avoidance; a passing result for this alternative could leave that requirement unresolved.