mcAfee Secure Website
exam =5
exam =6

Exam Code: CCP

Exam Name: Certified CMMC Professional

Certification Provider: Cyber AB

Corresponding Certification: Certified CMMC Professional

Cyber AB CCP Questions & Answers

Reliable & Actual Study Materials for CCP Exam Success

201 Questions & Answers with Testing Engine

"CCP: Certified CMMC Professional" Testing Engine covers all the knowledge points of the real Cyber AB CCP exam.

The latest actual CCP Questions & Answers from Pass4sure. Everything you need to prepare and get best score at CCP exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cyber AB Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cyber AB CCP Practice Test 5

Question 40

At Mariner Contracting, a company plans to remove all safeguards because it heard that the July 2026 CMMC Phase II implementation was suspended. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Treat the Phase II pause as cancellation of every cybersecurity contract clause.
  2. Separate the Phase II rollout suspension from continuing Phase I and independent contractual cybersecurity obligations.
  3. Assume the credentialing program must have been terminated at the same time.
  4. Automatically mark all CUI security objectives as not applicable indefinitely.

Explanation

Correct Answer

B:

The 2026 announcement did not remove every underlying safeguarding or Phase I self-assessment duty. Validate by checking: Check the current DoD notice, the company's contract clauses and the still-applicable Phase I requirements.

Incorrect Answers

A:

For Mariner Contracting, “Treat the Phase II pause as cancellation of every cybersecurity contract clause” is not sufficient to establish the required control. The applicable action is Separate the Phase II rollout suspension from continuing Phase I and independent contractual cybersecurity obligations.

C:

The 2026 announcement did not remove every underlying safeguarding or Phase I self-assessment duty.

D:

Verify this with: Check the current DoD notice, the company's contract clauses and the still-applicable Phase I requirements.

Question 41

At Evervale Electronics, a government project laptop sometimes transmits FCI attachments through a corporate mail relay. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Ignore the mail relay because it only transmits and does not store messages long-term.
  2. Classify every internet router as automatically exempt without connectivity review.
  3. Include relevant endpoints and services in the FCI handling-flow assessment.
  4. Treat encryption as proof no systems ever process information.

Explanation

Correct Answer

C:

Assets that process, store or transmit FCI can belong to the applicable scope. Validate by checking: Trace a representative approved FCI email path and relevant services.

Incorrect Answers

A:

For Evervale Electronics, “Ignore the mail relay because it only transmits and does not store messages long-term” is not sufficient to establish the required control. The applicable action is Include relevant endpoints and services in the FCI handling-flow assessment.

B:

Assets that process, store or transmit FCI can belong to the applicable scope.

D:

Verify this with: Trace a representative approved FCI email path and relevant services.

Question 42

At Holloway Precision, a team has closed a deficiency locally but an independent confirmation step is still required. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Have the implementer self-sign the final certification determination.
  2. Hide the earlier finding so no one can compare before-and-after evidence.
  3. Submit the evidence to the authorized review and final reporting process.
  4. Replace the formal review with a private messaging acknowledgement.

Explanation

Correct Answer

C:

The assessor role and approved closure procedure remain necessary after technical remediation. Validate by checking: Preserve the original finding, accepted remediation proof and authorized disposition.

Incorrect Answers

A:

For Holloway Precision, “Have the implementer self-sign the final certification determination” is not sufficient to establish the required control. The applicable action is Submit the evidence to the authorized review and final reporting process.

B:

The assessor role and approved closure procedure remain necessary after technical remediation.

D:

Verify this with: Preserve the original finding, accepted remediation proof and authorized disposition.

Question 43

At Dunecrest Manufacturing, a planning call reveals a team member worked as a paid consultant for the OSC on the same controls. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Escalate the conflict disclosure and assign work only after documented conflict review.
  2. Assign the consultant to review only the controls they implemented without disclosure.
  3. Delete the member's employment history from the plan.
  4. Ask the OSC to conceal the consulting relationship from the C3PAO.

Explanation

Correct Answer

A:

Independence and fairness need to be resolved in planning, not hidden during fieldwork. Validate by checking: Check the conflict register and final authorized assessment-team assignment.

Incorrect Answers

B:

For Dunecrest Manufacturing, “Assign the consultant to review only the controls they implemented without disclosure” is not sufficient to establish the required control. The applicable action is Escalate the conflict disclosure and assign work only after documented conflict review.

C:

Independence and fairness need to be resolved in planning, not hidden during fieldwork.

D:

Verify this with: Check the conflict register and final authorized assessment-team assignment.

Question 44

At Northpoint Engineering, a control looks technically implemented but its evidence packet does not identify the relevant CMMC practice. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Count file names instead of mapping proof to objectives.
  2. Assume an assessor can guess the right practice from a screenshot.
  3. Label and cross-reference the artifact to the precise objective, owner, and scoped assets.
  4. Discard a valid control solely because the documentation is imperfect.

Explanation

Correct Answer

C:

Traceability is needed so reviewers can evaluate what each artifact actually demonstrates. Validate by checking: Confirm an objective-by-evidence index with verified scoped context.

Incorrect Answers

A:

For Northpoint Engineering, “Count file names instead of mapping proof to objectives” is not sufficient to establish the required control. The applicable action is Label and cross-reference the artifact to the precise objective, owner, and scoped assets.

B:

Traceability is needed so reviewers can evaluate what each artifact actually demonstrates.

D:

Verify this with: Confirm an objective-by-evidence index with verified scoped context.

Question 45

At Stonefield Communications, a supplier has open deficiencies and asks whether a purchase order automatically resolves the POA&M. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Accept a procurement intent as completed technical remediation.
  2. Evaluate any permissible POA&M treatment and closure evidence under the current program rules.
  3. Ignore all limits on permissible POA&M items under the current rule.
  4. Remove the deficient practice from the assessment scope without approval.

Explanation

Correct Answer

B:

A plan or purchase order is not proof that an underlying requirement is implemented. Validate by checking: Record permissible status, responsible owner, deadline and verified closure evidence.

Incorrect Answers

A:

For Stonefield Communications, “Accept a procurement intent as completed technical remediation” is not sufficient to establish the required control. The applicable action is Evaluate any permissible POA&M treatment and closure evidence under the current program rules.

C:

A plan or purchase order is not proof that an underlying requirement is implemented.

D:

Verify this with: Record permissible status, responsible owner, deadline and verified closure evidence.

Question 46

At Dunecrest Manufacturing, a review team sees that a contractor implemented one part of a multi-objective CMMC practice but cannot evidence the others. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Map the practice's assessment objectives individually and evaluate the full applicable criteria.
  2. Declare the entire practice met when any single objective is satisfied.
  3. Skip a difficult objective because another department owns it.
  4. Treat a vendor's compliance claim as a substitute for all missing proof.

Explanation

Correct Answer

A:

A complete assessment requires demonstrating each applicable objective rather than a subset. Validate by checking: Create an objective-by-objective evidence matrix showing which requirements are met.

Incorrect Answers

B:

For Dunecrest Manufacturing, “Declare the entire practice met when any single objective is satisfied” is not sufficient to establish the required control. The applicable action is Map the practice's assessment objectives individually and evaluate the full applicable criteria.

C:

A complete assessment requires demonstrating each applicable objective rather than a subset.

D:

Verify this with: Create an objective-by-objective evidence matrix showing which requirements are met.

Question 47

At Evervale Electronics, marketing staff can post screenshots from an FCI processing system to a public website without review. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Assume every image is unrestricted if it has no visible CUI banner.
  2. Disable website logging instead of reviewing uploaded content.
  3. Let a developer publish all screenshots while procurement is offline.
  4. Establish a review control preventing unauthorized public posting of nonpublic federal information.

Explanation

Correct Answer

D:

Publicly accessible content requires approved release decisions before publication. Validate by checking: Verify an authorized review step and absence of prohibited content in public locations.

Incorrect Answers

A:

For Evervale Electronics, “Assume every image is unrestricted if it has no visible CUI banner” is not sufficient to establish the required control. The applicable action is Establish a review control preventing unauthorized public posting of nonpublic federal information.

B:

Publicly accessible content requires approved release decisions before publication.

C:

Verify this with: Verify an authorized review step and absence of prohibited content in public locations.

Question 48

At Redstone Research, an OSC wants to omit service-provider-managed network devices from an FCI boundary without reviewing their function. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Exclude all equipment on a provider invoice without inspecting dataflow.
  2. Include only physical servers located on the OSC premises.
  3. Assume a service contract automatically satisfies all CMMC practices.
  4. Include or justify treatment of relevant external network and security services in the scope analysis.

Explanation

Correct Answer

D:

Responsibility boundaries require factual mapping, not automatic exclusion by vendor ownership. Validate by checking: Document data pathways, service roles and contractor/provider responsibilities.

Incorrect Answers

A:

For Redstone Research, “Exclude all equipment on a provider invoice without inspecting dataflow” is not sufficient to establish the required control. The applicable action is Include or justify treatment of relevant external network and security services in the scope analysis.

B:

Responsibility boundaries require factual mapping, not automatic exclusion by vendor ownership.

C:

Verify this with: Document data pathways, service roles and contractor/provider responsibilities.

Question 49

At Dunecrest Manufacturing, a small contractor asks whether Level 1 and Level 2 have identical underlying security requirements. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Assume the 17 Level 1 practices replace all Level 2 requirements for CUI.
  2. Assume a Level 2 assessment always requires all NIST SP 800-172 enhanced requirements.
  3. Choose the level from the contractor's marketing budget rather than contract and information scope.
  4. Distinguish Level 1 basic FCI safeguarding from Level 2 requirements aligned to NIST SP 800-171 Revision 2 under the current rule.

Explanation

Correct Answer

D:

The two levels address different information classes and baseline safeguards. Validate by checking: Verify the contractual level, FCI/CUI scope, and the correct published requirements.

Incorrect Answers

A:

For Dunecrest Manufacturing, “Assume the 17 Level 1 practices replace all Level 2 requirements for CUI” is not sufficient to establish the required control. The applicable action is Distinguish Level 1 basic FCI safeguarding from Level 2 requirements aligned to NIST SP 800-171 Revision 2 under the current rule.

B:

The two levels address different information classes and baseline safeguards.

C:

Verify this with: Verify the contractual level, FCI/CUI scope, and the correct published requirements.

Question 50

At Evervale Electronics, a project manager needs the official CMMC Level 2 scoping categories and sends a 2021 webinar transcript instead. The review team must protect the integrity of any information it handles and stay within its authorized CMMC role. Which action is most appropriate as the immediate next step for this issue?

  1. Use the transcript because its examples are easier to understand.
  2. Refer to the current Level 2 Scoping Guidance and controlling 32 CFR Part 170 text.
  3. Declare the boundary solely from the finance team's inventory.
  4. Copy another contractor's scope diagram without checking actual data flows.

Explanation

Correct Answer

B:

Scoping categories and asset treatment must follow authoritative current guidance. Validate by checking: Verify the system boundary against current published guidance and documented assets.

Incorrect Answers

A:

For Evervale Electronics, “Use the transcript because its examples are easier to understand” is not sufficient to establish the required control. The applicable action is Refer to the current Level 2 Scoping Guidance and controlling 32 CFR Part 170 text.

C:

Scoping categories and asset treatment must follow authoritative current guidance.

D:

Verify this with: Verify the system boundary against current published guidance and documented assets.