mcAfee Secure Website
exam =5
exam =6

Exam Code: 800-150

Exam Name: Supporting Cisco Devices for Field Technicians

Certification Provider: Cisco

Cisco 800-150 Questions & Answers

Reliable & Actual Study Materials for 800-150 Exam Success

100 Questions & Answers with Testing Engine

"800-150: Supporting Cisco Devices for Field Technicians" Testing Engine covers all the knowledge points of the real Cisco 800-150 exam.

The latest actual 800-150 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at 800-150 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cisco Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cisco 800-150 Practice Test 67

Question 660

Customer branch-site maintenance. Field report: An old Meraki switch is returned and its replacement must inherit the intended deployment. Which action is the most defensible first step?

  1. Leave the failed and replacement devices indistinguishable in inventory.
  2. Reuse the failed device serial as a fake label for the new unit.
  3. Record and reconcile both serials using the documented RMA/inventory workflow.
  4. Treat a switch port description as the dashboard hardware identity.

Explanation

Correct Answer

C:

Meraki inventory and RMA reconciliation are keyed to device serials. The action should lead to evidence that the old and new serial associations and correct dashboard network state.

Incorrect Answers

A:

That change addresses a different aspect of the environment and leaves this requirement unresolved: an old meraki switch is returned and its replacement must inherit the intended deployment. The relevant control is record and reconcile both serials using the documented rma/inventory workflow.

B:

This alternative would not solve the reported problem. Meraki inventory and RMA reconciliation are keyed to device serials. The field team must instead establish whether the old and new serial associations and correct dashboard network state.

D:

Attempting this shortcut is not an adequate substitute for the required action. Meraki inventory and RMA reconciliation are keyed to device serials. Post-change evidence is still needed.

Question 661

Primary data-center night shift. Field report: A spare switch needs a validated baseline configuration with different hardware port layout. Which action is the most defensible first step?

  1. Paste the entire old configuration blindly onto incompatible hardware.
  2. Copy the old chassis serial number into new device flash.
  3. Skip post-restore testing because the config was valid on another model.
  4. Adapt and review the approved backup for compatible interfaces before controlled application.

Explanation

Correct Answer

D:

Interface mappings and feature support may differ between hardware versions. The action should lead to evidence that the restored device implements approved settings and operational ports.

Incorrect Answers

A:

This alternative would not solve the reported problem. Interface mappings and feature support may differ between hardware versions. The field team must instead establish whether the restored device implements approved settings and operational ports.

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a spare switch needs a validated baseline configuration with different hardware port layout. The relevant control is adapt and review the approved backup for compatible interfaces before controlled application.

C:

Attempting this shortcut is not an adequate substitute for the required action. Interface mappings and feature support may differ between hardware versions. Post-change evidence is still needed.

Question 662

Headquarters wiring-closet visit. Field report: An end host receives an address from the wrong subnet after a port move. A colleague proposes: “Enable routing on an unrelated loopback.” Which technical assessment is best supported?

  1. The proposal overlooks the reported dependency: Access VLAN membership determines the host's Layer 2 segment.
  2. The original problem can be treated as resolved from inventory labels alone, without checking access vlan mismatch behavior.
  3. The proposed shortcut is sufficient because reset bgp on the core without examining the edge vlan.
  4. There is no need to validate the reported dependency once change the ntp source to the host subnet.

Explanation

Correct Answer

A:

The alternative does not address the actual reported dependency. Access VLAN membership determines the host's Layer 2 segment. The supported intervention is check the access-port vlan assignment against the intended subnet; acceptance should show that switchport VLAN and DHCP lease match the approved network.

Incorrect Answers

B:

The failure described in the field report requires a functional check that switchport VLAN and DHCP lease match the approved network.

C:

The proposed step “Reset BGP on the core without examining the edge VLAN” is not the required mechanism.

D:

It assumes an unrelated action establishes service recovery. Nothing about “Change the NTP source to the host subnet” demonstrates whether switchport VLAN and DHCP lease match the approved network.

Question 663

Colocation site RMA handoff. Field report: An NCS aggregation router is to receive a different line-rate transceiver. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm only that the technician attempted: assume all coherent optics work in every low-cost ethernet port.
  2. Demonstrate that the optic is supported and the link meets optical and error thresholds.
  3. Confirm the site inventory list still contains the hostname, without validating the reported service.
  4. Confirm only that the work ticket says “completed,” without testing ncs platform optics.

Explanation

Correct Answer

B:

The optic is supported and the link meets optical and error thresholds. NCS optical module support is constrained by interface design and platform release.

Incorrect Answers

A:

For example, “Assume all coherent optics work in every low-cost Ethernet port” does not demonstrate the corrected technical state.

C:

Confirm that the optic is supported and the link meets optical and error thresholds.

D:

Check whether the optic is supported and the link meets optical and error thresholds.

Question 664

Remote office replacement window. Field report: A modular Catalyst switch requires a replacement line card after a hardware fault. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm the site inventory list still contains the hostname, without validating the reported service.
  2. Confirm only that the technician attempted: copy another device's serial number to make an incompatible card pass inventory.
  3. Demonstrate that compatible PID and the card reports online in its assigned slot.
  4. Confirm only that the work ticket says “completed,” without testing catalyst line-card sku.

Explanation

Correct Answer

C:

Compatible PID and the card reports online in its assigned slot. Supported FRU compatibility is determined by chassis/module documentation.

Incorrect Answers

A:

Confirm that compatible PID and the card reports online in its assigned slot.

B:

For example, “Copy another device's serial number to make an incompatible card pass inventory” does not demonstrate the corrected technical state.

D:

Check whether compatible PID and the card reports online in its assigned slot.

Question 665

Disaster-recovery facility inspection. Field report: A replacement Catalyst switch forwards locally but its distribution uplink stays down. A colleague proposes: “Assume local host-to-host ping proves the distribution trunk is restored.” Which technical assessment is best supported?

  1. There is no need to validate the reported dependency once use the rma tracking number as an interface configuration backup.
  2. The proposed shortcut is sufficient because disable stp everywhere to force the failed uplink into forwarding.
  3. The original problem can be treated as resolved from inventory labels alone, without checking catalyst uplink recovery behavior.
  4. The proposal overlooks the reported dependency: Local switch forwarding does not establish restored uplink services.

Explanation

Correct Answer

D:

The alternative does not address the actual reported dependency. Local switch forwarding does not establish restored uplink services. The supported intervention is validate uplink optics, physical port, trunk and port-channel settings against baseline; acceptance should show that the upstream logical connection and required VLANs/routes are healthy.

Incorrect Answers

A:

It assumes an unrelated action establishes service recovery. Nothing about “Use the RMA tracking number as an interface configuration backup” demonstrates whether the upstream logical connection and required VLANs/routes are healthy.

B:

The proposed step “Disable STP everywhere to force the failed uplink into forwarding” is not the required mechanism.

C:

The failure described in the field report requires a functional check that the upstream logical connection and required VLANs/routes are healthy.

Question 666

Main campus hardware-service ticket. Field report: A UCS X-Series compute node needs replacement in a modular chassis. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Perform or retain the approved action: check compatible node, chassis slot, management and fabric dependencies; document evidence that node inventory, profile and required paths are restored.
  2. Close after recording “Assume X-Series compute nodes fit any B-Series chassis bay” without checking that node inventory, profile and required paths are restored.
  3. Apply “Rewire an IP phone port as the server backplane” as a substitute and declare success from shipment receipt alone.
  4. Defer service verification after “Use an arbitrary SSD model without checking service qualification” until the next reported incident.

Explanation

Correct Answer

A:

This handoff preserves the required corrective action and the verifiable service outcome. Modular UCS X-Series hardware depends on platform-specific compute and fabric support. Recording that node inventory, profile and required paths are restored makes the signoff testable.

Incorrect Answers

B:

This proposes a different action with no acceptance evidence. “Assume X-Series compute nodes fit any B-Series chassis bay” cannot replace the validated measure that node inventory, profile and required paths are restored.

C:

Delivery paperwork describes logistics, not recovered functionality. “Rewire an IP phone port as the server backplane” leaves the technical requirement and its validation unresolved.

D:

A future incident is not a reasonable acceptance gate for a known problem. “Use an arbitrary SSD model without checking service qualification” is not evidence that node inventory, profile and required paths are restored.

Question 667

Regional north-campus service window. Field report: A replacement room system connects to meetings but the far end sees no video. Which action is the most defensible first step?

  1. Assume a microphone level meter validates camera signaling.
  2. Inspect camera source selection, cable and video media negotiation.
  3. Rename a DHCP pool to create a missing video input.
  4. Reset every campus access switch before checking local camera connection.

Explanation

Correct Answer

B:

Camera hardware and media settings are distinct from call connectivity. The action should lead to evidence that selected camera output reaches a remote test participant.

Incorrect Answers

A:

This alternative would not solve the reported problem. Camera hardware and media settings are distinct from call connectivity. The field team must instead establish whether selected camera output reaches a remote test participant.

C:

Attempting this shortcut is not an adequate substitute for the required action. Camera hardware and media settings are distinct from call connectivity. Post-change evidence is still needed.

D:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a replacement room system connects to meetings but the far end sees no video. The relevant control is inspect camera source selection, cable and video media negotiation.

Question 668

Customer branch-site maintenance. Field report: A Nexus replacement joins the data-center network with stale code. Which action is the most defensible first step?

  1. Install an IOS XE image because both products are Cisco switches.
  2. Copy an unrelated access-switch config without feature review.
  3. Verify supported NX-OS version and feature compatibility before reapplying state.
  4. Change the server BIOS as the Nexus OS upgrade.

Explanation

Correct Answer

C:

NX-OS platforms require validated product-specific software and configuration. The action should lead to evidence that intended NX-OS release and feature/route health after upgrade.

Incorrect Answers

A:

This alternative would not solve the reported problem. NX-OS platforms require validated product-specific software and configuration. The field team must instead establish whether intended NX-OS release and feature/route health after upgrade.

B:

Attempting this shortcut is not an adequate substitute for the required action. NX-OS platforms require validated product-specific software and configuration. Post-change evidence is still needed.

D:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a nexus replacement joins the data-center network with stale code. The relevant control is verify supported nx-os version and feature compatibility before reapplying state.

Question 669

Primary data-center night shift. Field report: A replaced MDS SAN switch comes online but hosts cannot see their storage fabric. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Defer service verification after “Move the FC storage fabric into a WLAN controller” until the next reported incident.
  2. Apply “Assume an IP ping proves FC fabric login and zoning” as a substitute and declare success from shipment receipt alone.
  3. Close after recording “Configure Ethernet voice VLANs to reconstruct FC zones” without checking that FC logins, VSAN and approved storage initiator-target access.
  4. Perform or retain the approved action: validate vsan membership, fc interfaces and permitted zoning from the approved backup; document evidence that FC logins, VSAN and approved storage initiator-target access.

Explanation

Correct Answer

D:

This handoff preserves the required corrective action and the verifiable service outcome. Fibre Channel SAN reachability depends on correct VSAN, zoning and fabric state. Recording that FC logins, VSAN and approved storage initiator-target access makes the signoff testable.

Incorrect Answers

A:

A future incident is not a reasonable acceptance gate for a known problem. “Move the FC storage fabric into a WLAN controller” is not evidence that FC logins, VSAN and approved storage initiator-target access.

B:

Delivery paperwork describes logistics, not recovered functionality. “Assume an IP ping proves FC fabric login and zoning” leaves the technical requirement and its validation unresolved.

C:

This proposes a different action with no acceptance evidence. “Configure Ethernet voice VLANs to reconstruct FC zones” cannot replace the validated measure that FC logins, VSAN and approved storage initiator-target access.

Question 670

Headquarters wiring-closet visit. Field report: A supervisor replacement may briefly interrupt routing services. A colleague proposes: “Begin work immediately because the spare is on site.” Which technical assessment is best supported?

  1. The proposal overlooks the reported dependency: Hardware replacement can have service impact even when the replacement unit is supported.
  2. There is no need to validate the reported dependency once omit service acceptance tests because the module is field replaceable.
  3. The original problem can be treated as resolved from inventory labels alone, without checking change-window controls behavior.
  4. The proposed shortcut is sufficient because treat rma shipment tracking as production change approval.

Explanation

Correct Answer

A:

The alternative does not address the actual reported dependency. Hardware replacement can have service impact even when the replacement unit is supported. The supported intervention is confirm approved maintenance window, redundancy and rollback with stakeholders; acceptance should show that change authority, fallback path and acceptance criteria are recorded.

Incorrect Answers

B:

It assumes an unrelated action establishes service recovery. Nothing about “Omit service acceptance tests because the module is field replaceable” demonstrates whether change authority, fallback path and acceptance criteria are recorded.

C:

The failure described in the field report requires a functional check that change authority, fallback path and acceptance criteria are recorded.

D:

The proposed step “Treat RMA shipment tracking as production change approval” is not the required mechanism.

Supporting Cisco Devices for Field Technicians (800-150) Practice Tests