mcAfee Secure Website
exam =5
exam =6

Exam Code: 800-150

Exam Name: Supporting Cisco Devices for Field Technicians

Certification Provider: Cisco

Cisco 800-150 Questions & Answers

Reliable & Actual Study Materials for 800-150 Exam Success

100 Questions & Answers with Testing Engine

"800-150: Supporting Cisco Devices for Field Technicians" Testing Engine covers all the knowledge points of the real Cisco 800-150 exam.

The latest actual 800-150 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at 800-150 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cisco Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cisco 800-150 Practice Test 64

Question 630

Headquarters wiring-closet visit. Field report: A planned software downgrade may affect feature licensing support. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Perform or retain the approved action: verify release-specific feature and licensing requirements before downgrading; document evidence that the approved target release supports required licensed services.
  2. Defer service verification after “Treat a switch's link LEDs as full license compatibility proof” until the next reported incident.
  3. Close after recording “Assume all IOS XE features are identical across major software releases” without checking that the approved target release supports required licensed services.
  4. Apply “Disable the licensing service without reviewing supportability” as a substitute and declare success from shipment receipt alone.

Explanation

Correct Answer

A:

This handoff preserves the required corrective action and the verifiable service outcome. Software release changes can alter supported features and entitlement behavior. Recording that the approved target release supports required licensed services makes the signoff testable.

Incorrect Answers

B:

A future incident is not a reasonable acceptance gate for a known problem. “Treat a switch's link LEDs as full license compatibility proof” is not evidence that the approved target release supports required licensed services.

C:

This proposes a different action with no acceptance evidence. “Assume all IOS XE features are identical across major software releases” cannot replace the validated measure that the approved target release supports required licensed services.

D:

Delivery paperwork describes logistics, not recovered functionality. “Disable the licensing service without reviewing supportability” leaves the technical requirement and its validation unresolved.

Question 631

Colocation site RMA handoff. Field report: A workstation can reach local peers but not remote subnets. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Apply “Set the host default gateway to an unrelated subnet address” as a substitute and declare success from shipment receipt alone.
  2. Perform or retain the approved action: check that its default gateway belongs to its configured local subnet; document evidence that the host routes nonlocal traffic toward a reachable gateway.
  3. Close after recording “Replace every LAN switch before inspecting the host address” without checking that the host routes nonlocal traffic toward a reachable gateway.
  4. Defer service verification after “Disable the host NIC so it cannot send external packets” until the next reported incident.

Explanation

Correct Answer

B:

This handoff preserves the required corrective action and the verifiable service outcome. An off-link or incorrect gateway prevents normal inter-subnet forwarding. Recording that the host routes nonlocal traffic toward a reachable gateway makes the signoff testable.

Incorrect Answers

A:

Delivery paperwork describes logistics, not recovered functionality. “Set the host default gateway to an unrelated subnet address” leaves the technical requirement and its validation unresolved.

C:

This proposes a different action with no acceptance evidence. “Replace every LAN switch before inspecting the host address” cannot replace the validated measure that the host routes nonlocal traffic toward a reachable gateway.

D:

A future incident is not a reasonable acceptance gate for a known problem. “Disable the host NIC so it cannot send external packets” is not evidence that the host routes nonlocal traffic toward a reachable gateway.

Question 632

Remote office replacement window. Field report: A UCS blade boots but cannot see the assigned SAN boot target. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm the site inventory list still contains the hostname, without validating the reported service.
  2. Confirm only that the technician attempted: assume ethernet ping proves fibre channel initiator login.
  3. Demonstrate that the intended WWPN and LUN are visible through approved FC paths.
  4. Confirm only that the work ticket says “completed,” without testing server hba mapping.

Explanation

Correct Answer

C:

The intended WWPN and LUN are visible through approved FC paths. SAN boot requires correctly provisioned host bus access and storage fabric connectivity.

Incorrect Answers

A:

Confirm that the intended WWPN and LUN are visible through approved FC paths.

B:

For example, “Assume Ethernet ping proves Fibre Channel initiator login” does not demonstrate the corrected technical state.

D:

Check whether the intended WWPN and LUN are visible through approved FC paths.

Question 633

Disaster-recovery facility inspection. Field report: An interface shows a fe80:: address but requires external IPv6 connectivity. Which action is the most defensible first step?

  1. Assume a link-local address is globally routable across routers.
  2. Use an IPv4 ARP reply as the complete IPv6 route discovery process.
  3. Change an Ethernet MAC table entry to create an IPv6 route.
  4. Check global or ULA address configuration and IPv6 default-routing information.

Explanation

Correct Answer

D:

IPv6 link-local scope does not by itself provide routable IPv6 service. The action should lead to evidence that the host receives the correct IPv6 prefix and a usable default router.

Incorrect Answers

A:

This alternative would not solve the reported problem. IPv6 link-local scope does not by itself provide routable IPv6 service. The field team must instead establish whether the host receives the correct IPv6 prefix and a usable default router.

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: an interface shows a fe80:: address but requires external ipv6 connectivity. The relevant control is check global or ula address configuration and ipv6 default-routing information.

C:

Attempting this shortcut is not an adequate substitute for the required action. IPv6 link-local scope does not by itself provide routable IPv6 service. Post-change evidence is still needed.

Question 634

Main campus hardware-service ticket. Field report: An administrator must review cloud collaboration device and service provisioning. Which action is the most defensible first step?

  1. Use authorized Webex Control Hub management views.
  2. Use a UCS BIOS menu to configure every Webex identity.
  3. Edit a switch's ARP table as the cloud tenant console.
  4. Assume the meeting attendee screen grants tenant administration rights.

Explanation

Correct Answer

A:

Control Hub provides central administration for Webex services and managed resources. The action should lead to evidence that intended users or devices appear in the correct tenant administration view.

Incorrect Answers

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: an administrator must review cloud collaboration device and service provisioning. The relevant control is use authorized webex control hub management views.

C:

This alternative would not solve the reported problem. Control Hub provides central administration for Webex services and managed resources. The field team must instead establish whether intended users or devices appear in the correct tenant administration view.

D:

Attempting this shortcut is not an adequate substitute for the required action. Control Hub provides central administration for Webex services and managed resources. Post-change evidence is still needed.

Question 635

Regional north-campus service window. Field report: An on-premise IP phone receives DHCP but stays unregistered. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm only that the work ticket says “completed,” without testing call-control registration.
  2. Demonstrate that the phone shows registered in its intended call-control group.
  3. Confirm only that the technician attempted: change campus spanning-tree root before checking call-control connectivity.
  4. Confirm the site inventory list still contains the hostname, without validating the reported service.

Explanation

Correct Answer

B:

The phone shows registered in its intended call-control group. Phone address assignment does not prove call-control registration or provisioning.

Incorrect Answers

A:

Check whether the phone shows registered in its intended call-control group.

C:

For example, “Change campus spanning-tree root before checking call-control connectivity” does not demonstrate the corrected technical state.

D:

Confirm that the phone shows registered in its intended call-control group.

Question 636

Customer branch-site maintenance. Field report: A failed UCS server is swapped while its workload identity must remain consistent. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Apply “Assume management IP alone recreates WWPN/MAC/service identity policies” as a substitute and declare success from shipment receipt alone.
  2. Defer service verification after “Disable all fabric links before reassociating a profile” until the next reported incident.
  3. Perform or retain the approved action: review service profile association and hardware compatibility for the new compute node; document evidence that correct profile association and workload network/storage attachment.
  4. Close after recording “Copy the old node's printed serial label onto the new server” without checking that correct profile association and workload network/storage attachment.

Explanation

Correct Answer

C:

This handoff preserves the required corrective action and the verifiable service outcome. Service profiles can carry logical server identity and policy independent of physical node. Recording that correct profile association and workload network/storage attachment makes the signoff testable.

Incorrect Answers

A:

Delivery paperwork describes logistics, not recovered functionality. “Assume management IP alone recreates WWPN/MAC/service identity policies” leaves the technical requirement and its validation unresolved.

B:

A future incident is not a reasonable acceptance gate for a known problem. “Disable all fabric links before reassociating a profile” is not evidence that correct profile association and workload network/storage attachment.

D:

This proposes a different action with no acceptance evidence. “Copy the old node's printed serial label onto the new server” cannot replace the validated measure that correct profile association and workload network/storage attachment.

Question 637

Primary data-center night shift. Field report: A hostname fails but the management IP remains reachable. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm the site inventory list still contains the hostname, without validating the reported service.
  2. Confirm only that the technician attempted: factory reset the remote device before testing dns.
  3. Confirm only that the work ticket says “completed,” without testing dns diagnostic.
  4. Demonstrate that the target name resolves to the correct reachable address.

Explanation

Correct Answer

D:

The target name resolves to the correct reachable address. Working IP reachability with failed hostname resolution points to name-service configuration.

Incorrect Answers

A:

Confirm that the target name resolves to the correct reachable address. Working IP reachability with failed hostname resolution points to name-service configuration.

B:

For example, “Factory reset the remote device before testing DNS” does not demonstrate the corrected technical state.

C:

Check whether the target name resolves to the correct reachable address. Working IP reachability with failed hostname resolution points to name-service configuration.

Question 638

Headquarters wiring-closet visit. Field report: A Cisco rack-mounted compute host needs remote hardware management and inventory capture. Which action is the most defensible first step?

  1. Use the supported C-Series integrated management controller for hardware state.
  2. Treat a DNS query as a power supply inventory report.
  3. Replace the data-center fabric switch to read system sensors.
  4. Use a voice endpoint GUI to change server firmware.

Explanation

Correct Answer

A:

C-Series management controllers expose platform sensors, inventory and remote service controls. The action should lead to evidence that requested hardware identifiers and health sensors are recorded.

Incorrect Answers

B:

Attempting this shortcut is not an adequate substitute for the required action. C-Series management controllers expose platform sensors, inventory and remote service controls. Post-change evidence is still needed.

C:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a cisco rack-mounted compute host needs remote hardware management and inventory capture. The relevant control is use the supported c-series integrated management controller for hardware state.

D:

This alternative would not solve the reported problem. C-Series management controllers expose platform sensors, inventory and remote service controls. The field team must instead establish whether requested hardware identifiers and health sensors are recorded.

Question 639

Colocation site RMA handoff. Field report: A backup and the current router state disagree on routing statements. A colleague proposes: “Overwrite live routing with the oldest available file without review.” Which technical assessment is best supported?

  1. There is no need to validate the reported dependency once change only the device description label and assume routing aligns.
  2. The proposal overlooks the reported dependency: A controlled diff isolates intentional from accidental changes.
  3. The proposed shortcut is sufficient because treat traceroute output as a substitute for configuration diff.
  4. The original problem can be treated as resolved from inventory labels alone, without checking configuration diff behavior.

Explanation

Correct Answer

B:

The alternative does not address the actual reported dependency. A controlled diff isolates intentional from accidental changes. The supported intervention is compare the live running config to the trusted backup before reconciliation; acceptance should show that only approved deltas exist between intended and active configuration.

Incorrect Answers

A:

It assumes an unrelated action establishes service recovery. Nothing about “Change only the device description label and assume routing aligns” demonstrates whether only approved deltas exist between intended and active configuration.

C:

The proposed step “Treat traceroute output as a substitute for configuration diff” is not the required mechanism.

D:

The failure described in the field report requires a functional check that only approved deltas exist between intended and active configuration.

Question 640

Remote office replacement window. Field report: A Nexus Ethernet uplink stays down after line-card replacement. Which action is the most defensible first step?

  1. Assume a successful management ping proves the traffic port is up.
  2. Rebuild a VLAN database without checking physical interface state.
  3. Inspect NX-OS interface operational and error state for the correct slot/port.
  4. Use only a Windows registry check as evidence of the Nexus optic.

Explanation

Correct Answer

C:

NX-OS interface and module state are the relevant diagnostics for a failed uplink. The action should lead to evidence that affected interface comes up and counters remain clean.

Incorrect Answers

A:

Attempting this shortcut is not an adequate substitute for the required action. NX-OS interface and module state are the relevant diagnostics for a failed uplink. Post-change evidence is still needed.

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a nexus ethernet uplink stays down after line-card replacement. The relevant control is inspect nx-os interface operational and error state for the correct slot/port.

D:

This alternative would not solve the reported problem. NX-OS interface and module state are the relevant diagnostics for a failed uplink. The field team must instead establish whether affected interface comes up and counters remain clean.

Supporting Cisco Devices for Field Technicians (800-150) Practice Tests