mcAfee Secure Website
exam =5
exam =6

Exam Code: 800-150

Exam Name: Supporting Cisco Devices for Field Technicians

Certification Provider: Cisco

Cisco 800-150 Questions & Answers

Reliable & Actual Study Materials for 800-150 Exam Success

100 Questions & Answers with Testing Engine

"800-150: Supporting Cisco Devices for Field Technicians" Testing Engine covers all the knowledge points of the real Cisco 800-150 exam.

The latest actual 800-150 Questions & Answers from Pass4sure. Everything you need to prepare and get best score at 800-150 exam easily and quickly.

exam =7
Guarantee

Satisfaction Guaranteed

Pass4sure has a remarkable Cisco Candidate Success record. We're confident of our products and provide no hassle product exchange. That's how confident we are!

99.3% Pass Rate
Was: $137.49
Now: $124.99

Cisco 800-150 Practice Test 49

Question 480

Headquarters wiring-closet visit. Field report: An engineer intends to upgrade a production aggregation router. Which action is the most defensible first step?

  1. Review release notes, hardware compatibility, dependencies and rollback plan first.
  2. Treat a copy of the installer as equivalent to a successful device backup.
  3. Ignore peer redundancy and force every supervisor down together.
  4. Start the reload before checking the approved maintenance window.

Explanation

Correct Answer

A:

Compatibility and recovery preparation reduce the risk of outage during software changes. The action should lead to evidence that approved window, hardware support, backups and fallback are recorded.

Incorrect Answers

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: an engineer intends to upgrade a production aggregation router. The relevant control is review release notes, hardware compatibility, dependencies and rollback plan first.

C:

Attempting this shortcut is not an adequate substitute for the required action. Compatibility and recovery preparation reduce the risk of outage during software changes. Post-change evidence is still needed.

D:

This alternative would not solve the reported problem. Compatibility and recovery preparation reduce the risk of outage during software changes. The field team must instead establish whether approved window, hardware support, backups and fallback are recorded.

Question 481

Colocation site RMA handoff. Field report: A meeting room unit cannot reach conferencing services after port reconfiguration. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm the site inventory list still contains the hostname, without validating the reported service.
  2. Demonstrate that registration and a supported test call with media in both directions.
  3. Confirm only that the technician attempted: rebuild the endpoint's local clock as the only network fix.
  4. Confirm only that the work ticket says “completed,” without testing video endpoint ports.

Explanation

Correct Answer

B:

Registration and a supported test call with media in both directions. Collaboration endpoints need both network reachability and service-specific permitted flows.

Incorrect Answers

A:

Confirm that registration and a supported test call with media in both directions.

C:

For example, “Rebuild the endpoint's local clock as the only network fix” does not demonstrate the corrected technical state.

D:

Check whether registration and a supported test call with media in both directions.

Question 482

Remote office replacement window. Field report: A server rack uses integrated compute chassis and fabric interconnects. Which action is the most defensible first step?

  1. Treat every UCS blade as a standalone telephone controller.
  2. Use an SFP optic as the compute processor.
  3. Identify the Cisco UCS server, fabric interconnect and management-plane roles.
  4. Classify fabric interconnects as residential Wi-Fi routers.

Explanation

Correct Answer

C:

UCS combines servers with infrastructure and centralized compute management. The action should lead to evidence that server inventory and fabric connectivity in the supported UCS manager.

Incorrect Answers

A:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a server rack uses integrated compute chassis and fabric interconnects. The relevant control is identify the cisco ucs server, fabric interconnect and management-plane roles.

B:

Attempting this shortcut is not an adequate substitute for the required action. UCS combines servers with infrastructure and centralized compute management. Post-change evidence is still needed.

D:

This alternative would not solve the reported problem. UCS combines servers with infrastructure and centralized compute management. The field team must instead establish whether server inventory and fabric connectivity in the supported UCS manager.

Question 483

Disaster-recovery facility inspection. Field report: A field workstation pings its gateway but cannot connect to the far device subnet. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm the site inventory list still contains the hostname, without validating the reported service.
  2. Confirm only that the technician attempted: change the pc wallpaper to reset route discovery.
  3. Confirm only that the work ticket says “completed,” without testing windows route test.
  4. Demonstrate that the route to the remote device follows the intended next hops.

Explanation

Correct Answer

D:

The route to the remote device follows the intended next hops. Hop-by-hop trace can help localize a routed path problem while ICMP handling is considered.

Incorrect Answers

A:

Confirm that the route to the remote device follows the intended next hops.

B:

For example, “Change the PC wallpaper to reset route discovery” does not demonstrate the corrected technical state.

C:

Check whether the route to the remote device follows the intended next hops.

Question 484

Main campus hardware-service ticket. Field report: A campus voice system needs central call setup and device registration. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Demonstrate that an authorized phone registers and can place a test call.
  2. Confirm the site inventory list still contains the hostname, without validating the reported service.
  3. Confirm only that the technician attempted: use a web meeting client as the sole on-premises call controller.
  4. Confirm only that the work ticket says “completed,” without testing cisco ucm role.

Explanation

Correct Answer

A:

An authorized phone registers and can place a test call. Cisco UCM provides call control and device management in on-premises deployments.

Incorrect Answers

B:

Confirm that an authorized phone registers and can place a test call. Cisco UCM provides call control and device management in on-premises deployments.

C:

For example, “Use a web meeting client as the sole on-premises call controller” does not demonstrate the corrected technical state.

D:

Check whether an authorized phone registers and can place a test call. Cisco UCM provides call control and device management in on-premises deployments.

Question 485

Regional north-campus service window. Field report: A replacement power/cooling module has a different airflow direction from the installed set. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Confirm the site inventory list still contains the hostname, without validating the reported service.
  2. Demonstrate that airflow direction matches the chassis design and temperatures remain normal.
  3. Confirm only that the work ticket says “completed,” without testing airflow orientation.
  4. Confirm only that the technician attempted: block the exhaust path to force recirculation.

Explanation

Correct Answer

B:

Airflow direction matches the chassis design and temperatures remain normal. Mixed airflow modules can cause thermal recirculation and overheating.

Incorrect Answers

A:

Confirm that airflow direction matches the chassis design and temperatures remain normal.

C:

Check whether airflow direction matches the chassis design and temperatures remain normal.

D:

For example, “Block the exhaust path to force recirculation” does not demonstrate the corrected technical state.

Question 486

Customer branch-site maintenance. Field report: A branch ISR router has a failing interface module and limited spare slots. Which action is the most defensible first step?

  1. Assume a universal PCI card works in all ISR module bays.
  2. Install an MDS Fibre Channel line card into the ISR.
  3. Choose an approved ISR network interface module for the exact model and slot.
  4. Swap the WAN IP address onto an unused console port.

Explanation

Correct Answer

C:

ISR interface modules have explicit supported chassis and slot requirements. The action should lead to evidence that the module is recognized and branch WAN connectivity is restored.

Incorrect Answers

A:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a branch isr router has a failing interface module and limited spare slots. The relevant control is choose an approved isr network interface module for the exact model and slot.

B:

This alternative would not solve the reported problem. ISR interface modules have explicit supported chassis and slot requirements. The field team must instead establish whether the module is recognized and branch WAN connectivity is restored.

D:

Attempting this shortcut is not an adequate substitute for the required action. ISR interface modules have explicit supported chassis and slot requirements. Post-change evidence is still needed.

Question 487

Primary data-center night shift. Field report: An operations team is mapping Ethernet server traffic and Fibre Channel storage paths. The shift lead must choose a return-to-service note for this ticket. Which handoff is technically adequate?

  1. Close after recording “Treat every Fibre Channel frame as an Ethernet access VLAN” without checking that correct Ethernet and FC paths are documented and operational.
  2. Defer service verification after “Assume storage initiators communicate via DNS alone without storage fabric connectivity” until the next reported incident.
  3. Apply “Use a voice handset to aggregate FC fabric logins” as a substitute and declare success from shipment receipt alone.
  4. Perform or retain the approved action: distinguish nexus lan switching from mds san switching in the architecture; document evidence that correct Ethernet and FC paths are documented and operational.

Explanation

Correct Answer

D:

This handoff preserves the required corrective action and the verifiable service outcome. LAN and SAN fabrics may use different protocols and specialized switch families. Recording that correct Ethernet and FC paths are documented and operational makes the signoff testable.

Incorrect Answers

A:

This proposes a different action with no acceptance evidence. “Treat every Fibre Channel frame as an Ethernet access VLAN” cannot replace the validated measure that correct Ethernet and FC paths are documented and operational.

B:

A future incident is not a reasonable acceptance gate for a known problem. “Assume storage initiators communicate via DNS alone without storage fabric connectivity” is not evidence that correct Ethernet and FC paths are documented and operational.

C:

Delivery paperwork describes logistics, not recovered functionality. “Use a voice handset to aggregate FC fabric logins” leaves the technical requirement and its validation unresolved.

Question 488

Headquarters wiring-closet visit. Field report: A new branch laptop self-assigns 169.254.x.x instead of a site lease. The approved intervention is complete. What observation provides the strongest technical acceptance evidence?

  1. Demonstrate that the host acquires an intended address, mask, gateway and DNS options.
  2. Confirm the site inventory list still contains the hostname, without validating the reported service.
  3. Confirm only that the work ticket says “completed,” without testing dhcp assignment.
  4. Confirm only that the technician attempted: set all hosts to the same static address as the gateway.

Explanation

Correct Answer

A:

The host acquires an intended address, mask, gateway and DNS options. Automatic link-local IPv4 addressing often indicates the host obtained no DHCP lease.

Incorrect Answers

B:

Confirm that the host acquires an intended address, mask, gateway and DNS options.

C:

Check whether the host acquires an intended address, mask, gateway and DNS options.

D:

For example, “Set all hosts to the same static address as the gateway” does not demonstrate the corrected technical state.

Question 489

Colocation site RMA handoff. Field report: A technician must stage a signed IOS XE release before a controlled activation. Which action is the most defensible first step?

  1. Immediately delete the old image before the new image is validated.
  2. Use the platform-supported `install add` operation on the validated image.
  3. Use a random binary with matching file extension without checking platform.
  4. Change only the device hostname and call it a software upgrade.

Explanation

Correct Answer

B:

The add stage admits and validates a software package for subsequent activation. The action should lead to evidence that the intended release is present and eligible in install state.

Incorrect Answers

A:

This alternative would not solve the reported problem. The add stage admits and validates a software package for subsequent activation. The field team must instead establish whether the intended release is present and eligible in install state.

C:

Attempting this shortcut is not an adequate substitute for the required action. The add stage admits and validates a software package for subsequent activation. Post-change evidence is still needed.

D:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a technician must stage a signed ios xe release before a controlled activation. The relevant control is use the platform-supported `install add` operation on the validated image.

Question 490

Remote office replacement window. Field report: A Nexus Fabric Extender connects remote host-facing ports to its controlling parent. Which action is the most defensible first step?

  1. Configure the FEX as an unrelated standalone routing peer without parent support.
  2. Treat every FEX as a UCS blade server.
  3. Verify FEX fabric uplinks and parent-switch association.
  4. Change the site DHCP lease solely to make parent association happen.

Explanation

Correct Answer

C:

FEX host ports are controlled through a supported parent Nexus relationship. The action should lead to evidence that the FEX appears online with its expected host interfaces.

Incorrect Answers

A:

This alternative would not solve the reported problem. FEX host ports are controlled through a supported parent Nexus relationship. The field team must instead establish whether the FEX appears online with its expected host interfaces.

B:

That change addresses a different aspect of the environment and leaves this requirement unresolved: a nexus fabric extender connects remote host-facing ports to its controlling parent. The relevant control is verify fex fabric uplinks and parent-switch association.

D:

Attempting this shortcut is not an adequate substitute for the required action. FEX host ports are controlled through a supported parent Nexus relationship. Post-change evidence is still needed.

Supporting Cisco Devices for Field Technicians (800-150) Practice Tests